PREPARING ROW
|
AC
|
16.500
|
$5,000.000
|
$6,000.000
|
$90,910.000
|
$150,000.000
|
|
|
PREPARING ROW
|
STA
|
35.400
|
$2,000.000
|
$5,000.000
|
$69,687.000
|
$84,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
920.000
|
$15.000
|
$35.000
|
$28.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
18,430.000
|
$10.300
|
$6.000
|
$5.000
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
41,233.000
|
$15.000
|
$12.000
|
$8.000
|
$11.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
74,619.000
|
$18.000
|
$15.000
|
$6.000
|
$46.400
|
|
|
BACKFILL (TY A OR B)
|
CY
|
93.000
|
$20.000
|
$55.000
|
$70.000
|
$51.000
|
|
|
SPEC EXCAV WORK (VEHICLE)
|
CY
|
42,900.000
|
$12.000
|
$8.000
|
$13.000
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
45,025.000
|
$1.500
|
$1.600
|
$2.000
|
$3.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
44,071.000
|
$0.250
|
$0.350
|
$0.300
|
$0.810
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
22,621.000
|
$0.150
|
$0.150
|
$0.200
|
$0.340
|
|
|
VEGETATIVE WATERING
|
MG
|
367.100
|
$30.000
|
$25.000
|
$28.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
14,068.000
|
$1.280
|
$1.600
|
$1.000
|
$1.250
|
|
|
PROOF ROLLING
|
HR
|
5.050
|
$100.000
|
$95.000
|
$115.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
4,615.000
|
$44.000
|
$70.000
|
$55.000
|
$61.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
2,682.000
|
$3.800
|
$10.000
|
$7.000
|
$7.000
|
|
|
ASPH (CRS-2)
|
GAL
|
7,991.000
|
$3.050
|
$5.000
|
$6.000
|
$6.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
132.000
|
$144.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,498.000
|
$1.800
|
$5.500
|
$3.500
|
$5.210
|
|
|
CONC PVMT (CONT REINF - CRCP) (7")
|
SY
|
477.000
|
$105.000
|
$200.000
|
$257.000
|
$85.000
|
|
|
CURB (TYPE II)
|
LF
|
460.000
|
$50.000
|
$45.000
|
$66.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
311.000
|
$125.000
|
$250.000
|
$132.000
|
$160.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
225.000
|
$30.000
|
$100.000
|
$102.000
|
$111.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
258.000
|
$90.000
|
$265.000
|
$130.000
|
$103.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,573.000
|
$320.000
|
$1,249.000
|
$990.000
|
$850.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
624.000
|
$1,000.000
|
$1,900.000
|
$1,035.000
|
$1,200.000
|
|
|
CL B CONC (FLUME)
|
CY
|
18.500
|
$700.000
|
$660.000
|
$551.000
|
$690.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
78.600
|
$1,500.000
|
$1,600.000
|
$1,229.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
250.700
|
$1,500.000
|
$3,000.000
|
$1,739.000
|
$2,100.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
246.700
|
$1,500.000
|
$2,000.000
|
$1,777.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
66,700.000
|
$18.000
|
$35.000
|
$29.000
|
$29.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$600.000
|
$850.000
|
$656.000
|
$610.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
11,046.000
|
$180.000
|
$246.000
|
$207.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
70.000
|
$525.000
|
$800.000
|
$914.000
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
12.000
|
$600.000
|
$1,000.000
|
$1,004.000
|
$660.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
22,356.000
|
$110.000
|
$99.000
|
$117.000
|
$120.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
156.000
|
$175.000
|
$240.000
|
$231.000
|
$245.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
279.000
|
$460.000
|
$800.000
|
$1,015.000
|
$615.000
|
|
|
RAIL (TY T402)
|
LF
|
2,956.000
|
$130.000
|
$160.000
|
$157.000
|
$140.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
270.000
|
$115.000
|
$110.000
|
$177.000
|
$182.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
36.000
|
$120.000
|
$55.000
|
$51.000
|
$50.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
18.000
|
$800.000
|
$2,500.000
|
$2,234.000
|
$2,500.000
|
|
|
WINGWALL (FW - S) (HW=12 FT)
|
EA
|
1.000
|
$50,000.000
|
$45,000.000
|
$40,610.000
|
$44,610.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$2,031.000
|
$2,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2.000
|
$300.000
|
$550.000
|
$508.000
|
$500.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$1,500,000.000
|
$1,900,000.000
|
$2,244,590.170
|
$2,500,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,500,000.000
|
$2,300,000.000
|
$2,466,900.000
|
$3,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$9,000.000
|
$12,000.000
|
$4,429.000
|
$36,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
90.000
|
$25.000
|
$50.000
|
$48.000
|
$36.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$5.750
|
$10.000
|
$12.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$40.000
|
$30.000
|
$20.000
|
$45.050
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$15.000
|
$10.000
|
$7.500
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,157.000
|
$3.000
|
$3.000
|
$3.500
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,157.000
|
$0.700
|
$1.000
|
$1.000
|
$1.150
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$4,000.000
|
$5,000.000
|
$3,900.000
|
$2,165.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
6,155.000
|
$12.000
|
$16.000
|
$11.000
|
$15.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
6,255.000
|
$5.750
|
$3.500
|
$6.000
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
6,155.000
|
$11.400
|
$16.000
|
$11.000
|
$12.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
330.000
|
$10.000
|
$100.000
|
$102.000
|
$15.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,953.000
|
$28.000
|
$33.000
|
$33.500
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,200.000
|
$2,600.000
|
$2,265.000
|
$2,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,579.000
|
$2.300
|
$1.500
|
$3.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,600.000
|
$3,075.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$1,600.000
|
$1,600.000
|
$918.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,300.000
|
$1,600.000
|
$1,045.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$8,000.000
|
$11,000.000
|
$7,470.000
|
$8,125.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
509.000
|
$32.000
|
$35.000
|
$35.000
|
$35.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
555.000
|
$6.000
|
$15.000
|
$6.000
|
$10.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$565.000
|
$800.000
|
$751.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$660.000
|
$1,000.000
|
$950.000
|
$870.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$1,100.000
|
$981.000
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$825.000
|
$750.000
|
$714.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$765.000
|
$1,200.000
|
$1,077.000
|
$1,080.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$105.000
|
$700.000
|
$665.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$105.000
|
$110.000
|
$105.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
58.000
|
$25.000
|
$20.000
|
$27.000
|
$18.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
122.000
|
$35.000
|
$40.000
|
$50.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-1)(WFLX)GND
|
EA
|
2.000
|
$63.000
|
$390.000
|
$75.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
982.000
|
$0.150
|
$2.100
|
$2.000
|
$0.190
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
13,390.000
|
$0.650
|
$1.050
|
$1.000
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
4,596.000
|
$1.500
|
$1.050
|
$1.000
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
21,662.000
|
$0.650
|
$1.050
|
$1.000
|
$0.640
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$150.000
|
$210.000
|
$200.000
|
$128.860
|
|
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
|
LF
|
1,668.000
|
$2.060
|
$2.650
|
$2.500
|
$1.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,400.000
|
$0.500
|
$1.050
|
$1.000
|
$0.290
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,400.000
|
$0.500
|
$1.050
|
$1.000
|
$0.300
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
2.000
|
$315.000
|
$240.000
|
$225.000
|
$103.590
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
262.000
|
$3.330
|
$4.200
|
$4.000
|
$2.980
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,772.000
|
$1.000
|
$0.500
|
$0.500
|
$0.350
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,622.000
|
$90.000
|
$150.000
|
$115.000
|
$115.000
|
|
|
D-GR HMA TY-C SAC-B PG64-22
|
TON
|
582.000
|
$100.000
|
$160.000
|
$135.000
|
$135.000
|
|
|
TACK COAT
|
GAL
|
953.000
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
1,657.000
|
$130.000
|
$190.000
|
$140.000
|
$140.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
2,712.000
|
$2.940
|
$5.000
|
$5.000
|
$4.500
|
|
|
WHEEL STOPS
|
EA
|
37.000
|
$60.000
|
$110.000
|
$75.000
|
$80.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,000.000
|
$15,000.000
|
$15,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
58.000
|
$150.000
|
$300.000
|
$239.000
|
$212.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
216.000
|
$40.000
|
$25.000
|
$90.000
|
$81.000
|
|
Totals: |
$16,611,185.260
|
$23,690,786.750
|
$24,669,517.720
|
$30,950,125.020
|