HILL SH 174 (0519-02-019)

Items: 98

County: HILL
Length: N/A
Highway: SH 174
District: WACO
Control Number: 0519-02-019
DBE Goal: N/A
Project: BR 2022(480)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $16,611,185.26
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$16,611,185.26
$23,690,786.75
Over/Under Est: 42.62% $7,079,601.49
$24,669,517.72
Over/Under Est: 48.51% $8,058,332.46
Amt Left: 4.13% $978,730.97
Over/Under Est: 86.32% $14,338,939.76
Amt Left: 30.64% $7,259,338.27
Delta: -25.46% -$6,280,607.30
Subcontractor Percentage Amount
HUNTER DEMOLITION & WRECKING CORPORATION 6.20% $1,413,096.04
FORTSON CONTRACTING, INC. 0.90% $205,126.84
BEAR CREEK CONSTRUCTION, LLC 0.54% $123,076.11
HERMANOS STEEL, LLC 0.40% $91,167.49
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.37% $84,329.92
STRIPING TECHNOLOGY, L.P. 0.33% $75,213.18
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.12% $27,350.25
ROADWAY SPECIALTIES, INC. 0.08% $18,233.50
FARR FOUNDATION, INC. 0.07% $15,954.31
A BROTHERS MILLING, LLC 0.06% $13,675.12
PRIMATE CONSTRUCTION, LP 0.06% $13,675.12
ROCKIN C MILLING 0.05% $11,395.94
WEST TEXAS RUMBLE STRIP LLC 0.02% $4,558.37
Total: 9.20% $2,096,852.19

Bid Items & Bid Tabulations

98 Total 0 of 98
HILL  |  SH 174  |  WACO  |  0519-02-019  |  05/05/2022  |  $16,611,185.26  |  BR 2022(480)  |  REPLACE BRIDGES AND APPROACHES  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
WEBBER, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
AC 16.500 $5,000.000 $6,000.000 $90,910.000 $150,000.000
PREPARING ROW
STA 35.400 $2,000.000 $5,000.000 $69,687.000 $84,000.000
REMOVING CONC (RIPRAP)
SY 920.000 $15.000 $35.000 $28.000 $10.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 18,430.000 $10.300 $6.000 $5.000 $4.000
EXCAVATION (ROADWAY)
CY 41,233.000 $15.000 $12.000 $8.000 $11.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 74,619.000 $18.000 $15.000 $6.000 $46.400
BACKFILL (TY A OR B)
CY 93.000 $20.000 $55.000 $70.000 $51.000
SPEC EXCAV WORK (VEHICLE)
CY 42,900.000 $12.000 $8.000 $13.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 45,025.000 $1.500 $1.600 $2.000 $3.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 44,071.000 $0.250 $0.350 $0.300 $0.810
DRILL SEED (TEMP)(WARM OR COOL)
SY 22,621.000 $0.150 $0.150 $0.200 $0.340
VEGETATIVE WATERING
MG 367.100 $30.000 $25.000 $28.000 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 14,068.000 $1.280 $1.600 $1.000 $1.250
PROOF ROLLING
HR 5.050 $100.000 $95.000 $115.000 $100.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 4,615.000 $44.000 $70.000 $55.000 $61.000
PRIME COAT(MC-30 OR AE-P)
GAL 2,682.000 $3.800 $10.000 $7.000 $7.000
ASPH (CRS-2)
GAL 7,991.000 $3.050 $5.000 $6.000 $6.000
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 132.000 $144.000 $250.000 $250.000 $250.000
PLANE ASPH CONC PAV (2")
SY 2,498.000 $1.800 $5.500 $3.500 $5.210
CONC PVMT (CONT REINF - CRCP) (7")
SY 477.000 $105.000 $200.000 $257.000 $85.000
CURB (TYPE II)
LF 460.000 $50.000 $45.000 $66.000 $15.000
CEM STABIL BKFL
CY 311.000 $125.000 $250.000 $132.000 $160.000
TEMPORARY SPL SHORING
SF 225.000 $30.000 $100.000 $102.000 $111.000
DRILL SHAFT (18 IN)
LF 258.000 $90.000 $265.000 $130.000 $103.000
DRILL SHAFT (42 IN)
LF 2,573.000 $320.000 $1,249.000 $990.000 $850.000
DRILL SHAFT (48 IN)
LF 624.000 $1,000.000 $1,900.000 $1,035.000 $1,200.000
CL B CONC (FLUME)
CY 18.500 $700.000 $660.000 $551.000 $690.000
CL C CONC (ABUT)(HPC)
CY 78.600 $1,500.000 $1,600.000 $1,229.000 $1,000.000
CL C CONC (CAP)(HPC)
CY 250.700 $1,500.000 $3,000.000 $1,739.000 $2,100.000
CL C CONC (COLUMN)(HPC)
CY 246.700 $1,500.000 $2,000.000 $1,777.000 $2,000.000
REINF CONC SLAB
SF 66,700.000 $18.000 $35.000 $29.000 $29.000
APPROACH SLAB
CY 70.600 $600.000 $850.000 $656.000 $610.000
PRESTR CONC GIRDER (TX62)
LF 11,046.000 $180.000 $246.000 $207.000 $250.000
RIPRAP (CONC)(4 IN)
CY 70.000 $525.000 $800.000 $914.000 $600.000
RIPRAP (CONC)(5 IN)
CY 12.000 $600.000 $1,000.000 $1,004.000 $660.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 22,356.000 $110.000 $99.000 $117.000 $120.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 156.000 $175.000 $240.000 $231.000 $245.000
RIPRAP (MOW STRIP)(4 IN)
CY 279.000 $460.000 $800.000 $1,015.000 $615.000
RAIL (TY T402)
LF 2,956.000 $130.000 $160.000 $157.000 $140.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 270.000 $115.000 $110.000 $177.000 $182.000
CMP (GAL STL 12 IN)
LF 36.000 $120.000 $55.000 $51.000 $50.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 18.000 $800.000 $2,500.000 $2,234.000 $2,500.000
WINGWALL (FW - S) (HW=12 FT)
EA 1.000 $50,000.000 $45,000.000 $40,610.000 $44,610.000
REMOV STR (WINGWALL)
EA 1.000 $1,500.000 $2,000.000 $2,031.000 $2,000.000
REMOV STR (BOX CULVERT)
LF 2.000 $300.000 $550.000 $508.000 $500.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $1,500,000.000 $1,900,000.000 $2,244,590.170 $2,500,000.000
MOBILIZATION
LS 1.000 $1,500,000.000 $2,300,000.000 $2,466,900.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $9,000.000 $12,000.000 $4,429.000 $36,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 90.000 $25.000 $50.000 $48.000 $36.700
ROCK FILTER DAMS (REMOVE)
LF 90.000 $5.750 $10.000 $12.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $40.000 $30.000 $20.000 $45.050
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $15.000 $10.000 $7.500 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,157.000 $3.000 $3.000 $3.500 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,157.000 $0.700 $1.000 $1.000 $1.150
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 12.000 $4,000.000 $5,000.000 $3,900.000 $2,165.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 6,155.000 $12.000 $16.000 $11.000 $15.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 6,255.000 $5.750 $3.500 $6.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 6,155.000 $11.400 $16.000 $11.000 $12.000
CONC CURB (SLOTTED)
LF 330.000 $10.000 $100.000 $102.000 $15.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,953.000 $28.000 $33.000 $33.500 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,200.000 $2,600.000 $2,265.000 $2,250.000
REMOVE METAL BEAM GUARD FENCE
LF 3,579.000 $2.300 $1.500 $3.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,600.000 $3,075.000 $2,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $1,600.000 $1,600.000 $918.000 $1,200.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,300.000 $1,600.000 $1,045.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,000.000 $11,000.000 $7,470.000 $8,125.000
CHAIN LINK FENCE (INSTALL) (6')
LF 509.000 $32.000 $35.000 $35.000 $35.000
CHAIN LINK FENCE (REMOVE)
LF 555.000 $6.000 $15.000 $6.000 $10.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $565.000 $800.000 $751.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $660.000 $1,000.000 $950.000 $870.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $800.000 $1,100.000 $981.000 $940.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $825.000 $750.000 $714.000 $790.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $765.000 $1,200.000 $1,077.000 $1,080.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $105.000 $700.000 $665.000 $550.000
REMOVE SM RD SN SUP&AM
EA 14.000 $105.000 $110.000 $105.000 $20.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 58.000 $25.000 $20.000 $27.000 $18.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 122.000 $35.000 $40.000 $50.000 $35.000
INSTL OM ASSM (OM-1)(WFLX)GND
EA 2.000 $63.000 $390.000 $75.000 $55.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 982.000 $0.150 $2.100 $2.000 $0.190
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 13,390.000 $0.650 $1.050 $1.000 $0.650
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,596.000 $1.500 $1.050 $1.000 $1.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 21,662.000 $0.650 $1.050 $1.000 $0.640
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $150.000 $210.000 $200.000 $128.860
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 1,668.000 $2.060 $2.650 $2.500 $1.250
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,400.000 $0.500 $1.050 $1.000 $0.290
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 10,400.000 $0.500 $1.050 $1.000 $0.300
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 2.000 $315.000 $240.000 $225.000 $103.590
REFL PAV MRKR TY II-A-A
EA 262.000 $3.330 $4.200 $4.000 $2.980
ELIM EXT PAV MRK & MRKS (4")
LF 11,772.000 $1.000 $0.500 $0.500 $0.350
D-GR HMA TY-B PG64-22
TON 4,622.000 $90.000 $150.000 $115.000 $115.000
D-GR HMA TY-C SAC-B PG64-22
TON 582.000 $100.000 $160.000 $135.000 $135.000
TACK COAT
GAL 953.000 $4.000 $4.500 $4.000 $4.000
SP MIXES SP-C SAC-A PG70-22
TON 1,657.000 $130.000 $190.000 $140.000 $140.000
UNDERSEAL COURSE
GAL 2,712.000 $2.940 $5.000 $5.000 $4.500
WHEEL STOPS
EA 37.000 $60.000 $110.000 $75.000 $80.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,000.000 $15,000.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 58.000 $150.000 $300.000 $239.000 $212.000
TMA (MOBILE OPERATION)
HR 216.000 $40.000 $25.000 $90.000 $81.000
Totals: $16,611,185.260 $23,690,786.750 $24,669,517.720 $30,950,125.020