HILL SH 171 (0019-03-028)

Items: 158

County: HILL
Length: N/A
Highway: SH 171
District: WACO
Control Number: 0019-03-028
DBE Goal: N/A
Project: STP 2022(886)HES
Guaranty: N/A
Time: 270 WORKING DAYS
Engineer's Estimate: $6,082,873.46
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,082,873.46
$5,859,952.50
Over/Under Est: -3.66% -$222,920.96
$7,547,889.97
Over/Under Est: 24.08% $1,465,016.51
Amt Left: 28.8% $1,687,937.47
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 18.26% $1,070,027.33
ROADWAY SPECIALTIES, INC. 6.81% $399,062.77
D. I. J. CONSTRUCTION, INC. 2.02% $118,371.04
MARLANE CONSTRUCTION, LLC 1.79% $104,893.15
DALLAS LITE AND BARRICADE, INC. 1.32% $77,351.37
SURFACE PREPARATION TECHNOLOGIES, LLC 0.63% $36,917.70
DAILY HYDROVAC SERVICES, LLC 0.07% $4,101.97
Total: 30.90% $1,810,725.33

Bid Items & Bid Tabulations

158 Total 0 of 158
HILL  |  SH 171  |  WACO  |  0019-03-028  |  08/03/2022  |  $6,082,873.46  |  STP 2022(886)HES  |  HAZARD ELIM & SAFETY  |  270 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BEAR CREEK CONTRACTING, LLC
TEXAS-REYES GROUP LTD.
PREPARING ROW
STA 8.300 $2,100.000 $6,845.000 $12,107.000
REMOVING CONC (RIPRAP)
SY 73.600 $9.000 $50.000 $200.000
REMOVING CONC (RIPRAP)
CY 4.000 $135.000 $196.000 $1,500.000
REMOVING CONCRETE(MOW STRIP)
LF 500.000 $9.000 $10.000 $100.000
EXCAVATION (CHANNEL)
CY 119.000 $35.000 $8.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 6.000 $50.000 $70.000 $150.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 418.800 $26.000 $32.000 $150.000
BLADING
STA 32.000 $270.000 $418.000 $1,000.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 11,398.000 $0.600 $3.000 $0.470
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 11,398.000 $0.500 $3.000 $0.360
VEGETATIVE WATERING
MG 185.000 $30.000 $28.000 $250.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 5,699.000 $1.600 $5.000 $1.700
CEM STABIL BKFL
CY 377.150 $145.000 $224.000 $350.000
CUT & RESTORING PAV
SY 1,160.000 $100.000 $52.000 $95.000
TRENCH EXCAVATION PROTECTION
LF 403.000 $8.500 $10.000 $5.000
TEMPORARY SPL SHORING
SF 5,175.000 $29.000 $24.000 $20.000
CL C CONC (PILE ENCASEMENT)
CY 2.700 $3,500.000 $6,708.000 $8,686.500
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 6.000 $382.000 $1,151.000 $988.250
RIPRAP (CONC)(5 IN)
CY 147.050 $544.000 $650.000 $600.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 119.000 $289.000 $302.000 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 215.000 $150.000 $182.000 $450.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,528.400 $140.000 $172.000 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 81.000 $185.000 $165.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 230.100 $450.000 $477.000 $800.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 2.250 $438.000 $517.000 $3,134.500
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 116.000 $37.000 $88.000 $134.500
RETROFIT RAIL (TY T631)
LF 251.500 $91.000 $151.000 $112.250
CONC BOX CULV (4 FT X 3 FT)
LF 90.000 $457.000 $335.000 $550.000
CONC BOX CULV (5 FT X 2 FT)
LF 573.000 $338.000 $336.000 $550.000
CONC BOX CULV (5 FT X 4 FT)
LF 104.000 $538.000 $400.000 $685.250
CONC BOX CULV (6 FT X 3 FT)
LF 348.000 $463.000 $441.000 $650.000
CONC BOX CULV (10 FT X 6 FT)
LF 88.000 $1,125.000 $1,149.000 $1,000.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 4.000 $875.000 $979.000 $2,706.750
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 18.000 $757.000 $566.000 $809.250
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 4.000 $1,169.000 $1,211.000 $2,951.500
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 8.000 $1,069.000 $733.000 $1,520.500
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 8.000 $1,075.000 $749.000 $1,592.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 8.000 $1,250.000 $905.000 $1,631.500
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 8.000 $1,338.000 $947.000 $2,184.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 8.000 $1,394.000 $1,037.000 $1,968.250
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 8.000 $1,438.000 $1,145.000 $2,445.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 24.000 $1,582.000 $1,166.000 $2,753.250
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 4.000 $1,025.000 $809.000 $1,484.250
RC PIPE (CL III)(18 IN)
LF 1,096.000 $75.000 $78.000 $0.000
RC PIPE (CL III)(24 IN)
LF 1,340.000 $94.000 $94.000 $0.000
RC PIPE (CL III)(30 IN)
LF 772.000 $150.000 $112.000 $0.000
RC PIPE (CL III)(36 IN)
LF 120.000 $219.000 $146.000 $0.000
RC PIPE (CL III)(42 IN)
LF 40.000 $250.000 $260.000 $400.000
RC PIPE (CL III)(48 IN)
LF 24.000 $238.000 $317.000 $833.750
WINGWALL (FW - 0) (HW=12 FT)
EA 3.000 $36,625.000 $34,000.000 $35,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 3.000 $13,500.000 $9,731.000 $15,222.500
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $11,875.000 $10,288.000 $16,158.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $16,250.000 $22,500.000 $18,575.250
WINGWALL (FW - S) (HW=10 FT)
EA 1.000 $18,750.000 $28,000.000 $29,678.750
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $12,813.000 $9,286.000 $9,622.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $15,625.000 $9,719.000 $12,915.500
WINGWALL (FW - S) (HW=7 FT)
EA 4.000 $17,125.000 $11,720.000 $15,143.250
WINGWALL (FW - S) (HW=9 FT)
EA 2.000 $26,525.000 $14,252.000 $18,246.500
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $45,375.000 $32,000.000 $37,631.500
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $74,500.000 $45,000.000 $67,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $25,750.000 $13,766.000 $19,822.500
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 2.000 $6,625.000 $10,643.000 $9,130.500
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $8,750.000 $11,365.000 $8,978.500
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $9,000.000 $11,470.000 $12,824.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $6,875.000 $11,413.000 $11,270.500
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 8.000 $9,000.000 $3,905.000 $7,268.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (P)
EA 4.000 $12,500.000 $21,090.000 $17,228.250
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $10,375.000 $12,638.000 $17,146.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 10.000 $13,750.000 $18,287.000 $17,586.500
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $10,669.000 $14,640.000 $17,585.500
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 171.000 $1,125.000 $1,157.000 $1,833.250
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,313.000 $1,035.000 $3,148.750
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $2,063.000 $1,381.000 $2,608.250
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 144.000 $1,875.000 $1,381.000 $2,116.250
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $2,125.000 $1,349.000 $3,077.500
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 11.000 $2,625.000 $1,650.000 $2,454.750
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 58.000 $2,625.000 $2,505.000 $2,971.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $3,188.000 $2,641.000 $3,174.250
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 8.000 $3,500.000 $2,689.000 $3,624.250
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 10.000 $4,375.000 $4,521.000 $4,214.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 2.000 $4,400.000 $3,159.000 $5,963.250
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000 $5,313.000 $3,946.000 $6,091.500
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $7,500.000 $5,602.000 $9,342.250
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 2.000 $5,313.000 $3,595.000 $8,361.750
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 2.000 $6,875.000 $5,362.000 $9,105.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 4.000 $9,375.000 $9,568.000 $14,260.000
CLEAN EXIST CULVERTS
EA 156.000 $2,300.000 $1,307.000 $1,550.250
REMOV STR (SET)
EA 50.000 $500.000 $393.000 $767.250
REMOV STR (WINGWALL)
EA 32.000 $3,500.000 $785.000 $2,254.000
REMOV STR (HEADWALL)
EA 36.000 $1,350.000 $785.000 $951.000
REMOV STR (PIPE)
LF 3,755.500 $18.000 $11.000 $21.000
REMOV STR (BOX CULVERT)
LF 208.000 $81.000 $49.000 $454.000
REMOVE STR (CONC)
EA 1.000 $5,400.000 $1,308.000 $5,828.500
MOBILIZATION
LS 1.000 $577,523.230 $508,551.000 $750,019.760
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $5,500.000 $2,489.000 $6,882.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 820.000 $25.000 $61.000 $44.000
ROCK FILTER DAMS (REMOVE)
LF 820.000 $5.500 $5.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,100.000 $3.500 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,100.000 $0.800 $2.000 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 420.000 $25.000 $20.000 $50.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 420.000 $9.000 $6.000 $100.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 420.000 $12.000 $20.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 178,352.000 $0.150 $0.300 $0.090
RUMBLE STRIPS (CENTERLINE)
LF 89,177.000 $0.180 $0.300 $0.090
MTL W-BEAM GD FEN (STEEL POST)
LF 1,675.000 $32.000 $44.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,500.000 $3,499.000 $2,580.000
SHORT RADIUS
LF 100.000 $38.000 $49.000 $34.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $875.000 $981.000 $830.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 325.000 $75.000 $139.000 $78.000
MTL BM GD FEN TRANS (31"-28")
EA 4.000 $875.000 $1,727.000 $1,325.000
REMOVE METAL BEAM GUARD FENCE
LF 1,157.500 $2.250 $2.000 $0.570
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $265.000 $561.000 $156.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $294.000 $265.000 $187.000
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $4,125.000 $3,989.000 $3,060.000
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $285.000 $265.000 $260.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,650.000 $2,489.000 $1,200.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,313.000 $3,734.000 $700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,875.000 $11,678.000 $8,630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $540.000 $961.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $750.000 $1,160.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $1,100.000 $1,495.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,200.000 $1,587.000 $1,050.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $2,240.000 $3,173.000 $2,250.000
REMOVE SM RD SN SUP&AM
EA 33.000 $145.000 $155.000 $50.000
ISRSA TY10BWG(1)SA(T) (EXCLUDING SIGN)
EA 16.000 $915.000 $3,111.000 $500.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 74.000 $53.000 $272.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 90.000 $30.000 $57.000 $55.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,150.000 $1.000 $3.000 $0.660
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 44.000 $2.000 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 106.000 $1.800 $2.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 110.000 $13.500 $17.000 $6.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 178,352.000 $0.350 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 17,904.000 $0.350 $0.500 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 83,425.000 $0.350 $0.450 $0.550
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $500.000 $373.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $500.000 $448.000 $350.000
REFL PAV MRKR TY I-C
EA 10.000 $6.100 $19.000 $4.000
REFL PAV MRKR TY II-A-A
EA 1,941.000 $3.200 $5.000 $3.600
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $85.000 $187.000 $100.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 80.000 $12.000 $4.000 $10.000
FULL - WIDTH MOWING
AC 604.000 $53.000 $100.000 $75.000
LITTER REMOVAL
CYC 6.000 $2,700.000 $5,006.000 $500.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 72.000 $2,150.000 $300.000 $684.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 18.000 $3,200.000 $6,000.000 $745.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $125.000 $156.000 $85.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,000.000 $3,111.000 $12,563.250
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $23.000 $13.000 $16.000
TMA (STATIONARY)
DAY 100.000 $200.000 $867.000 $200.000
TMA (MOBILE OPERATION)
HR 160.000 $75.000 $289.000 $85.500
SOLAR POWERED LED SIGN
EA 16.000 $5,240.000 $3,111.000 $2,307.500
1
RC PIPE (CL III)(18 IN)
LF 800.000 $75.000 $0.000 $200.000
1
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 296.000 $75.000 $0.000 $115.000
2
RC PIPE (CL III)(24 IN)
LF 512.000 $94.000 $0.000 $205.000
2
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 828.000 $94.000 $0.000 $120.000
3
RC PIPE (CL III)(30 IN)
LF 88.000 $150.000 $0.000 $210.000
3
THERMOPLASTIC PIPE(30 IN)(PP)(TYPE III)
LF 684.000 $150.000 $0.000 $130.000
4
RC PIPE (CL III)(36 IN)
LF 48.000 $219.000 $0.000 $215.000
4
THERMOPLASTIC PIPE(36")(PP) (TYPE III)
LF 72.000 $219.000 $0.000 $150.000
Totals: $6,433,113.465 $5,859,952.500 $7,547,889.985