Job Info for 0335-02-035

County: HOUSTON Highway: SH 7 Date: 06/02/2022 (2 years ago) Engineer's Estimate: $28,200,986 Control Number: 0335-02-035
Project: BR 2022(632) District: LUFKIN Time: 516 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $28,200,985.93
R CONSTRUCTION CIVIL, LLC   $31,995,093.82 1
13.45% | $3,794,107.89
A. L. HELMCAMP, INC.   $37,786,983.94 2
33.99% | $9,585,998.01
18.1% | $5,791,890.12
HARPER BROTHERS CONSTRUCTION LLC   $38,419,288.02 3
36.23% | $10,218,302.09
20.08% | $6,424,194.20
1.67% | $632,304.08
WEBBER, LLC   $38,861,113.60 4
37.8% | $10,660,127.67
21.46% | $6,866,019.78
1.15% | $441,825.58
Subcontractor Percentage Amount
BIG CREEK CONSTRUCTION, LTD. 9.80% $3,135,519.19
CHOCTAW ERECTORS, INC. 2.25% $719,889.61
HERMANOS STEEL, LLC 0.88% $281,556.83
MORRIS COUNTY CONTRACTORS, L.L.C. 0.85% $271,958.30
AARON CONCRETE CONTRACTORS, LLC 0.53% $169,574.00
STRIPING TECHNOLOGY, L.P. 0.45% $143,977.92
J. H. ODEN CONTRACTING COMPANY 0.28% $89,586.26
PINNACLE GRINDING AND GROOVING LLC 0.20% $63,990.19
DUSTROL, INC. 0.18% $57,591.17
AREA WIDE PROTECTIVE, INC. 0.06% $19,197.06
PENHALL COMPANY 0.04% $12,798.04
SEMARCK LANDSCAPE SERVICES, INC. 0.01% $3,199.51
Total: 15.53% $4,968,838.08

Bid Items

Items: 144, 0 filtered
HOUSTON SH 7  |  LUFKIN  |  0335-02-035  |  06/02/2022  |  $28,200,986  |  BR 2022(632)  |  BRIDGE REPL  |  516 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate R CONSTRUCTION CIVIL, LLC A. L. HELMCAMP, INC. HARPER BROTHERS CONSTRUCTION LLC WEBBER, LLC
100 6002 PREPARING ROW STA 181.580 $1,000.000 $3,500.000 $10,000.000 $5,000.000 $21,202.780
104 6009 REMOVING CONC (RIPRAP) SY 1,876.000 $20.000 $5.000 $40.000 $15.000 $9.500
105 6109 REMOVING STAB BASE & ASPH PAV (8"-19") SY 19,557.000 $10.000 $3.000 $14.000 $5.000 $5.930
106 6002 OBLITERATING ABANDONED ROAD SY 1,800.000 $3.600 $5.000 $5.000 $5.000 $6.680
110 6001 EXCAVATION (ROADWAY) CY 22,052.000 $9.000 $8.000 $14.000 $25.000 $3.380
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 116,327.000 $10.000 $8.000 $16.000 $12.370 $11.260
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 109,025.000 $10.000 $8.000 $16.000 $12.420 $12.280
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 70.000 $110.000 $160.000 $250.000 $1,500.000 $239.260
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 132,817.000 $3.000 $0.600 $1.000 $5.160 $0.610
162 6008 ROLL SODDING SY 7,631.000 $3.500 $5.000 $5.500 $5.250 $3.140
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 75,499.000 $1.000 $0.130 $0.190 $0.180 $0.120
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 56,893.000 $1.000 $0.130 $0.190 $0.150 $0.120
164 6009 BROADCAST SEED (TEMP) (WARM) SY 66,197.000 $1.000 $0.120 $0.150 $0.130 $0.110
164 6011 BROADCAST SEED (TEMP) (COOL) SY 66,197.000 $1.000 $0.120 $0.150 $0.130 $0.110
168 6001 VEGETATIVE WATERING MG 6,062.000 $15.000 $16.000 $1.850 $35.000 $33.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 132,387.000 $1.500 $0.800 $1.000 $0.890 $0.720
180 6001 WILDFLOWER SEEDING AC 27.360 $1,000.000 $800.000 $1,418.000 $900.000 $1,053.490
204 6003 SPRINKLING (DUST CONTROL) MG 242.600 $5.000 $16.000 $10.000 $35.000 $13.340
247 6491 FB(CMP IN PLC)(TY D GR 1-2 OR 5)(12") SY 48,496.000 $12.000 $30.000 $24.600 $35.000 $33.350
275 6001 CEMENT TON 1,646.000 $165.000 $220.000 $260.000 $220.000 $228.900
275 6035 CEMENT TREAT (NEW BASE)(12") SY 48,496.000 $3.000 $2.000 $3.900 $5.000 $2.910
275 6080 CEMENT TREAT (SUBGRADE)(12") SY 50,348.000 $1.000 $2.000 $3.900 $5.000 $2.560
316 6060 ASPH (RC-250) TON 427.000 $900.000 $1,500.000 $230.000 $1,494.000 $1,494.000
316 6402 AGGR (TY-PE, E, L OR PL GR 3) CY 594.000 $150.000 $160.000 $176.000 $154.500 $154.500
316 6416 AGGR (TY E OR L, PE OR PL GR 4) CY 547.000 $175.000 $160.000 $183.000 $154.500 $154.500
316 6417 AGGR (TY E OR L GR 5) CY 383.000 $200.000 $147.000 $262.000 $143.000 $143.000
316 6530 ASPH (AC-15P OR CRS-2P) TON 277.000 $900.000 $1,475.000 $1,180.000 $1,432.000 $1,432.000
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 6,327.000 $2.500 $2.000 $4.000 $3.000 $2.850
354 6057 PLANE ASPH CONC PAV (4") SY 3,020.000 $5.000 $2.000 $8.000 $3.000 $2.850
354 6088 PLANE ASPH CONC PAV (0" TO 5") SY 5,648.000 $4.000 $2.000 $7.000 $3.000 $3.500
400 6005 CEM STABIL BKFL CY 921.000 $180.000 $100.000 $245.000 $75.000 $153.860
401 6001 FLOWABLE BACKFILL CY 2.000 $200.000 $600.000 $1,250.000 $315.000 $500.000
403 6001 TEMPORARY SPL SHORING SF 430.000 $20.000 $25.000 $75.000 $45.000 $10.000
416 6001 DRILL SHAFT (18 IN) LF 568.000 $80.000 $110.000 $190.000 $200.000 $151.790
416 6004 DRILL SHAFT (36 IN) LF 5,086.000 $150.000 $185.000 $255.000 $300.000 $255.850
416 6008 DRILL SHAFT (60 IN) LF 996.000 $400.000 $620.000 $725.000 $900.000 $655.860
416 6010 DRILL SHAFT (72 IN) LF 1,240.000 $550.000 $1,695.000 $1,250.000 $1,255.000 $851.400
420 6002 CL A CONC (MISC) CY 3.000 $750.000 $1,600.000 $950.000 $1,000.000 $1,000.000
420 6013 CL C CONC (ABUT) CY 206.300 $1,000.000 $1,400.000 $1,080.000 $1,300.000 $1,391.180
420 6027 CL C CONC (BENT)(MASS) CY 156.800 $1,200.000 $1,400.000 $765.000 $1,200.000 $803.150
420 6029 CL C CONC (CAP) CY 509.800 $1,100.000 $1,200.000 $1,340.000 $1,800.000 $1,822.540
420 6031 CL C CONC (CAP)(MASS) CY 243.800 $620.000 $1,100.000 $1,460.000 $2,000.000 $1,118.860
420 6037 CL C CONC (COLUMN) CY 161.300 $1,200.000 $1,600.000 $1,225.000 $2,000.000 $1,930.940
420 6039 CL C CONC (COLUMN)(MASS) CY 192.000 $500.000 $1,500.000 $1,500.000 $2,000.000 $1,084.280
422 6001 REINF CONC SLAB SF 160,264.000 $15.000 $20.000 $21.900 $20.000 $25.390
422 6015 APPROACH SLAB CY 207.200 $550.000 $725.000 $995.000 $1,000.000 $957.440
425 6036 PRESTR CONC GIRDER (TX34) LF 8,013.000 $160.000 $165.000 $196.000 $213.000 $195.200
425 6039 PRESTR CONC GIRDER (TX54) LF 8,964.000 $180.000 $200.000 $192.000 $239.000 $234.350
432 6002 RIPRAP (CONC)(5 IN) CY 238.000 $550.000 $480.000 $680.000 $700.000 $893.380
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 35.000 $150.000 $215.000 $109.000 $200.000 $114.690
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 12.000 $250.000 $215.000 $200.000 $210.000 $182.960
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 517.000 $140.000 $175.000 $175.000 $210.000 $134.310
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 2,809.000 $175.000 $185.000 $175.000 $200.000 $117.040
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 27.000 $329.390 $600.000 $1,525.000 $840.000 $859.150
434 6026 ELASTOMERIC BEARING (E7) EA 6.000 $3,000.000 $6,000.000 $4,400.000 $3,550.000 $4,618.180
434 6035 ELASTOMERIC BEARING (F7) EA 6.000 $3,000.000 $6,000.000 $4,400.000 $3,550.000 $4,618.180
434 6043 SLIDING ELASTOMERIC BEARING (ES 6) EA 12.000 $2,500.000 $6,000.000 $3,500.000 $2,800.000 $3,674.030
442 6001 STR STEEL (PLATE GIRDER) LB 1,967,803.000 $2.200 $2.000 $2.330 $3.000 $2.310
450 6023 RAIL (TY SSTR) LF 5,794.000 $60.000 $55.000 $60.000 $60.000 $54.080
450 6054 RAIL (TY SSTR) (W/DRAIN SLOTS) LF 1,370.000 $90.000 $65.000 $60.000 $65.000 $61.250
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 272.000 $100.000 $230.000 $200.000 $200.000 $192.260
454 6019 SEALED EXPANSION JOINT (5 IN) (SEJ - M) LF 91.000 $100.000 $230.000 $175.000 $200.000 $192.130
454 6020 SEALED EXPANSION JOINT (4 IN) (SEJ - B) LF 276.000 $110.000 $150.000 $100.000 $200.000 $106.960
459 6009 GABIONS (3' X 3')(GALV) CY 150.000 $222.900 $400.000 $400.000 $350.000 $235.820
459 6013 GABION (1.5' X 3')(GALV) CY 50.000 $292.990 $400.000 $375.000 $350.000 $309.680
462 6002 CONC BOX CULV (3 FT X 3 FT) LF 42.000 $350.000 $340.000 $570.000 $400.000 $291.840
462 6046 CONC BOX CULV (3 FT X 3 FT)(EXTEND) LF 97.000 $550.000 $340.000 $540.000 $400.000 $301.220
464 6005 RC PIPE (CL III)(24 IN) LF 284.000 $100.000 $75.000 $80.000 $150.000 $103.430
464 6007 RC PIPE (CL III)(30 IN) LF 132.000 $150.000 $125.000 $125.000 $200.000 $107.960
465 6161 INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT) EA 2.000 $6,700.000 $8,000.000 $14,000.000 $11,000.000 $6,258.200
466 6007 HEADWALL (CH - FW - 0) (DIA= 30 IN) EA 2.000 $6,000.000 $10,000.000 $9,500.000 $14,000.000 $6,796.900
466 6151 WINGWALL (FW - 0) (HW=4 FT) EA 1.000 $7,500.000 $15,000.000 $12,400.000 $16,000.000 $12,445.070
467 6391 SET (TY II) (24 IN) (RCP) (4: 1) (P) EA 4.000 $850.000 $2,500.000 $1,350.000 $2,700.000 $1,562.010
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $900.000 $2,500.000 $1,540.000 $3,000.000 $2,304.020
467 6420 SET (TY II) (30 IN) (RCP) (4: 1) (P) EA 1.000 $2,000.000 $3,000.000 $1,800.000 $3,500.000 $1,621.010
496 6011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) EA 2.000 $187,500.000 $300,000.000 $450,000.000 $250,000.000 $295,144.630
496 6012 REMOV STR (BRIDGE 1000 FT OR GREATER) EA 1.000 $300,000.000 $225,000.000 $415,000.000 $1,000,000.000 $509,477.940
496 6016 REMOV STR (PIPE) EA 6.000 $500.000 $1,200.000 $990.000 $500.000 $503.420
500 6001 MOBILIZATION LS 1.000 $2,556,000.000 $3,000,000.000 $3,550,000.000 $1,500,000.000 $3,850,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 25.000 $3,500.000 $5,500.000 $25,000.000 $5,000.000 $673.790
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,680.000 $30.000 $38.000 $30.000 $38.000 $34.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,680.000 $8.000 $12.000 $10.000 $12.000 $8.000
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 776.000 $35.000 $44.000 $30.000 $44.000 $27.140
506 6024 CONSTRUCTION EXITS (REMOVE) SY 776.000 $8.000 $12.000 $10.000 $12.000 $7.130
506 6034 CONSTRUCTION PERIMETER FENCE LF 5,420.000 $5.000 $4.000 $4.000 $4.000 $5.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 36,884.000 $2.500 $3.250 $3.000 $3.250 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 36,884.000 $0.750 $0.400 $0.800 $0.400 $0.650
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 400.000 $5.270 $5.500 $6.000 $5.500 $6.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 400.000 $1.080 $1.000 $1.000 $1.000 $2.000
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 153.000 $10.000 $10.000 $92.000 $24.310 $16.240
512 6094 PTB (FUR & INST)(STEEL) LF 7,770.000 $25.000 $55.000 $60.000 $68.000 $59.570
512 6095 PTB (MOVE)(STEEL) LF 2,700.000 $25.000 $9.000 $10.000 $10.000 $14.580
512 6096 PTB (REMOVE)(STEEL) LF 7,770.000 $25.000 $9.000 $7.750 $3.000 $4.100
530 6004 DRIVEWAYS (CONC) SY 2,446.000 $80.000 $70.000 $90.000 $70.000 $71.610
530 6005 DRIVEWAYS (ACP) SY 4,965.000 $40.000 $46.000 $45.000 $70.000 $71.530
533 6001 RUMBLE STRIPS (SHOULDER) LF 24,416.000 $0.300 $0.250 $0.530 $0.150 $0.160
533 6002 RUMBLE STRIPS (CENTERLINE) LF 12,208.000 $0.200 $0.300 $0.530 $0.150 $0.160
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,462.500 $20.000 $27.000 $26.250 $24.300 $24.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 12.000 $2,000.000 $1,800.000 $1,880.000 $2,048.000 $1,650.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,507.000 $250.000 $3.000 $2.350 $2.500 $2.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 14.000 $2,600.000 $3,200.000 $3,175.000 $3,047.000 $2,850.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $280.000 $200.000 $260.000 $345.000 $250.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 10.000 $1,200.000 $2,500.000 $1,815.000 $5,000.000 $2,750.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 12.000 $900.000 $1,000.000 $1,515.000 $3,000.000 $1,200.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 12.000 $7,500.000 $10,000.000 $9,715.000 $10,000.000 $9,670.000
552 6003 WIRE FENCE (TY C) LF 583.000 $20.000 $10.000 $15.000 $25.000 $50.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 $750.000 $510.000 $773.000 $736.000 $800.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 28.000 $350.000 $375.000 $414.000 $394.000 $510.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 3.000 $450.000 $475.000 $513.000 $489.000 $600.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 2.000 $2,000.000 $1,800.000 $2,785.000 $2,650.000 $2,650.000
644 6076 REMOVE SM RD SN SUP&AM EA 31.000 $90.000 $60.000 $96.000 $92.000 $20.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 78.000 $20.000 $20.000 $25.000 $25.000 $19.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 6.000 $25.000 $25.000 $35.000 $30.000 $19.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $30.000 $35.000 $35.000 $35.000 $24.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 122,405.000 $0.250 $0.180 $0.190 $0.350 $0.180
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 111,001.000 $0.250 $0.180 $0.190 $0.350 $0.180
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 1,435.000 $4.000 $3.500 $3.700 $5.000 $3.500
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 36,323.000 $1.000 $0.750 $0.790 $1.500 $0.750
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 7,629.000 $1.100 $0.750 $0.790 $1.500 $0.750
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 12,442.000 $1.500 $1.700 $0.790 $0.250 $0.630
666 6224 PAVEMENT SEALER 4" LF 14,416.000 $0.500 $0.200 $0.210 $0.450 $0.200
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 28,696.000 $0.300 $0.500 $0.530 $0.450 $0.500
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 2,500.000 $0.300 $1.000 $1.050 $0.450 $1.000
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 23,698.000 $0.300 $0.500 $0.530 $0.450 $0.550
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 7,629.000 $0.500 $1.000 $1.050 $1.500 $1.000
666 6344 REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF 7,629.000 $0.500 $1.000 $1.050 $1.500 $1.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 12.000 $15.000 $20.000 $21.000 $18.000 $20.000
672 6009 REFL PAV MRKR TY II-A-A EA 652.000 $3.500 $3.500 $3.680 $5.500 $3.500
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 39,963.000 $0.400 $0.300 $0.320 $0.600 $0.300
678 6001 PAV SURF PREP FOR MRK (4") LF 67,652.000 $0.050 $0.050 $0.050 $0.200 $0.050
678 6008 PAV SURF PREP FOR MRK (24") LF 12.000 $0.750 $3.000 $3.150 $1.000 $3.000
752 6004 TREE TRIMMING / BRUSH REMOVAL(CHANNELS) AC 0.500 $10,000.000 $2,000.000 $175,000.000 $5,500.000 $2,000.000
3076 6035 D-GR HMA TY-D PG64-22 TON 185.000 $200.000 $380.000 $155.000 $369.500 $369.500
3076 6043 D-GR HMA TY-D PG70-22 (LEVEL-UP) TON 1,741.000 $150.000 $165.000 $155.000 $161.000 $161.000
3077 6021 SP MIXES SP-C PG70-22 TON 1,161.000 $150.000 $168.000 $150.000 $163.500 $163.500
3077 6022 SP MIXES SP-C SAC-A PG70-22 TON 7,837.000 $140.000 $149.000 $148.000 $145.000 $145.000
3077 6075 TACK COAT GAL 7,122.000 $5.000 $7.000 $5.000 $6.500 $4.500
4021 6001 TIP TESTING(DRILL SHAFT) EA 7.000 $5,000.000 $6,000.000 $6,500.000 $7,257.580 $7,008.100
5027 6001 TEMPORARY CONSTRUCTION MATTING SY 1,282.000 $350.000 $70.000 $130.000 $125.000 $50.000
5129 6001 INSTALL FTB LF 730.000 $75.000 $50.000 $50.000 $77.760 $40.720
5129 6002 REMOVE FTB LF 730.000 $15.000 $25.000 $17.000 $15.870 $3.570
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $10,000.000 $17,500.000 $15,000.000 $16,500.000
6185 6002 TMA (STATIONARY) DAY 645.000 $200.000 $175.000 $100.000 $72.000 $184.000
6185 6005 TMA (MOBILE OPERATION) DAY 38.000 $1,500.000 $175.000 $200.000 $500.000 $750.120
Totals: $28,200,985.93 $31,995,093.82 $37,786,983.94 $38,419,288.02 $38,861,113.64