|
|
REMOVING CONC (RIPRAP)
|
SY
|
85.000
|
$10.000
|
$33.000
|
$18.460
|
$13.500
|
$6.000
|
$82.550
|
$55.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
580.000
|
$6.500
|
$30.000
|
$14.770
|
$17.500
|
$7.000
|
$55.000
|
$17.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
801.910
|
$30.000
|
$19.000
|
$9.410
|
$19.000
|
$7.000
|
$40.190
|
$14.350
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
3,003.000
|
$30.000
|
$7.000
|
$19.270
|
$26.500
|
$10.000
|
$20.400
|
$15.200
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
103,662.930
|
$6.500
|
$2.200
|
$2.820
|
$4.450
|
$11.000
|
$2.000
|
$14.800
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,040.000
|
$5.000
|
$15.000
|
$13.770
|
$50.500
|
$8.000
|
$274.460
|
$21.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,360.090
|
$250.000
|
$130.000
|
$114.140
|
$210.000
|
$100.000
|
$99.320
|
$137.500
|
|
|
BLADING
|
STA
|
1,360.090
|
$100.000
|
$130.000
|
$101.820
|
$115.000
|
$80.000
|
$30.000
|
$220.000
|
|
|
REWORK BS MTL (TY B) (6") (DENS CONT)
|
SY
|
4,350.000
|
$8.000
|
$7.000
|
$5.890
|
$7.200
|
$3.750
|
$8.210
|
$6.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,316.000
|
$5.000
|
$4.000
|
$3.890
|
$3.800
|
$2.750
|
$5.000
|
$4.550
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
83,052.090
|
$3.000
|
$3.000
|
$3.330
|
$3.100
|
$2.750
|
$3.340
|
$4.150
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
72,194.500
|
$3.000
|
$2.500
|
$3.440
|
$3.250
|
$3.250
|
$3.130
|
$4.350
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
26,106.540
|
$90.000
|
$107.000
|
$86.310
|
$94.000
|
$80.000
|
$115.000
|
$120.000
|
|
|
D-GR HMA TY-C SAC-B PG70-28
|
TON
|
46,264.430
|
$80.000
|
$107.000
|
$98.060
|
$94.000
|
$94.000
|
$115.000
|
$126.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
73,665.460
|
$110.000
|
$117.000
|
$135.190
|
$130.000
|
$135.000
|
$120.000
|
$143.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
32,000.000
|
$25.000
|
$34.000
|
$33.640
|
$46.000
|
$47.000
|
$48.940
|
$48.000
|
|
|
CEM STABIL BKFL
|
CY
|
184.940
|
$200.000
|
$240.000
|
$92.730
|
$205.000
|
$140.000
|
$234.140
|
$227.220
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
23.890
|
$400.000
|
$600.000
|
$462.410
|
$520.000
|
$400.000
|
$652.880
|
$568.050
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
21.000
|
$80.000
|
$60.000
|
$88.640
|
$52.000
|
$50.000
|
$203.650
|
$56.800
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
531.000
|
$90.000
|
$72.000
|
$68.680
|
$62.000
|
$75.000
|
$110.660
|
$68.170
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
120.000
|
$110.000
|
$85.000
|
$124.720
|
$72.500
|
$85.000
|
$136.700
|
$79.530
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
117.000
|
$120.000
|
$96.000
|
$106.380
|
$83.000
|
$100.000
|
$138.450
|
$90.890
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
48.000
|
$110.000
|
$110.000
|
$141.420
|
$93.500
|
$120.000
|
$142.350
|
$102.250
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
80.000
|
$100.000
|
$150.000
|
$121.020
|
$130.000
|
$80.000
|
$155.830
|
$142.010
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
48.000
|
$110.000
|
$205.000
|
$177.190
|
$175.000
|
$110.000
|
$280.460
|
$193.140
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$800.000
|
$1,200.000
|
$914.890
|
$1,000.000
|
$1,500.000
|
$1,772.220
|
$1,136.100
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$900.000
|
$1,300.000
|
$1,061.190
|
$1,100.000
|
$2,000.000
|
$1,876.020
|
$1,249.710
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,450.000
|
$953.090
|
$1,200.000
|
$2,000.000
|
$2,405.860
|
$1,363.320
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
38.000
|
$1,200.000
|
$1,500.000
|
$1,779.370
|
$1,300.000
|
$2,200.000
|
$3,038.030
|
$1,420.120
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$1,300.000
|
$1,560.000
|
$1,771.730
|
$1,300.000
|
$2,500.000
|
$2,531.440
|
$1,476.930
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,350.000
|
$2,400.000
|
$1,024.150
|
$2,100.000
|
$3,200.000
|
$2,867.080
|
$2,272.200
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (C)
|
EA
|
12.000
|
$1,800.000
|
$2,600.000
|
$2,179.880
|
$2,300.000
|
$3,200.000
|
$3,390.600
|
$2,499.420
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,800.000
|
$3,000.000
|
$2,051.380
|
$2,600.000
|
$3,000.000
|
$2,697.860
|
$2,840.250
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$3,000.000
|
$1,528.140
|
$2,600.000
|
$3,000.000
|
$3,447.320
|
$2,840.250
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (C)
|
EA
|
3.000
|
$3,300.000
|
$3,800.000
|
$2,564.770
|
$3,300.000
|
$3,500.000
|
$5,622.590
|
$3,635.520
|
|
|
SET (TY II) (DES 4) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,600.000
|
$4,200.000
|
$2,143.820
|
$3,600.000
|
$3,500.000
|
$3,208.440
|
$3,976.350
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
26.000
|
$1,800.000
|
$2,100.000
|
$1,692.960
|
$2,600.000
|
$2,000.000
|
$2,593.980
|
$1,605.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,757,000.000
|
$2,000,000.000
|
$1,527,641.790
|
$1,285,000.000
|
$1,500,000.000
|
$2,459,602.000
|
$2,165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$8,000.000
|
$14,000.000
|
$9,635.110
|
$22,000.000
|
$12,000.000
|
$30,000.000
|
$10,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
624.000
|
$30.000
|
$20.000
|
$20.750
|
$38.500
|
$25.000
|
$40.210
|
$39.890
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
624.000
|
$10.000
|
$2.000
|
$8.160
|
$11.500
|
$4.000
|
$11.870
|
$11.770
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,850.000
|
$3.000
|
$3.000
|
$2.510
|
$3.100
|
$3.500
|
$3.200
|
$3.180
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,850.000
|
$1.000
|
$1.000
|
$1.050
|
$1.050
|
$1.200
|
$1.080
|
$1.070
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
12,880.000
|
$3.000
|
$4.000
|
$3.190
|
$5.000
|
$5.000
|
$5.180
|
$5.140
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
12,880.000
|
$1.000
|
$1.000
|
$0.940
|
$1.150
|
$1.250
|
$1.200
|
$1.190
|
|
|
INTERSECTIONS (ACP)
|
SY
|
4,333.000
|
$35.000
|
$33.000
|
$31.880
|
$59.500
|
$30.000
|
$45.610
|
$85.000
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
2,828.000
|
$20.000
|
$20.000
|
$18.230
|
$36.000
|
$12.000
|
$25.210
|
$85.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,139.000
|
$80.000
|
$110.000
|
$79.130
|
$93.500
|
$80.000
|
$76.420
|
$102.250
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
777.000
|
$20.000
|
$24.000
|
$44.460
|
$45.000
|
$10.000
|
$22.210
|
$20.000
|
|
|
TURNOUTS (ACP)
|
SY
|
1,156.900
|
$35.000
|
$35.000
|
$63.650
|
$145.000
|
$50.000
|
$39.520
|
$85.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
271,270.000
|
$0.140
|
$0.130
|
$0.100
|
$0.090
|
$0.100
|
$0.090
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
135,610.000
|
$0.200
|
$0.160
|
$0.120
|
$0.160
|
$0.100
|
$0.090
|
$0.100
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
175.000
|
$5.000
|
$10.000
|
$13.630
|
$3.100
|
$7.000
|
$2.830
|
$10.700
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$500.000
|
$550.000
|
$596.150
|
$310.000
|
$350.000
|
$348.150
|
$1,070.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
56.000
|
$300.000
|
$230.000
|
$298.360
|
$220.000
|
$275.000
|
$226.520
|
$187.250
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
12.000
|
$320.000
|
$250.000
|
$319.330
|
$240.000
|
$275.000
|
$248.100
|
$240.750
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$360.000
|
$450.000
|
$492.160
|
$410.000
|
$400.000
|
$426.080
|
$374.500
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
250.000
|
$3.500
|
$4.000
|
$3.140
|
$3.100
|
$3.750
|
$3.940
|
$3.560
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
160.000
|
$1.500
|
$4.300
|
$3.660
|
$3.650
|
$4.250
|
$4.210
|
$4.150
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
54.630
|
$20.000
|
$40.000
|
$29.240
|
$36.500
|
$20.000
|
$21.250
|
$26.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
116.000
|
$600.000
|
$500.000
|
$476.320
|
$470.000
|
$525.000
|
$490.800
|
$856.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
49.000
|
$740.000
|
$570.000
|
$549.600
|
$545.000
|
$600.000
|
$566.310
|
$936.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
34.000
|
$610.000
|
$570.000
|
$539.130
|
$535.000
|
$600.000
|
$555.520
|
$936.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$800.000
|
$640.000
|
$607.180
|
$600.000
|
$675.000
|
$625.630
|
$1,016.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$900.000
|
$1,000.000
|
$947.400
|
$940.000
|
$1,000.000
|
$976.210
|
$1,337.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$700.000
|
$730.000
|
$690.930
|
$685.000
|
$775.000
|
$711.930
|
$1,070.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$850.000
|
$850.000
|
$806.080
|
$800.000
|
$900.000
|
$830.580
|
$1,230.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
17.000
|
$950.000
|
$720.000
|
$680.460
|
$675.000
|
$700.000
|
$701.140
|
$1,284.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$300.000
|
$420.000
|
$392.570
|
$390.000
|
$450.000
|
$404.510
|
$802.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
164.000
|
$100.000
|
$80.000
|
$73.280
|
$72.500
|
$80.000
|
$75.510
|
$123.050
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
52.000
|
$60.000
|
$90.000
|
$83.750
|
$83.000
|
$90.000
|
$86.290
|
$145.520
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
24,216.000
|
$0.200
|
$0.140
|
$0.140
|
$0.080
|
$0.090
|
$0.090
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
813,138.000
|
$0.200
|
$0.140
|
$0.140
|
$0.080
|
$0.090
|
$0.090
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
991,136.000
|
$0.200
|
$0.140
|
$0.140
|
$0.080
|
$0.090
|
$0.090
|
$0.140
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
18,977.000
|
$0.500
|
$0.600
|
$1.000
|
$1.050
|
$1.000
|
$1.120
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
10,184.000
|
$0.500
|
$0.600
|
$0.990
|
$1.050
|
$1.000
|
$1.120
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
3,733.000
|
$1.000
|
$0.390
|
$0.370
|
$0.360
|
$0.500
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
269,190.000
|
$0.250
|
$0.390
|
$0.370
|
$0.360
|
$0.500
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
18,836.000
|
$0.600
|
$0.580
|
$0.550
|
$0.570
|
$0.650
|
$0.590
|
$0.570
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
12,783.000
|
$0.500
|
$0.390
|
$0.370
|
$0.360
|
$0.450
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
200,234.000
|
$0.250
|
$0.390
|
$0.370
|
$0.360
|
$0.450
|
$0.380
|
$0.370
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
314.000
|
$15.000
|
$18.700
|
$17.800
|
$18.500
|
$20.000
|
$19.040
|
$18.190
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$200.000
|
$825.000
|
$785.140
|
$190.000
|
$200.000
|
$196.590
|
$802.500
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$300.000
|
$1,171.500
|
$1,114.910
|
$545.000
|
$600.000
|
$566.680
|
$1,139.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,009.000
|
$3.000
|
$3.300
|
$3.140
|
$2.650
|
$3.000
|
$2.750
|
$3.210
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,936.000
|
$3.000
|
$3.300
|
$3.140
|
$2.650
|
$3.000
|
$2.750
|
$3.210
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
744,307.000
|
$0.600
|
$0.400
|
$0.540
|
$0.450
|
$0.350
|
$0.320
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
314.000
|
$3.000
|
$4.000
|
$3.250
|
$2.050
|
$16.000
|
$14.940
|
$24.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$120.000
|
$750.000
|
$816.640
|
$310.000
|
$280.000
|
$253.490
|
$5,000.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
314.000
|
$1.000
|
$3.300
|
$3.140
|
$6.150
|
$7.000
|
$6.420
|
$3.210
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$10.000
|
$27.500
|
$26.170
|
$38.000
|
$45.000
|
$39.640
|
$26.750
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$30.000
|
$82.500
|
$78.520
|
$115.000
|
$130.000
|
$119.730
|
$80.250
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$300.000
|
$340.000
|
$287.890
|
$285.000
|
$350.000
|
$776.650
|
$326.340
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$300.000
|
$340.000
|
$287.890
|
$285.000
|
$350.000
|
$776.650
|
$326.340
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$6,000.000
|
$7,300.000
|
$6,281.160
|
$7,000.000
|
$7,500.000
|
$8,936.860
|
$7,120.110
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$3,000.000
|
$4,200.000
|
$3,583.050
|
$15,000.000
|
$1,800.000
|
$1,561.370
|
$30,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$2,000.000
|
$3,700.000
|
$2,536.130
|
$5,200.000
|
$1,800.000
|
$1,071.420
|
$15,000.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
11.000
|
$1,800.000
|
$1,200.000
|
$1,179.730
|
$1,300.000
|
$1,500.000
|
$1,160.660
|
$1,131.140
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
124,300.000
|
$5.000
|
$4.000
|
$9.340
|
$9.650
|
$5.000
|
$8.950
|
$5.500
|
|
|
NO. OF WORKING DAYS
|
$/D
|
4,000.000
|
$259.000
|
$240.000
|
$262.000
|
$259.000
|
$350.000
|
$226.000
|
$325.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
507,396.890
|
$4.000
|
$5.500
|
$4.950
|
$4.750
|
$6.000
|
$5.360
|
$5.350
|
|
|
ASPH FOR REINF FAB (AC-20-5TR)
|
GAL
|
101,479.370
|
$2.500
|
$3.600
|
$5.070
|
$4.050
|
$2.500
|
$4.310
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$6,500.000
|
$9,421.730
|
$10,500.000
|
$13,000.000
|
$22,853.970
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$8,000.000
|
$10,000.000
|
$36,640.080
|
$26,000.000
|
$13,000.000
|
$18,972.220
|
$35,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$400.000
|
$1,095.790
|
$780.000
|
$75.000
|
$435.770
|
$825.000
|
|
Totals: |
$24,906,985.900
|
$27,611,673.873
|
$28,312,935.351
|
$28,659,818.904
|
$28,892,374.958
|
$30,552,821.473
|
$34,733,291.141
|