HILL FM 67 (0656-01-040)

Items: 146

County: HILL
Length: N/A
Highway: FM 67
District: WACO
Control Number: 0656-01-040
DBE Goal: N/A
Project: C 656-1-40
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $15,467,709.08
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$15,467,709.08
$17,279,323.32
Over/Under Est: 11.71% $1,811,614.24
Over/Under Est: 25.6% $3,959,137.52
Amt Left: 12.43% $2,147,523.28
Over/Under Est: 41.79% $6,463,320.95
Amt Left: 26.92% $4,651,706.71
Delta: -12.89% -$2,504,183.43
Over/Under Est: 62.98% $9,741,158.26
Amt Left: 45.89% $7,929,544.02
Delta: -14.95% -$3,277,837.31
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 14.31% $2,670,951.36
FORTSON CONTRACTING, INC. 1.87% $349,034.18
D. I. J. CONSTRUCTION, INC. 1.25% $233,311.61
J. H. ODEN CONTRACTING COMPANY 1.07% $199,714.74
MURRAY CONSTRUCTION 0.68% $126,921.52
WILKO INDUSTRIAL, L.L.C. 0.59% $110,123.08
COLD CREEK CONSTRUCTION, LTD 0.57% $106,390.10
SOUTHERN CROSS CONTRACTORS, LLC 0.49% $91,458.15
SOUTHWEST ENVIRONMENT SERVICES LLC 0.44% $82,125.69
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.37% $69,060.24
WEST TEXAS ROCK RESOURCES, LLC 0.12% $22,397.92
Total: 21.76% $4,061,488.59

Bid Items & Bid Tabulations

146 Total 0 of 146
HILL  |  FM 67  |  WACO  |  0656-01-040  |  04/04/2023  |  $15,467,709.08  |  C 656-1-40  |  REHAB EXIST ROADWAY  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 711.000 $1,000.000 $500.000 $500.000 $500.000 $1,050.000
REMOVING CONC (RIPRAP)
CY 6.700 $60.000 $625.000 $200.000 $220.000 $200.000
REMOVING CONC (SIDEWALKS)
SY 35.000 $15.000 $70.000 $25.000 $23.000 $50.000
REMOVING CONC (CURB)
LF 483.840 $5.100 $155.000 $60.000 $16.350 $25.000
REMOVING CONC (CURB AND GUTTER)
LF 10.000 $15.000 $125.000 $75.000 $32.400 $50.000
REMOVING CONC (MISC)
SY 4.000 $20.000 $100.000 $85.000 $132.000 $400.000
REMOVE CONC (RAIL)
LF 6.000 $25.000 $200.000 $60.000 $1.000 $100.000
REMOVING CONCRETE(MOW STRIP)
LF 6,143.000 $9.000 $9.250 $16.000 $11.330 $7.500
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,740.000 $10.000 $12.250 $10.000 $23.560 $10.000
OBLITERATING ABANDONED ROAD
SY 675.000 $5.000 $4.000 $20.000 $0.010 $15.000
EXCAVATION (ROADWAY)
CY 11,750.000 $10.000 $14.000 $12.000 $17.200 $3.150
EXCAVATION (CHANNEL)
CY 361.000 $17.000 $11.000 $35.000 $21.600 $31.500
SUBGRADE WIDENING (ORD COMP)
STA 711.000 $350.000 $250.000 $500.000 $0.010 $525.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 20,374.000 $15.000 $16.750 $12.000 $24.200 $31.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 115,743.000 $0.150 $0.170 $0.200 $0.250 $0.300
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 115,743.000 $0.250 $0.150 $0.200 $0.180 $0.250
VEGETATIVE WATERING
MG 1,879.600 $12.000 $1.000 $25.000 $40.000 $105.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 54,128.000 $2.000 $0.920 $1.000 $1.300 $1.250
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 40,074.000 $50.000 $68.000 $75.000 $97.700 $80.000
FL BS (RDWY DEL) (TY D GR 5)
TON 9,514.000 $40.000 $37.500 $50.000 $75.100 $27.500
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 259,107.000 $1.500 $1.000 $1.750 $2.050 $4.200
CEMENT
TON 3,112.000 $200.000 $225.000 $275.000 $245.000 $250.000
CEMENT TREAT(EXIST MATL)(8")
SY 259,107.000 $2.200 $1.750 $2.500 $3.550 $3.150
PRIME COAT (MC-30)
GAL 300.000 $5.000 $20.000 $7.000 $32.000 $32.550
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 347,747.000 $2.300 $2.700 $3.750 $3.650 $5.610
FOG SEAL (CSS-1H)
GAL 23,186.000 $3.000 $3.250 $6.000 $5.000 $5.010
ASPH (CRS-2)
GAL 106,474.000 $3.500 $3.250 $4.000 $3.500 $3.150
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 1,758.000 $125.000 $139.000 $150.000 $155.000 $148.050
PLANE ASPH CONC PAV(0" TO 3")
SY 301.000 $2.500 $16.500 $12.000 $35.000 $21.000
PLANE ASPH CONC PAV (2")
SY 3,368.000 $2.200 $3.300 $3.500 $6.000 $3.150
CEM STABIL BKFL
CY 9.300 $170.000 $375.000 $300.000 $354.000 $210.000
CUT & RESTORING PAV
SY 430.000 $90.000 $48.000 $100.000 $62.000 $236.250
TEMPORARY SPL SHORING
SF 5,412.000 $30.000 $29.000 $35.000 $28.000 $78.750
CL A CONC (CHANNEL LINING)
CY 274.000 $550.000 $405.000 $650.000 $379.000 $1,050.000
RIPRAP (CONC)(5 IN)
CY 69.200 $550.000 $600.000 $600.000 $560.000 $945.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 51.200 $140.000 $385.000 $200.000 $376.000 $352.990
RIPRAP (STONE PROTECTION)(18 IN)
CY 575.300 $150.000 $225.000 $225.000 $217.000 $405.470
RIPRAP (MOW STRIP)(4 IN)
CY 390.400 $500.000 $525.000 $600.000 $493.000 $892.500
RETROFIT RAIL (TY SSTR)
LF 208.000 $200.000 $400.000 $225.000 $300.000 $306.370
CMP (GAL STL 18 IN)
LF 360.000 $95.000 $80.000 $85.000 $76.000 $52.500
CMP (GAL STL 24 IN)
LF 32.000 $100.000 $95.000 $170.000 $92.000 $126.000
CONC BOX CULV (4 FT X 2 FT)
LF 92.000 $290.000 $360.000 $335.000 $340.000 $735.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 32.000 $600.000 $775.000 $585.000 $727.000 $630.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 18.000 $800.000 $875.000 $750.000 $821.000 $656.250
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 140.000 $1,000.000 $900.000 $1,150.000 $854.000 $892.500
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 75.000 $1,000.000 $1,000.000 $1,200.000 $954.000 $929.250
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 32.000 $950.000 $975.000 $1,250.000 $922.000 $971.250
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 44.000 $1,100.000 $1,100.000 $1,300.000 $1,033.000 $1,050.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 12.000 $1,700.000 $1,875.000 $1,400.000 $1,758.000 $1,260.000
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 24.000 $1,140.000 $1,025.000 $1,500.000 $975.000 $1,575.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 120.000 $1,500.000 $975.000 $1,600.000 $921.000 $2,100.000
RC PIPE (CL III)(18 IN)
LF 894.000 $70.000 $80.000 $88.000 $75.000 $68.250
RC PIPE (CL III)(24 IN)
LF 220.000 $80.000 $110.000 $125.000 $103.000 $147.000
RC PIPE (CL III)(36 IN)
LF 117.500 $140.000 $200.000 $200.000 $187.000 $236.250
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $6,000.000 $8,200.000 $6,000.000 $7,635.000 $4,725.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 6.000 $8,000.000 $8,700.000 $10,000.000 $8,102.000 $8,925.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $10,000.000 $11,000.000 $11,900.000 $10,539.000 $10,500.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $11,000.000 $12,000.000 $15,900.000 $11,453.000 $13,650.000
WINGWALL (FW - S) (HW=7 FT)
EA 1.000 $12,000.000 $15,000.000 $20,700.000 $14,155.000 $17,850.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $13,000.000 $17,000.000 $26,600.000 $16,304.000 $23,100.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $37,000.000 $38,000.000 $65,200.000 $36,224.000 $54,600.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $8,000.000 $10,750.000 $8,100.000 $10,146.000 $8,400.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $11,000.000 $12,500.000 $17,300.000 $11,896.000 $13,650.000
WINGWALL (PW - 1) (HW=6 FT)
EA 6.000 $15,000.000 $13,300.000 $17,500.000 $12,561.000 $15,750.000
WINGWALL (PW - 1) (HW=7 FT)
EA 5.000 $16,000.000 $15,500.000 $27,200.000 $14,582.000 $25,200.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $32,000.000 $17,500.000 $32,000.000 $16,504.000 $31,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,000.000 $12,000.000 $11,600.000 $11,477.000 $15,750.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
EA 1.000 $18,000.000 $39,000.000 $46,300.000 $37,732.000 $29,925.000
SET (TY I)(S= 9 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $14,000.000 $32,000.000 $35,000.000 $30,354.000 $31,500.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 42.000 $1,100.000 $1,400.000 $1,150.000 $1,340.000 $1,050.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 66.000 $1,100.000 $1,350.000 $1,150.000 $1,293.000 $1,050.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,500.000 $1,675.000 $1,500.000 $1,590.000 $1,575.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,700.000 $1,400.000 $1,275.000 $1,318.000 $1,260.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $1,500.000 $1,650.000 $1,500.000 $1,557.000 $1,575.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,900.000 $2,000.000 $1,788.000 $2,625.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,500.000 $2,200.000 $2,500.000 $2,082.000 $3,675.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $4,000.000 $4,125.000 $3,903.000 $4,725.000
CLEAN EXIST CULVERTS
EA 136.000 $1,400.000 $915.000 $2,100.000 $1,184.000 $1,575.000
REMOV STR (SET)
EA 140.000 $400.000 $550.000 $425.000 $520.000 $892.500
REMOV STR (WINGWALL)
EA 21.000 $1,000.000 $1,000.000 $3,400.000 $950.000 $2,100.000
REMOV STR (HEADWALL)
EA 2.000 $1,000.000 $1,000.000 $700.000 $950.000 $2,100.000
REMOV STR (PIPE)
LF 1,014.000 $13.000 $11.750 $17.500 $11.000 $47.250
REMOV STR (BOX CULVERT)
LF 136.000 $70.000 $70.000 $550.000 $67.000 $367.500
REMOVE STR (RAIL)
LF 566.670 $25.000 $16.000 $35.000 $30.000 $100.000
MOBILIZATION
LS 1.000 $1,384,337.000 $1,500,000.000 $1,942,400.000 $2,150,700.000 $2,530,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $10,000.000 $13,000.000 $7,500.000 $15,000.000 $52,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,480.000 $30.000 $45.000 $35.000 $50.000 $63.000
ROCK FILTER DAMS (REMOVE)
LF 3,480.000 $8.000 $15.000 $7.500 $12.000 $31.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,200.000 $3.500 $6.500 $3.000 $4.000 $2.630
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,200.000 $0.800 $1.000 $0.750 $1.000 $0.790
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 510.000 $10.000 $30.000 $15.500 $38.800 $25.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $10.000 $12.000 $6.500 $24.000 $12.500
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 510.000 $10.000 $29.000 $13.500 $38.200 $25.000
CONC CURB & GUTTER (TY II)
LF 10.000 $22.000 $105.000 $200.000 $100.000 $105.000
INTERSECTIONS (ACP)
SY 259.000 $40.000 $62.000 $35.000 $95.000 $88.690
DRIVEWAYS (ACP)
SY 10,262.000 $30.000 $54.000 $35.000 $80.000 $86.470
TURNOUTS (ACP)
SY 1,699.000 $30.000 $51.000 $45.000 $40.000 $22.380
DRIVEWAYS (CONC) (HES)
SY 1,381.000 $90.000 $160.000 $150.000 $153.000 $175.190
CONC SIDEWALKS (4")
SY 29.000 $60.000 $200.000 $150.000 $193.000 $105.000
CURB RAMPS (TY 3)
EA 1.000 $2,000.000 $4,100.000 $2,500.000 $4,057.000 $3,150.000
CURB RAMPS (TY 6)
EA 1.000 $2,200.000 $5,400.000 $3,000.000 $5,328.000 $3,150.000
CURB RAMPS (TY 10)
EA 1.000 $2,000.000 $3,400.000 $2,500.000 $3,138.000 $3,150.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 118,800.000 $0.250 $0.250 $0.200 $0.180 $0.130
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 59,400.000 $0.250 $0.250 $0.200 $0.200 $0.150
MTL W-BEAM GD FEN (STEEL POST)
LF 6,400.000 $35.000 $32.000 $40.000 $30.250 $31.760
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,600.000 $2,800.000 $3,000.000 $2,100.000 $3,163.620
SHORT RADIUS
LF 62.000 $50.000 $23.000 $65.000 $21.000 $22.050
MTL BM GD FEN TRANS (31"-28")
EA 4.000 $1,600.000 $700.000 $890.000 $650.000 $682.500
REMOVE METAL BEAM GUARD FENCE
LF 4,021.000 $2.200 $2.650 $6.000 $2.500 $2.630
GUARDRAIL END TREATMENT (INSTALL)
EA 44.000 $3,350.000 $2,800.000 $3,900.000 $2,650.000 $2,782.500
GUARDRAIL END TREATMENT (REMOVE)
EA 40.000 $260.000 $240.000 $475.000 $225.000 $236.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,600.000 $1,750.000 $1,525.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,600.000 $1,250.000 $890.000 $850.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,200.000 $7,500.000 $10,800.000 $13,500.000 $12,000.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 69.000 $250.000 $290.000 $220.000 $200.000 $304.500
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 5.000 $285.000 $320.000 $330.000 $300.000 $383.250
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $500.000 $475.000 $550.000 $500.000 $682.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000 $600.000 $615.000 $630.000 $575.000 $777.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 11.000 $800.000 $730.000 $880.000 $800.000 $938.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $1,000.000 $900.000 $880.000 $800.000 $1,109.850
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 163.000 $450.000 $420.000 $500.000 $450.000 $432.600
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 5.000 $540.000 $445.000 $660.000 $600.000 $523.950
REMOVE SM RD SN SUP&AM
EA 181.000 $120.000 $55.000 $195.000 $175.000 $98.700
RELOCATE SM RD SN SUP & AM TY TEMP
EA 181.000 $215.000 $215.000 $350.000 $200.000 $298.200
INSTL OM ASSM (OM-2X)(WC)GND
EA 66.000 $150.000 $70.000 $85.000 $65.000 $68.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 98.000 $25.000 $41.000 $35.000 $39.000 $40.950
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 143,970.000 $0.150 $0.240 $0.250 $0.220 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 11,403.000 $0.150 $0.280 $0.300 $0.260 $0.330
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 75,250.000 $0.150 $0.280 $0.300 $0.260 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,592.000 $1.000 $1.500 $1.500 $1.080 $5.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 132.000 $9.000 $7.500 $7.700 $7.000 $7.040
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 143,970.000 $0.700 $0.750 $0.800 $0.710 $0.700
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 11,403.000 $0.700 $0.730 $0.750 $0.690 $0.810
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 75,250.000 $0.700 $0.730 $0.750 $0.690 $0.700
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $270.000 $315.000 $330.000 $300.000 $395.850
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $700.000 $750.000 $750.000 $700.000 $918.750
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 1.000 $500.000 $525.000 $550.000 $500.000 $341.250
REFL PAV MRKR TY II-A-A
EA 1,536.000 $4.000 $6.500 $7.000 $6.400 $4.940
FULL - WIDTH MOWING
CYC 4.000 $4,000.000 $4,500.000 $4,500.000 $2,800.000 $16,202.310
SP MIXES SP-C SAC-B PG64-22
TON 174.000 $85.000 $270.000 $150.000 $275.000 $291.900
SP MIXES SP-C SAC-B PG70-22
TON 25,824.000 $100.000 $124.000 $110.000 $155.000 $151.940
TACK COAT
GAL 3,390.000 $3.300 $3.500 $4.250 $5.900 $6.300
UNDERSEAL COURSE
GAL 59,155.000 $2.500 $3.500 $5.000 $0.010 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $15,000.000 $10,000.000 $19,500.000 $20,000.000
TMA (STATIONARY)
DAY 120.000 $200.000 $530.000 $200.000 $3,201.000 $200.000
TMA (MOBILE OPERATION)
HR 300.000 $45.000 $40.000 $75.000 $40.000 $100.000
Totals: $15,467,709.084 $17,279,323.320 $19,426,846.600 $21,931,030.034 $25,208,867.354