HOUSTON SH 7 (0335-02-035)

Items: 144

County: HOUSTON
Length: N/A
Highway: SH 7
District: LUFKIN
Control Number: 0335-02-035
DBE Goal: N/A
Project: BR 2022(632)
Guaranty: N/A
Time: 516 WORKING DAYS
Engineer's Estimate: $28,200,985.93
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JESSE SISCO
PRAVEEN RAMANATHAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$28,200,985.93
$31,995,093.82
Over/Under Est: 13.45% $3,794,107.89
$37,786,983.94
Over/Under Est: 33.99% $9,585,998.01
Amt Left: 18.1% $5,791,890.12
Over/Under Est: 36.23% $10,218,302.09
Amt Left: 20.08% $6,424,194.20
Delta: -1.67% -$632,304.08
$38,861,113.60
Over/Under Est: 37.8% $10,660,127.67
Amt Left: 21.46% $6,866,019.78
Delta: -1.15% -$441,825.58
Subcontractor Percentage Amount
BIG CREEK CONSTRUCTION, LTD. 9.62% $3,137,107.10
CHOCTAW ERECTORS, INC. 2.21% $720,686.77
HERMANOS STEEL, LLC 0.87% $283,709.27
MORRIS COUNTY CONTRACTORS, L.L.C. 0.84% $273,926.19
AARON CONCRETE CONTRACTORS, LLC 0.53% $172,834.38
STRIPING TECHNOLOGY, L.P. 0.44% $143,485.15
J. H. ODEN CONTRACTING COMPANY 0.28% $91,308.73
PINNACLE GRINDING AND GROOVING LLC 0.20% $65,220.52
DUSTROL, INC. 0.18% $58,698.47
AREA WIDE PROTECTIVE, INC. 0.06% $19,566.16
REPUBLIC COMPOSITE STUD WELDING 0.05% $16,305.13
SEMARCK LANDSCAPE SERVICES, INC. 0.02% $6,522.05
Total: 15.30% $4,989,369.92

Bid Items & Bid Tabulations

144 Total 0 of 144
HOUSTON  |  SH 7  |  LUFKIN  |  0335-02-035  |  06/02/2022  |  $28,200,985.93  |  BR 2022(632)  |  BRIDGE REPL  |  516 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
A. L. HELMCAMP, INC.
HARPER BROTHERS CONSTRUCTION LLC
WEBBER, LLC
PREPARING ROW
STA 181.580 $1,000.000 $3,500.000 $10,000.000 $5,000.000 $21,202.780
REMOVING CONC (RIPRAP)
SY 1,876.000 $20.000 $5.000 $40.000 $15.000 $9.500
REMOVING STAB BASE & ASPH PAV (8"-19")
SY 19,557.000 $10.000 $3.000 $14.000 $5.000 $5.930
OBLITERATING ABANDONED ROAD
SY 1,800.000 $3.600 $5.000 $5.000 $5.000 $6.680
EXCAVATION (ROADWAY)
CY 22,052.000 $9.000 $8.000 $14.000 $25.000 $3.380
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 116,327.000 $10.000 $8.000 $16.000 $12.370 $11.260
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 109,025.000 $10.000 $8.000 $16.000 $12.420 $12.280
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 70.000 $110.000 $160.000 $250.000 $1,500.000 $239.260
FURNISHING AND PLACING TOPSOIL (4")
SY 132,817.000 $3.000 $0.600 $1.000 $5.160 $0.610
ROLL SODDING
SY 7,631.000 $3.500 $5.000 $5.500 $5.250 $3.140
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 75,499.000 $1.000 $0.130 $0.190 $0.180 $0.120
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 56,893.000 $1.000 $0.130 $0.190 $0.150 $0.120
BROADCAST SEED (TEMP) (WARM)
SY 66,197.000 $1.000 $0.120 $0.150 $0.130 $0.110
BROADCAST SEED (TEMP) (COOL)
SY 66,197.000 $1.000 $0.120 $0.150 $0.130 $0.110
VEGETATIVE WATERING
MG 6,062.000 $15.000 $16.000 $1.850 $35.000 $33.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 132,387.000 $1.500 $0.800 $1.000 $0.890 $0.720
WILDFLOWER SEEDING
AC 27.360 $1,000.000 $800.000 $1,418.000 $900.000 $1,053.490
SPRINKLING (DUST CONTROL)
MG 242.600 $5.000 $16.000 $10.000 $35.000 $13.340
FB(CMP IN PLC)(TY D GR 1-2 OR 5)(12")
SY 48,496.000 $12.000 $30.000 $24.600 $35.000 $33.350
CEMENT
TON 1,646.000 $165.000 $220.000 $260.000 $220.000 $228.900
CEMENT TREAT (NEW BASE)(12")
SY 48,496.000 $3.000 $2.000 $3.900 $5.000 $2.910
CEMENT TREAT (SUBGRADE)(12")
SY 50,348.000 $1.000 $2.000 $3.900 $5.000 $2.560
ASPH (RC-250)
TON 427.000 $900.000 $1,500.000 $230.000 $1,494.000 $1,494.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 594.000 $150.000 $160.000 $176.000 $154.500 $154.500
AGGR (TY E OR L, PE OR PL GR 4)
CY 547.000 $175.000 $160.000 $183.000 $154.500 $154.500
AGGR (TY E OR L GR 5)
CY 383.000 $200.000 $147.000 $262.000 $143.000 $143.000
ASPH (AC-15P OR CRS-2P)
TON 277.000 $900.000 $1,475.000 $1,180.000 $1,432.000 $1,432.000
PLANE ASPH CONC PAV(0" TO 4")
SY 6,327.000 $2.500 $2.000 $4.000 $3.000 $2.850
PLANE ASPH CONC PAV (4")
SY 3,020.000 $5.000 $2.000 $8.000 $3.000 $2.850
PLANE ASPH CONC PAV (0" TO 5")
SY 5,648.000 $4.000 $2.000 $7.000 $3.000 $3.500
CEM STABIL BKFL
CY 921.000 $180.000 $100.000 $245.000 $75.000 $153.860
FLOWABLE BACKFILL
CY 2.000 $200.000 $600.000 $1,250.000 $315.000 $500.000
TEMPORARY SPL SHORING
SF 430.000 $20.000 $25.000 $75.000 $45.000 $10.000
DRILL SHAFT (18 IN)
LF 568.000 $80.000 $110.000 $190.000 $200.000 $151.790
DRILL SHAFT (36 IN)
LF 5,086.000 $150.000 $185.000 $255.000 $300.000 $255.850
DRILL SHAFT (60 IN)
LF 996.000 $400.000 $620.000 $725.000 $900.000 $655.860
DRILL SHAFT (72 IN)
LF 1,240.000 $550.000 $1,695.000 $1,250.000 $1,255.000 $851.400
CL A CONC (MISC)
CY 3.000 $750.000 $1,600.000 $950.000 $1,000.000 $1,000.000
CL C CONC (ABUT)
CY 206.300 $1,000.000 $1,400.000 $1,080.000 $1,300.000 $1,391.180
CL C CONC (BENT)(MASS)
CY 156.800 $1,200.000 $1,400.000 $765.000 $1,200.000 $803.150
CL C CONC (CAP)
CY 509.800 $1,100.000 $1,200.000 $1,340.000 $1,800.000 $1,822.540
CL C CONC (CAP)(MASS)
CY 243.800 $620.000 $1,100.000 $1,460.000 $2,000.000 $1,118.860
CL C CONC (COLUMN)
CY 161.300 $1,200.000 $1,600.000 $1,225.000 $2,000.000 $1,930.940
CL C CONC (COLUMN)(MASS)
CY 192.000 $500.000 $1,500.000 $1,500.000 $2,000.000 $1,084.280
REINF CONC SLAB
SF 160,264.000 $15.000 $20.000 $21.900 $20.000 $25.390
APPROACH SLAB
CY 207.200 $550.000 $725.000 $995.000 $1,000.000 $957.440
PRESTR CONC GIRDER (TX34)
LF 8,013.000 $160.000 $165.000 $196.000 $213.000 $195.200
PRESTR CONC GIRDER (TX54)
LF 8,964.000 $180.000 $200.000 $192.000 $239.000 $234.350
RIPRAP (CONC)(5 IN)
CY 238.000 $550.000 $480.000 $680.000 $700.000 $893.380
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 35.000 $150.000 $215.000 $109.000 $200.000 $114.690
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 12.000 $250.000 $215.000 $200.000 $210.000 $182.960
RIPRAP (STONE PROTECTION)(18 IN)
CY 517.000 $140.000 $175.000 $175.000 $210.000 $134.310
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,809.000 $175.000 $185.000 $175.000 $200.000 $117.040
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $329.390 $600.000 $1,525.000 $840.000 $859.150
ELASTOMERIC BEARING (E7)
EA 6.000 $3,000.000 $6,000.000 $4,400.000 $3,550.000 $4,618.180
ELASTOMERIC BEARING (F7)
EA 6.000 $3,000.000 $6,000.000 $4,400.000 $3,550.000 $4,618.180
SLIDING ELASTOMERIC BEARING (ES 6)
EA 12.000 $2,500.000 $6,000.000 $3,500.000 $2,800.000 $3,674.030
STR STEEL (PLATE GIRDER)
LB 1,967,803.000 $2.200 $2.000 $2.330 $3.000 $2.310
RAIL (TY SSTR)
LF 5,794.000 $60.000 $55.000 $60.000 $60.000 $54.080
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,370.000 $90.000 $65.000 $60.000 $65.000 $61.250
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 272.000 $100.000 $230.000 $200.000 $200.000 $192.260
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 91.000 $100.000 $230.000 $175.000 $200.000 $192.130
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 276.000 $110.000 $150.000 $100.000 $200.000 $106.960
GABIONS (3' X 3')(GALV)
CY 150.000 $222.900 $400.000 $400.000 $350.000 $235.820
GABION (1.5' X 3')(GALV)
CY 50.000 $292.990 $400.000 $375.000 $350.000 $309.680
CONC BOX CULV (3 FT X 3 FT)
LF 42.000 $350.000 $340.000 $570.000 $400.000 $291.840
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 97.000 $550.000 $340.000 $540.000 $400.000 $301.220
RC PIPE (CL III)(24 IN)
LF 284.000 $100.000 $75.000 $80.000 $150.000 $103.430
RC PIPE (CL III)(30 IN)
LF 132.000 $150.000 $125.000 $125.000 $200.000 $107.960
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
EA 2.000 $6,700.000 $8,000.000 $14,000.000 $11,000.000 $6,258.200
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 2.000 $6,000.000 $10,000.000 $9,500.000 $14,000.000 $6,796.900
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $7,500.000 $15,000.000 $12,400.000 $16,000.000 $12,445.070
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 4.000 $850.000 $2,500.000 $1,350.000 $2,700.000 $1,562.010
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $900.000 $2,500.000 $1,540.000 $3,000.000 $2,304.020
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 1.000 $2,000.000 $3,000.000 $1,800.000 $3,500.000 $1,621.010
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 2.000 $187,500.000 $300,000.000 $450,000.000 $250,000.000 $295,144.630
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $300,000.000 $225,000.000 $415,000.000 $1,000,000.000 $509,477.940
REMOV STR (PIPE)
EA 6.000 $500.000 $1,200.000 $990.000 $500.000 $503.420
MOBILIZATION
LS 1.000 $2,556,000.000 $3,000,000.000 $3,550,000.000 $1,500,000.000 $3,850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $3,500.000 $5,500.000 $25,000.000 $5,000.000 $673.790
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,680.000 $30.000 $38.000 $30.000 $38.000 $34.000
ROCK FILTER DAMS (REMOVE)
LF 1,680.000 $8.000 $12.000 $10.000 $12.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 776.000 $35.000 $44.000 $30.000 $44.000 $27.140
CONSTRUCTION EXITS (REMOVE)
SY 776.000 $8.000 $12.000 $10.000 $12.000 $7.130
CONSTRUCTION PERIMETER FENCE
LF 5,420.000 $5.000 $4.000 $4.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 36,884.000 $2.500 $3.250 $3.000 $3.250 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 36,884.000 $0.750 $0.400 $0.800 $0.400 $0.650
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $5.270 $5.500 $6.000 $5.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.080 $1.000 $1.000 $1.000 $2.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 153.000 $10.000 $10.000 $92.000 $24.310 $16.240
PTB (FUR & INST)(STEEL)
LF 7,770.000 $25.000 $55.000 $60.000 $68.000 $59.570
PTB (MOVE)(STEEL)
LF 2,700.000 $25.000 $9.000 $10.000 $10.000 $14.580
PTB (REMOVE)(STEEL)
LF 7,770.000 $25.000 $9.000 $7.750 $3.000 $4.100
DRIVEWAYS (CONC)
SY 2,446.000 $80.000 $70.000 $90.000 $70.000 $71.610
DRIVEWAYS (ACP)
SY 4,965.000 $40.000 $46.000 $45.000 $70.000 $71.530
RUMBLE STRIPS (SHOULDER)
LF 24,416.000 $0.300 $0.250 $0.530 $0.150 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 12,208.000 $0.200 $0.300 $0.530 $0.150 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 1,462.500 $20.000 $27.000 $26.250 $24.300 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,000.000 $1,800.000 $1,880.000 $2,048.000 $1,650.000
REMOVE METAL BEAM GUARD FENCE
LF 1,507.000 $250.000 $3.000 $2.350 $2.500 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,600.000 $3,200.000 $3,175.000 $3,047.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $280.000 $200.000 $260.000 $345.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,200.000 $2,500.000 $1,815.000 $5,000.000 $2,750.000
CRASH CUSH ATTEN (REMOVE)
EA 12.000 $900.000 $1,000.000 $1,515.000 $3,000.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $7,500.000 $10,000.000 $9,715.000 $10,000.000 $9,670.000
WIRE FENCE (TY C)
LF 583.000 $20.000 $10.000 $15.000 $25.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $750.000 $510.000 $773.000 $736.000 $800.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 28.000 $350.000 $375.000 $414.000 $394.000 $510.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $450.000 $475.000 $513.000 $489.000 $600.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $1,800.000 $2,785.000 $2,650.000 $2,650.000
REMOVE SM RD SN SUP&AM
EA 31.000 $90.000 $60.000 $96.000 $92.000 $20.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 78.000 $20.000 $20.000 $25.000 $25.000 $19.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 6.000 $25.000 $25.000 $35.000 $30.000 $19.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $30.000 $35.000 $35.000 $35.000 $24.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 122,405.000 $0.250 $0.180 $0.190 $0.350 $0.180
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 111,001.000 $0.250 $0.180 $0.190 $0.350 $0.180
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,435.000 $4.000 $3.500 $3.700 $5.000 $3.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 36,323.000 $1.000 $0.750 $0.790 $1.500 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,629.000 $1.100 $0.750 $0.790 $1.500 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,442.000 $1.500 $1.700 $0.790 $0.250 $0.630
PAVEMENT SEALER 4"
LF 14,416.000 $0.500 $0.200 $0.210 $0.450 $0.200
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 28,696.000 $0.300 $0.500 $0.530 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,500.000 $0.300 $1.000 $1.050 $0.450 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 23,698.000 $0.300 $0.500 $0.530 $0.450 $0.550
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,629.000 $0.500 $1.000 $1.050 $1.500 $1.000
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 7,629.000 $0.500 $1.000 $1.050 $1.500 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 12.000 $15.000 $20.000 $21.000 $18.000 $20.000
REFL PAV MRKR TY II-A-A
EA 652.000 $3.500 $3.500 $3.680 $5.500 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 39,963.000 $0.400 $0.300 $0.320 $0.600 $0.300
PAV SURF PREP FOR MRK (4")
LF 67,652.000 $0.050 $0.050 $0.050 $0.200 $0.050
PAV SURF PREP FOR MRK (24")
LF 12.000 $0.750 $3.000 $3.150 $1.000 $3.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.500 $10,000.000 $2,000.000 $175,000.000 $5,500.000 $2,000.000
D-GR HMA TY-D PG64-22
TON 185.000 $200.000 $380.000 $155.000 $369.500 $369.500
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 1,741.000 $150.000 $165.000 $155.000 $161.000 $161.000
SP MIXES SP-C PG70-22
TON 1,161.000 $150.000 $168.000 $150.000 $163.500 $163.500
SP MIXES SP-C SAC-A PG70-22
TON 7,837.000 $140.000 $149.000 $148.000 $145.000 $145.000
TACK COAT
GAL 7,122.000 $5.000 $7.000 $5.000 $6.500 $4.500
TIP TESTING(DRILL SHAFT)
EA 7.000 $5,000.000 $6,000.000 $6,500.000 $7,257.580 $7,008.100
TEMPORARY CONSTRUCTION MATTING
SY 1,282.000 $350.000 $70.000 $130.000 $125.000 $50.000
INSTALL FTB
LF 730.000 $75.000 $50.000 $50.000 $77.760 $40.720
REMOVE FTB
LF 730.000 $15.000 $25.000 $17.000 $15.870 $3.570
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $17,500.000 $15,000.000 $16,500.000
TMA (STATIONARY)
DAY 645.000 $200.000 $175.000 $100.000 $72.000 $184.000
TMA (MOBILE OPERATION)
DAY 38.000 $1,500.000 $175.000 $200.000 $500.000 $750.120
Totals: $28,200,985.930 $31,995,093.820 $37,786,983.945 $38,419,288.020 $38,861,113.637