PREPARING ROW
|
STA
|
547.000
|
$1,000.000
|
$2,000.000
|
$1,825.000
|
$1,300.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
105.000
|
$40.000
|
$40.000
|
$73.000
|
$43.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
411.000
|
$430.000
|
$450.000
|
$528.000
|
$479.360
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
8,190.000
|
$30.000
|
$15.000
|
$22.500
|
$24.000
|
|
|
BLADING
|
STA
|
550.000
|
$320.000
|
$200.000
|
$273.500
|
$268.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
49.000
|
$100.000
|
$200.000
|
$236.250
|
$214.790
|
|
|
BLOCK SODDING
|
SY
|
1,510.000
|
$6.500
|
$6.000
|
$6.600
|
$8.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
106,633.000
|
$0.160
|
$0.120
|
$0.110
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
106,633.000
|
$0.160
|
$0.110
|
$0.110
|
$0.180
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
213,264.000
|
$0.700
|
$0.550
|
$0.620
|
$0.950
|
|
|
VEGETATIVE WATERING
|
MG
|
8,562.000
|
$5.000
|
$1.000
|
$5.000
|
$10.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,281.000
|
$10.000
|
$1.000
|
$5.000
|
$1.000
|
|
|
CEM TRT (PLNT MX)(CL N)(TY A)(GR3)(12")
|
SY
|
27,259.000
|
$70.000
|
$76.000
|
$112.820
|
$102.560
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
12,182.000
|
$5.000
|
$6.000
|
$13.500
|
$12.270
|
|
|
ASPH (RC-250)
|
TON
|
32.000
|
$1,375.000
|
$1,900.000
|
$1,787.000
|
$1,624.460
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
272.000
|
$277.000
|
$250.000
|
$224.000
|
$203.570
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
197.000
|
$376.000
|
$650.000
|
$223.000
|
$202.380
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
632.000
|
$900.000
|
$850.000
|
$1,335.000
|
$1,214.090
|
|
|
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
|
CY
|
1,856.000
|
$200.000
|
$165.000
|
$205.750
|
$187.040
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
3,000.000
|
$155.000
|
$170.000
|
$151.130
|
$178.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,403.000
|
$12.000
|
$10.000
|
$18.640
|
$22.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,946.000
|
$10.000
|
$11.000
|
$15.050
|
$13.000
|
|
|
CEM STABIL BKFL
|
CY
|
2.000
|
$1,500.000
|
$700.000
|
$575.000
|
$1,100.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
5.000
|
$1,000.000
|
$560.000
|
$575.000
|
$330.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
264.000
|
$70.000
|
$65.000
|
$73.000
|
$66.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
12.000
|
$250.000
|
$360.000
|
$300.000
|
$275.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
18.000
|
$890.000
|
$950.000
|
$850.000
|
$830.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$960.000
|
$1,000.000
|
$900.000
|
$895.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,408.000
|
$90.000
|
$85.000
|
$72.000
|
$64.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
1.000
|
$11,000.000
|
$17,000.000
|
$7,800.000
|
$15,500.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$15,000.000
|
$18,000.000
|
$8,900.000
|
$18,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$12,500.000
|
$19,000.000
|
$10,500.000
|
$26,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
101.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$940.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$1,700.000
|
$3,200.000
|
$2,300.000
|
$2,100.000
|
|
|
REMOV STR (PIPE)
|
EA
|
50.000
|
$700.000
|
$525.000
|
$1,325.000
|
$470.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,230,000.000
|
$1,200,000.000
|
$950,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$9,000.000
|
$10,000.000
|
$3,500.000
|
$7,300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,584.000
|
$40.000
|
$50.000
|
$49.930
|
$47.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,584.000
|
$12.000
|
$16.000
|
$16.200
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
250.000
|
$10.000
|
$5.000
|
$57.570
|
$41.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
250.000
|
$5.000
|
$3.000
|
$8.260
|
$11.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
180.000
|
$5.000
|
$11.000
|
$10.720
|
$8.320
|
|
|
DRIVEWAYS (CONC)
|
SY
|
159.000
|
$170.000
|
$190.000
|
$204.000
|
$175.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,738.000
|
$75.000
|
$75.000
|
$45.970
|
$62.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
1,432.000
|
$93.000
|
$140.000
|
$66.250
|
$70.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
130,210.000
|
$0.170
|
$0.170
|
$0.260
|
$0.230
|
|
|
MTL BM GD FEN (REMOVE & REINSTALL)
|
LF
|
50.000
|
$80.000
|
$100.000
|
$100.000
|
$33.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$700.000
|
$600.000
|
$495.000
|
$660.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
49.000
|
$224.000
|
$210.000
|
$127.000
|
$275.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
7.000
|
$300.000
|
$250.000
|
$155.000
|
$315.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
18.000
|
$900.000
|
$920.000
|
$962.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,250.000
|
$1,250.000
|
$1,050.000
|
$1,730.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
67.000
|
$450.000
|
$350.000
|
$470.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
6.000
|
$750.000
|
$480.000
|
$550.000
|
$665.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
92.000
|
$100.000
|
$70.000
|
$81.000
|
$140.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
24.000
|
$110.000
|
$110.000
|
$87.000
|
$165.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
192,027.000
|
$0.500
|
$0.360
|
$0.390
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
192,027.000
|
$0.500
|
$0.360
|
$0.390
|
$0.330
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,571.000
|
$1.000
|
$0.850
|
$1.500
|
$1.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
24,692.000
|
$1.000
|
$0.850
|
$1.500
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
820.000
|
$1.450
|
$1.200
|
$1.210
|
$1.100
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
120.000
|
$0.300
|
$0.250
|
$0.240
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
109,918.000
|
$0.530
|
$0.210
|
$0.220
|
$0.280
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
122.000
|
$0.630
|
$0.400
|
$0.330
|
$1.100
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
5,710.000
|
$0.400
|
$0.230
|
$0.240
|
$0.330
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
82,336.000
|
$0.700
|
$0.230
|
$0.220
|
$0.280
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
90.000
|
$4.000
|
$0.650
|
$0.640
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,310.000
|
$0.720
|
$0.650
|
$0.660
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
26,134.000
|
$1.500
|
$0.650
|
$0.620
|
$0.890
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
9,400.000
|
$1.000
|
$0.650
|
$0.680
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
27,154.000
|
$1.050
|
$0.630
|
$0.620
|
$0.890
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
229,698.000
|
$1.050
|
$0.900
|
$0.870
|
$0.940
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
137,625.000
|
$1.050
|
$0.900
|
$0.880
|
$0.940
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
39.000
|
$24.000
|
$16.000
|
$15.950
|
$16.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
8.000
|
$16.000
|
$5.600
|
$5.550
|
$7.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,744.000
|
$5.000
|
$5.600
|
$5.550
|
$5.550
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
29,140.000
|
$164.000
|
$175.000
|
$163.870
|
$174.500
|
|
|
BONDING COURSE
|
GAL
|
9,534.000
|
$5.250
|
$5.500
|
$5.250
|
$7.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$15,000.000
|
$20,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
440.000
|
$306.000
|
$140.000
|
$100.000
|
$180.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
55.000
|
$385.000
|
$50.000
|
$25.000
|
$55.000
|
|
Totals: |
$13,754,375.210
|
$14,327,451.660
|
$14,685,834.340
|
$14,929,096.300
|