HILL CR (0909-37-065)

Items: 36

County: HILL
Length: N/A
Highway: CR
District: WACO
Control Number: 0909-37-065
DBE Goal: N/A
Project: BR 1802(254)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $461,541.17
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$461,541.17
$558,558.00
Over/Under Est: 21.02% $97,016.83
Over/Under Est: 33.88% $156,365.33
Amt Left: 10.63% $59,348.50
Over/Under Est: 53.44% $246,642.23
Amt Left: 26.79% $149,625.40
Delta: -14.61% -$90,276.90

Bid Items & Bid Tabulations

36 Total 0 of 36
HILL  |  CR  |  WACO  |  0909-37-065  |  04/05/2023  |  $461,541.17  |  BR 1802(254)  |  BRIDGE REPL  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PMCO CONSTRUCTION LLC
KNIFE RIVER CORPORATION - SOUTH
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 4.350 $3,900.000 $3,000.000 $4,000.000 $6,500.000
REMOVING CONC (RIPRAP)
SY 45.000 $15.960 $25.000 $25.000 $50.000
EXCAVATION (ROADWAY)
CY 30.000 $15.000 $20.000 $125.000 $50.000
EXCAVATION (CHANNEL)
CY 566.000 $15.000 $20.000 $20.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 379.000 $15.440 $20.000 $20.000 $35.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,215.000 $1.220 $3.000 $1.000 $4.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,680.000 $0.650 $1.400 $1.500 $1.500
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 1,680.000 $1.160 $1.300 $1.500 $1.500
VEGETATIVE WATERING
MG 122.400 $11.450 $10.000 $15.000 $1.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 161.000 $60.000 $120.000 $90.000 $75.000
CEM STABIL BKFL
CY 47.600 $149.690 $250.000 $285.000 $300.000
DRILL SHAFT (24 IN)
LF 285.000 $145.910 $245.000 $240.000 $175.000
CL C CONC (ABUT)
CY 19.600 $1,000.000 $1,300.000 $1,750.000 $1,800.000
CL C CONC (CAP)
CY 13.200 $1,200.000 $1,800.000 $2,250.000 $2,000.000
CL C CONC (COLUMN)
CY 4.600 $1,501.900 $2,000.000 $2,750.000 $2,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,080.000 $14.130 $22.000 $27.000 $38.000
PRESTR CONC SLAB BEAM (5SB12)
LF 400.000 $215.000 $228.000 $275.000 $320.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 455.000 $153.700 $140.000 $127.000 $180.000
RAIL (TY T223)
LF 184.000 $98.100 $150.000 $150.000 $180.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $33,788.770 $25,000.000 $28,000.000 $30,000.000
MOBILIZATION
LS 1.000 $35,993.320 $51,449.000 $60,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $1,000.000 $2,200.000 $1,500.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 127.000 $36.060 $40.000 $47.500 $1.000
ROCK FILTER DAMS (REMOVE)
LF 127.000 $9.310 $10.000 $15.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,036.000 $9.310 $4.000 $8.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,036.000 $1.100 $1.000 $1.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $36.280 $33.520 $36.000 $35.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,456.580 $1,750.000 $1,400.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,404.700 $1,750.000 $1,600.000 $1,800.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,543.980 $1,350.000 $850.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,470.080 $2,825.000 $3,800.000 $3,200.000
WIRE FENCE (TY C)
LF 180.000 $26.150 $20.000 $33.000 $20.000
REMOVE SM RD SN SUP&AM
EA 3.000 $132.880 $100.000 $62.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $27.940 $35.000 $17.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $39.690 $35.000 $50.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $87.060 $125.000 $200.000 $100.000
Totals: $461,541.174 $558,558.000 $617,906.500 $708,183.400