Job Info for 6438-11-001

County: HILL Highway: SH0022 Date: 10/05/2023 (1 year ago) Engineer's Estimate: $1,929,546 Control Number: 6438-11-001
Project: BPM - 643811001 District: WACO Time: 108 W Type: BRIDGE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,929,546.30
SCOTT TUCKER CONSTRUCTION COMPANY, LLC   $1,654,027.05 1
-14.28% | -$275,519.25
GARRET SHIELDS INFRASTRUCTURE   $1,677,980.00 2
-13.04% | -$251,566.30
1.45% | $23,952.95
STRUCTURAL INTEGRITY GROUP LLC   $1,940,139.40 3
0.55% | $10,593.10
17.3% | $286,112.35
15.62% | $262,159.40
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $2,274,152.50 4
17.86% | $344,606.20
37.49% | $620,125.45
17.22% | $334,013.10
SCR CIVIL CONSTRUCTION, LLC   $2,389,320.40 5
23.83% | $459,774.10
44.45% | $735,293.35
5.06% | $115,167.90
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 9.38% $155,147.74
TEXAS HIGHWAY MAINTENANCE, LLC 1.84% $30,434.10
DUSTROL, INC. 1.16% $19,186.71
Total: 12.38% $204,768.55

Bid Items

Items: 40, 0 filtered
HILL SH0022  |  WACO  |  6438-11-001  |  10/05/2023  |  $1,929,546  |  BPM - 643811001  |  BRIDGE REPAIR  |  108 W
Item code Description Unit Quantity Engineer's Estimate SCOTT TUCKER CONSTRUCTION COMPANY, LLC GARRET SHIELDS INFRASTRUCTURE STRUCTURAL INTEGRITY GROUP LLC BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC SCR CIVIL CONSTRUCTION, LLC
104 6009 REMOVING CONC (RIPRAP) SY 83.000 $40.000 $108.700 $50.000 $135.000 $100.000 $184.000
104 6021 REMOVING CONC (CURB) LF 9.000 $15.000 $74.900 $50.000 $25.000 $50.000 $50.000
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 819.000 $40.000 $94.300 $50.000 $46.000 $75.000 $50.000
158 6002 SPEC EXCAV WORK (BACKHOE) HR 20.000 $200.000 $128.400 $110.000 $125.000 $150.000 $210.000
351 6012 FLEXIBLE PAVEMENT STRUCTURE REPAIR(2") SY 196.000 $100.000 $309.100 $230.000 $200.000 $350.000 $340.000
354 6088 PLANE ASPH CONC PAV (0" TO 5") SY 2,469.000 $6.000 $8.800 $12.000 $14.000 $20.000 $28.000
356 6021 PAV JT UNDERSEAL (24") LF 1,270.000 $45.000 $17.400 $30.000 $33.000 $25.000 $70.000
401 6001 FLOWABLE BACKFILL CY 397.630 $400.000 $302.200 $400.000 $330.000 $500.000 $380.000
420 6070 CL C CONC (PILE ENCASEMENT) CY 12.300 $3,500.000 $4,915.400 $2,000.000 $2,125.000 $2,000.000 $2,410.000
420 6074 CL C CONC (MISC) CY 16.600 $1,100.000 $3,582.000 $600.000 $2,900.000 $1,000.000 $3,300.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 829.700 $250.000 $173.300 $200.000 $190.000 $275.000 $260.000
429 6009 CONC STR REPAIR (STANDARD) SF 732.000 $250.000 $83.300 $150.000 $165.000 $375.000 $160.000
432 6002 RIPRAP (CONC)(5 IN) CY 27.000 $675.000 $1,457.700 $500.000 $1,775.000 $750.000 $1,550.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 696.000 $200.000 $179.100 $200.000 $250.000 $250.000 $265.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 881.000 $190.000 $159.400 $250.000 $250.000 $250.000 $265.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 1,120.000 $50.000 $41.300 $45.000 $44.000 $65.000 $65.000
438 6004 CLEANING AND SEALING EXIST JOINTS(CL7) LF 220.000 $50.000 $56.400 $65.000 $66.000 $55.000 $55.000
446 6051 SPOT CLEAN & PAINT EXT STR(SPL PRT SYS) EA 3.000 $15,000.000 $13,040.200 $10,000.000 $10,500.000 $35,000.000 $15,000.000
459 6001 GABIONS (GALV) CY 200.000 $260.000 $387.700 $300.000 $270.000 $400.000 $350.000
495 6001 RAISING EXIST STRUCT LS 1.000 $50,000.000 $37,196.600 $50,000.000 $72,000.000 $50,000.000 $210,000.000
500 6001 MOBILIZATION LS 1.000 $175,413.300 $165,401.400 $180,000.000 $315,000.000 $200,000.000 $238,800.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $5,000.000 $7,690.000 $1,000.000 $10,000.000 $5,000.000 $13,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 200.000 $5.000 $3.400 $4.000 $2.000 $5.000 $12.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 200.000 $1.500 $1.600 $1.000 $2.000 $3.000 $4.000
529 6002 CONC CURB (TY II) LF 26.000 $40.000 $31.500 $50.000 $30.000 $100.000 $200.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 35.000 $2.000 $8.500 $20.000 $15.000 $1.000 $10.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 1,112.000 $1.000 $15.000 $20.000 $17.250 $10.000 $8.750
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 72.000 $1.000 $20.500 $25.000 $23.000 $10.000 $8.750
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 540.000 $1.000 $15.100 $20.000 $17.250 $10.000 $8.750
672 6009 REFL PAV MRKR TY II-A-A EA 14.000 $7.000 $57.500 $10.000 $63.000 $55.000 $55.000
752 6015 TREE AND BRUSH REMOVAL AC 0.200 $11,000.000 $55,840.700 $10,000.000 $12,500.000 $20,000.000 $75,000.000
780 6010 CNC CRACK REPAIR (DISCRETE)(SURF SEAL) LF 200.000 $90.000 $28.400 $100.000 $40.000 $120.000 $60.000
784 6001 REP STL BRIDGE MEMBERS LS 3.000 $70,000.000 $3,649.200 $10,000.000 $6,250.000 $5,000.000 $4,000.000
3076 6069 D-GR HMA TY-C SAC-B PG64-22 (EXEMPT) TON 298.000 $300.000 $308.200 $300.000 $320.000 $400.000 $365.000
3085 6001 UNDERSEAL COURSE GAL 486.000 $5.000 $27.900 $20.000 $16.000 $20.000 $17.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 100.000 $120.000 $68.500 $50.000 $50.000 $150.000 $120.000
6185 6002 TMA (STATIONARY) DAY 200.000 $250.000 $270.900 $300.000 $50.000 $300.000 $300.000
7000 6001 REML & DISPL DRIFTWOOD & DEBRIS CY 136.000 $140.000 $167.500 $120.000 $140.000 $300.000 $120.000
7306 6002 BRIDGE SUBSTRUCTURE CLEANING (BENT) EA 3.000 $150.000 $1,673.200 $3,000.000 $2,800.000 $3,500.000 $6,000.000
7329 6002 MAINTENANCE SPEED LIMIT SIGNING DAY 100.000 $150.000 $47.500 $10.000 $25.000 $37.000 $100.000
Totals: $1,929,546.30 $1,654,027.06 $1,677,980.00 $1,940,139.40 $2,274,152.50 $2,389,320.40