Job Info for 6399-56-001

County: HILL Highway: FM0308 Date: 05/04/2022 (2 years ago) Engineer's Estimate: $836,030 Control Number: 6399-56-001
Project: RMC - 639956001 District: WACO Time: 365 CALENDAR DAYS Type: BASE FAILURE PAVEMENT REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $836,030.16
KNIFE RIVER CORPORATION - SOUTH   $889,845.10 1
6.44% | $53,814.94
BIG CREEK CONSTRUCTION, LTD.   $917,511.60 2
9.75% | $81,481.44
3.11% | $27,666.50
TEXAS MATERIALS GROUP, INC.   $1,060,748.89 3
26.88% | $224,718.73
19.21% | $170,903.79
15.61% | $143,237.29
PEACHTREE CONSTRUCTION, LTD.   $1,334,330.45 4
59.6% | $498,300.29
49.95% | $444,485.35
25.79% | $273,581.56

Bid Items

Items: 14, 0 filtered
HILL FM0308  |  WACO  |  6399-56-001  |  05/04/2022  |  $836,030  |  RMC - 639956001  |  BASE FAILURE PAVMT REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BIG CREEK CONSTRUCTION, LTD. TEXAS MATERIALS GROUP, INC. PEACHTREE CONSTRUCTION, LTD.
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 14,346.000 $50.000 $59.750 $60.000 $72.400 $88.000
500 6033 MOBILIZATION (CALLOUT) EA 3.000 $20,642.720 $225.000 $250.000 $0.010 $5,000.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 840.000 $1.000 $1.000 $1.500 $1.000 $2.850
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 840.000 $1.000 $1.000 $1.500 $1.000 $2.850
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 100.000 $7.000 $11.000 $15.000 $10.000 $11.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 2,100.000 $1.000 $0.900 $0.850 $0.780 $2.100
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 8,400.000 $1.000 $0.800 $0.800 $0.700 $1.400
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 2,102.000 $1.000 $0.800 $0.800 $0.730 $2.100
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 8,400.000 $1.000 $0.800 $0.800 $0.710 $1.400
672 6007 REFL PAV MRKR TY I-C EA 200.000 $5.000 $4.750 $5.000 $4.250 $7.050
672 6009 REFL PAV MRKR TY II-A-A EA 105.000 $4.000 $11.000 $15.000 $10.000 $7.050
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 100.000 $80.000 $5.000 $100.000 $0.010 $65.000
6185 6002 TMA (STATIONARY) DAY 100.000 $160.000 $5.000 $175.000 $0.010 $75.000
6185 6003 TMA (MOBILE OPERATION) HR 100.000 $80.000 $91.000 $50.000 $25.000 $25.000
Totals: $836,030.16 $889,845.10 $917,511.60 $1,060,748.89 $1,334,330.45