Job Info for 0596-01-023

County: HILL Highway: FM 66 Date: 01/06/2022 (2 years ago) Engineer's Estimate: $2,407,365 Control Number: 0596-01-023
Project: C 596-1-23 District: WACO Time: 45 WORKING DAYS Type: REHABILITATE ROADWAY AND ADD CONCRETE PAVEMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,407,365.41
BIG CREEK CONSTRUCTION, LTD.   $2,787,392.75 1
15.79% | $380,027.34
TEXAS MATERIALS GROUP, INC.   $2,837,565.03 2
17.87% | $430,199.62
1.8% | $50,172.28
KNIFE RIVER CORPORATION - SOUTH   $2,845,807.62 3
18.21% | $438,442.21
2.1% | $58,414.87
0.29% | $8,242.59

Bid Items

Items: 59, 0 filtered
HILL FM 66  |  WACO  |  0596-01-023  |  01/06/2022  |  $2,407,365  |  C 596-1-23  |  REHAB ROADWAY AND ADD CONC PAVMT  |  45 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate BIG CREEK CONSTRUCTION, LTD. TEXAS MATERIALS GROUP, INC. KNIFE RIVER CORPORATION - SOUTH
134 6001 BACKFILL (TY A) STA 136.040 $155.000 $150.000 $130.000 $115.350
315 6001 FOG SEAL (SS-1) GAL 4,835.000 $3.000 $3.000 $3.200 $3.500
316 6022 ASPH (CRS-2) GAL 14,523.000 $3.070 $3.000 $2.650 $3.350
316 6485 AGGR (TY-D GR-5 OR TY-L GR-5) CY 387.000 $180.000 $100.000 $96.000 $102.750
346 6002 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 7,579.000 $106.000 $125.000 $150.000 $117.350
347 6001 TOM (ASPHALT) PG 76-22 TON 43.000 $116.000 $150.000 $155.000 $139.950
347 6002 TOM-C (AGGREGATE) SAC-A TON 583.000 $105.000 $150.000 $155.000 $139.950
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 500.000 $66.000 $65.000 $60.000 $93.300
354 6088 PLANE ASPH CONC PAV (0" TO 5") SY 6,860.000 $3.500 $3.500 $2.550 $3.500
354 6208 PLANE ASPH CONC PAV(MICRO-MLLING)(2") SY 11,354.000 $9.000 $2.750 $2.200 $5.200
361 6002 FULL - DEPTH REPAIR CRCP (8") SY 500.000 $200.000 $350.000 $315.000 $342.950
479 6004 ADJUSTING MANHOLES (SANITARY) EA 3.000 $915.000 $3,000.000 $4,200.000 $4,565.000
500 6001 MOBILIZATION LS 1.000 $203,000.000 $253,000.000 $171,000.000 $172,800.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $5,000.000 $6,000.000 $36,000.000 $9,060.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 250.000 $2.800 $5.000 $6.000 $8.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 250.000 $0.700 $1.000 $1.000 $1.000
530 6002 INTERSECTIONS (ACP) SY 1,528.000 $38.000 $25.000 $13.000 $24.000
530 6004 DRIVEWAYS (CONC) SY 1,817.000 $75.000 $125.000 $153.000 $148.950
530 6005 DRIVEWAYS (ACP) SY 1,474.000 $40.000 $25.000 $17.000 $37.500
533 6002 RUMBLE STRIPS (CENTERLINE) LF 12,676.000 $0.170 $0.600 $0.250 $0.500
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 22.000 $25.000 $30.000 $24.500 $26.650
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $570.000 $1,000.000 $927.000 $1,008.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 4.000 $900.000 $800.000 $755.000 $821.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 4.000 $975.000 $1,000.000 $885.000 $962.000
644 6038 IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL) EA 5.000 $1,235.000 $1,250.000 $1,140.000 $1,240.000
644 6044 IN SM RD SN SUP&AM TYS80(1)SB(U) EA 4.000 $810.000 $1,000.000 $905.000 $984.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 83.000 $370.000 $350.000 $325.000 $354.000
644 6076 REMOVE SM RD SN SUP&AM EA 96.000 $110.000 $65.000 $60.000 $65.250
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 8.000 $25.000 $25.000 $20.000 $22.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 1.000 $100.000 $75.000 $60.000 $65.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 36.000 $30.000 $65.000 $60.000 $65.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 7.000 $95.000 $75.000 $65.000 $71.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,358.000 $0.480 $1.000 $1.000 $1.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 20.000 $0.900 $1.000 $10.000 $10.850
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 416.000 $7.000 $6.000 $6.000 $6.500
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 1,634.000 $0.350 $1.000 $0.480 $0.520
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 3,040.000 $0.400 $1.000 $0.530 $0.580
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 14,007.000 $0.350 $0.750 $0.480 $0.520
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 28,408.000 $0.480 $0.750 $0.700 $0.760
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 5.000 $270.000 $275.000 $315.000 $342.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 1.000 $600.000 $700.000 $685.000 $745.000
668 6114 PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)SM EA 5.000 $250.000 $250.000 $415.000 $451.000
672 6009 REFL PAV MRKR TY II-A-A EA 329.000 $3.350 $3.600 $5.000 $5.450
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 3,306.000 $0.500 $1.000 $0.700 $0.750
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 36.000 $6.100 $3.000 $10.000 $10.850
677 6016 ELIM EXT PAV MRK & MRKS (RR XING) EA 1.000 $150.000 $400.000 $350.000 $380.000
678 6001 PAV SURF PREP FOR MRK (4") LF 1,734.000 $0.100 $1.000 $0.500 $0.540
3000 6004 CAM (AGGREGATE) TON 583.000 $125.000 $150.000 $142.000 $134.900
3000 6005 CAM (ASPHALT)(PG 64-22) TON 43.000 $130.000 $150.000 $142.000 $134.900
3089 6002 CEMENT TON 203.000 $199.010 $0.000 $0.000 $168.000
3089 6003 EMULSION GAL 188,614.000 $1.240 $0.000 $0.000 $2.600
3089 6009 EMUL TRTMNT (MX EXIST MATL) 10" SY 45,123.000 $3.500 $0.000 $0.000 $1.700
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 42.000 $75.000 $100.000 $90.000 $270.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $7,500.000 $4,000.000 $4,100.000 $2,800.000
6185 6002 TMA (STATIONARY) DAY 72.000 $150.000 $200.000 $1.000 $570.000
6185 6003 TMA (MOBILE OPERATION) HR 50.000 $64.000 $70.000 $25.000 $89.000
1 3088 6001 CEMENT TON 203.000 $200.000 $225.000 $146.000 $0.000
1 3088 6002 ASPHALT BINDER (PG 64-22) TON 508.000 $460.000 $600.000 $550.000 $0.000
1 3088 6005 FOAMED ASPHALT TREAT (10")(DC) SY 45,123.000 $3.500 $4.000 $2.800 $0.000
Totals: $2,839,576.30 $2,787,392.75 $2,837,565.03 $2,845,807.62