HILL FM 933 (1190-02-018)

Items: 62

County: HILL
Length: N/A
Highway: FM 933
District: WACO
Control Number: 1190-02-018
DBE Goal: N/A
Project: F 2021(910)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $5,397,005.78
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$5,397,005.78
$4,587,556.71
Over/Under Est: -15% -$809,449.07
Over/Under Est: -3% -$162,044.37
Amt Left: 14.11% $647,404.70
Over/Under Est: -2.33% -$125,915.64
Amt Left: 14.9% $683,533.43
Delta: -0.69% -$36,128.73

Bid Items & Bid Tabulations

62 Total 0 of 62
HILL  |  FM 933  |  WACO  |  1190-02-018  |  07/02/2021  |  $5,397,005.78  |  F 2021(910)  |  SURF/ROADWAY RESTOR  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
EXCAVATION (ROADWAY)
CY 69.000 $14.000 $20.000 $26.550 $21.550
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 787.000 $17.000 $20.000 $31.500 $24.600
BACKFILL (TY A)
STA 258.000 $150.000 $200.000 $112.450 $132.550
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 112,201.000 $0.150 $0.130 $0.120 $0.130
DRILL SEEDING (TEMP) (WARM)
SY 56,101.000 $0.100 $0.080 $0.080 $0.090
DRILL SEEDING (TEMP) (COOL)
SY 56,101.000 $0.100 $0.080 $0.070 $0.080
VEGETATIVE WATERING
MG 1,823.000 $15.000 $5.000 $30.000 $10.000
FOG SEAL (SS-1)
GAL 15,028.000 $4.000 $3.000 $3.100 $3.850
ASPH (CRS-2)
GAL 67,815.000 $3.000 $3.000 $2.600 $3.000
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 1,118.000 $120.000 $100.000 $120.000 $163.000
STONE-MTRX-ASPH SMA-C SAC-B PG76-22
TON 20,245.000 $90.000 $85.000 $113.150 $102.000
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 4,294.000 $3.000 $2.600 $1.850 $4.350
CUT & RESTORING PAV
SY 111.000 $85.000 $150.000 $145.000 $163.050
TEMPORARY SPL SHORING
SF 135.000 $30.000 $75.000 $65.000 $81.550
RC PIPE (CL III)(18 IN)
LF 554.000 $55.000 $60.000 $50.000 $58.700
RC PIPE (CL III)(24 IN)
LF 312.000 $90.000 $100.000 $70.000 $104.350
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 33.000 $965.000 $900.000 $1,250.000 $978.300
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 6.000 $1,450.000 $1,200.000 $1,200.000 $1,087.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 11.000 $1,275.000 $1,200.000 $1,200.000 $1,087.000
SET (REMOV & REINSTALL)
EA 1.000 $1,150.000 $500.000 $1,000.000 $543.500
REMOV STR (PIPE)
LF 695.000 $15.000 $30.000 $9.000 $32.600
MOBILIZATION
LS 1.000 $490,636.890 $450,000.000 $255,150.000 $261,650.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,500.000 $5,000.000 $24,985.000 $3,765.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,955.000 $32.000 $12.000 $26.500 $24.000
ROCK FILTER DAMS (REMOVE)
LF 3,955.000 $9.000 $1.000 $8.000 $6.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,094.000 $3.000 $2.500 $2.200 $4.270
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,094.000 $1.000 $0.500 $0.600 $0.820
INTERSECTIONS (ACP)
SY 1,814.000 $26.000 $30.000 $48.250 $29.500
DRIVEWAYS (ACP)
SY 7,605.000 $30.000 $17.000 $24.250 $25.400
RUMBLE STRIPS (SHOULDER)
LF 64,442.000 $0.150 $0.150 $0.080 $0.080
RUMBLE STRIPS (CENTERLINE)
LF 30,157.000 $0.300 $0.150 $0.080 $0.080
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 2.000 $450.000 $500.000 $500.000 $295.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 48.000 $200.000 $200.000 $200.000 $207.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $300.000 $250.000 $225.000 $230.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 35.000 $460.000 $500.000 $500.000 $489.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $635.000 $600.000 $600.000 $543.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $665.000 $700.000 $700.000 $706.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $690.000 $800.000 $800.000 $761.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $760.000 $1,250.000 $1,250.000 $1,250.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,225.000 $1,300.000 $1,300.000 $1,305.000
REMOVE SM RD SN SUP&AM
EA 91.000 $125.000 $100.000 $100.000 $32.600
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 46.000 $75.000 $100.000 $25.000 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 63,076.000 $0.300 $0.160 $0.100 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 63,076.000 $0.300 $0.160 $0.240 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,156.000 $1.000 $1.000 $0.900 $0.920
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 749.000 $0.800 $1.000 $0.700 $0.760
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 261.000 $850.000 $6.000 $8.000 $8.700
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 165.000 $420.000 $6.000 $5.000 $5.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 64,442.000 $0.320 $0.330 $0.310 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,320.000 $0.250 $0.330 $0.330 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,683.000 $0.300 $0.330 $0.320 $0.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $240.000 $200.000 $240.000 $261.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $325.000 $300.000 $280.000 $304.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 26.000 $41.000 $60.000 $40.000 $43.500
REFL PAV MRKR TY I-C
EA 36.000 $3.250 $4.000 $6.000 $6.500
REFL PAV MRKR TY II-A-A
EA 737.000 $3.000 $4.000 $3.650 $4.000
CEMENT
TON 695.000 $155.000 $200.000 $150.000 $199.000
ASPHALT BINDER (PG 64-22)
TON 1,634.000 $440.000 $500.000 $470.000 $557.000
FOAMED ASPHALT TREAT (10")(DC)
SY 145,100.000 $4.000 $2.400 $2.750 $4.030
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,100.000 $5,500.000 $2,165.000 $550.000
TMA (STATIONARY)
DAY 140.000 $150.000 $160.000 $204.000 $1.000
TMA (MOBILE OPERATION)
HR 416.000 $55.000 $25.000 $25.000 $70.450
Totals: $5,397,005.780 $4,587,556.710 $5,234,961.410 $5,271,090.140