PREPARING ROW
|
STA
|
103.000
|
$2,000.000
|
$7,500.000
|
$1,500.000
|
$6,000.000
|
$1,500.000
|
|
|
REMOV CONC (PAV)
|
SY
|
2,914.000
|
$14.000
|
$10.000
|
$13.000
|
$18.000
|
$14.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
1,291.000
|
$20.000
|
$10.000
|
$9.000
|
$33.000
|
$23.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
382.000
|
$31.000
|
$10.000
|
$10.000
|
$26.000
|
$26.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
17,545.000
|
$40.000
|
$2.500
|
$5.000
|
$5.000
|
$5.000
|
|
|
REMOV CONC (GUTTER)
|
LF
|
279.000
|
$10.000
|
$5.000
|
$11.000
|
$16.000
|
$13.000
|
|
|
REMOV CONC (MISC)
|
SY
|
6.000
|
$11.000
|
$150.000
|
$490.000
|
$150.000
|
$10.000
|
|
|
RMV (8"-22") TRT/UNTRT BASE & ASPH PAV
|
SY
|
95,595.000
|
$13.000
|
$3.000
|
$8.000
|
$3.250
|
$8.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
6,070.000
|
$6.000
|
$8.000
|
$13.000
|
$30.000
|
$21.300
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
419.000
|
$33.000
|
$8.000
|
$6.000
|
$160.000
|
$31.000
|
|
|
BACKFILL (TY A)
|
STA
|
15.000
|
$200.000
|
$2,500.000
|
$214.000
|
$975.000
|
$1,300.000
|
|
|
FURN & PLACE TOPSOIL (VEH)
|
CY
|
50.000
|
$54.000
|
$15.000
|
$50.000
|
$35.000
|
$25.000
|
|
|
HYDRO MULCH SEED (PERM_URBAN_CLAY)
|
SY
|
27,066.000
|
$0.650
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
27,066.000
|
$0.440
|
$0.400
|
$0.400
|
$0.450
|
$0.450
|
|
|
VEGETATIVE WATERING
|
TGL
|
587.000
|
$14.570
|
$35.000
|
$40.000
|
$35.000
|
$25.570
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
1,298.000
|
$5.470
|
$1.000
|
$30.000
|
$1.000
|
$24.750
|
|
|
PROOF ROLLING
|
HR
|
1.400
|
$114.720
|
$100.000
|
$45.000
|
$85.000
|
$200.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
|
CY
|
16,140.000
|
$37.000
|
$49.000
|
$60.000
|
$38.000
|
$65.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
4,220.000
|
$1.500
|
$3.000
|
$3.000
|
$2.550
|
$3.000
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
2,266.000
|
$260.000
|
$225.000
|
$325.000
|
$260.000
|
$400.000
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
91,540.000
|
$3.500
|
$2.500
|
$2.000
|
$4.250
|
$6.000
|
|
|
CEMENT
|
TON
|
1,036.000
|
$200.000
|
$199.000
|
$175.000
|
$220.000
|
$283.000
|
|
|
CEMENT TRT (NEW BASE)(6")
|
SY
|
87,320.000
|
$5.000
|
$2.220
|
$3.000
|
$2.580
|
$3.950
|
|
|
CEMENT TRT (NEW BASE)(14")
|
SY
|
4,082.000
|
$7.000
|
$5.000
|
$4.000
|
$6.000
|
$8.500
|
|
|
SALV,HAUL & STKPL RCL ASPH PV(3"TO 6")
|
SY
|
86,276.000
|
$3.000
|
$2.000
|
$4.000
|
$3.350
|
$3.000
|
|
|
SALV,HAUL & STKPL RCL APH PV(3"TO 8")
|
SY
|
7,783.000
|
$3.000
|
$2.500
|
$5.000
|
$4.800
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
19,608.000
|
$6.000
|
$5.000
|
$6.000
|
$5.000
|
$6.500
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
13,986.000
|
$120.000
|
$110.000
|
$100.000
|
$107.000
|
$100.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
568.000
|
$125.000
|
$150.000
|
$110.000
|
$135.000
|
$189.100
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
447.000
|
$150.000
|
$150.000
|
$125.000
|
$135.000
|
$232.160
|
|
|
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
|
TON
|
1,478.000
|
$154.000
|
$150.000
|
$140.000
|
$145.000
|
$198.000
|
|
|
PLANE & TEXT ASPH CONC PAV(1.5")
|
SY
|
14,401.000
|
$1.000
|
$1.500
|
$2.000
|
$4.000
|
$2.150
|
|
|
CONC PVMT (CRCP) (12")
|
SY
|
79,537.000
|
$110.000
|
$107.600
|
$131.150
|
$140.000
|
$142.000
|
|
|
CONC PVMT(TRANSITION SLAB) (12")
|
SY
|
2,084.000
|
$350.000
|
$140.000
|
$141.000
|
$160.000
|
$50.000
|
|
|
CONC PVMT (CRCP)(FAST TRK) (15")
|
SY
|
4,622.000
|
$130.000
|
$225.000
|
$165.000
|
$210.000
|
$180.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
110.000
|
$3.000
|
$10.000
|
$21.000
|
$1.000
|
$22.160
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
48.000
|
$200.000
|
$156.080
|
$156.000
|
$140.000
|
$215.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
75.000
|
$310.000
|
$364.180
|
$364.000
|
$320.000
|
$370.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
384.000
|
$113.000
|
$90.000
|
$80.000
|
$100.000
|
$80.000
|
|
|
INLET (STAGE II)(PCU)(5FT)(NONE)
|
EA
|
37.000
|
$3,500.000
|
$2,900.000
|
$3,090.000
|
$6,500.000
|
$3,851.600
|
|
|
INLET (STAGE II)(PCO)(5FT)(NONE)
|
EA
|
3.000
|
$3,500.000
|
$2,900.000
|
$2,850.000
|
$6,200.000
|
$3,701.630
|
|
|
INLET (STAGE II)(PCO)(5FT)(LEFT)
|
EA
|
1.000
|
$3,500.000
|
$3,500.000
|
$3,170.000
|
$6,500.000
|
$5,044.090
|
|
|
INLET (STAGE II)(PCO)(5FT)(RIGHT)
|
EA
|
2.000
|
$3,500.000
|
$3,500.000
|
$3,170.000
|
$6,500.000
|
$5,733.520
|
|
|
INLET(STAGE II)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$3,500.000
|
$3,750.000
|
$3,490.000
|
$6,700.000
|
$7,563.540
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,504.000
|
$2,000.000
|
$1,340.000
|
$1,500.000
|
$1,888.310
|
|
|
ADJUSTING MANHOLES
|
EA
|
12.000
|
$2,290.000
|
$3,500.000
|
$3,740.000
|
$5,500.000
|
$1,403.080
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$5,000.000
|
$7,500.000
|
$4,480.000
|
$2,400.000
|
$1,969.330
|
|
|
REMOV STR (INLET)
|
EA
|
44.000
|
$900.000
|
$500.000
|
$1,480.000
|
$3,000.000
|
$299.700
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$922.000
|
$500.000
|
$778.000
|
$1,000.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
281.000
|
$13.000
|
$25.000
|
$22.000
|
$50.000
|
$25.690
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,080,398.080
|
$1,900,000.000
|
$2,100,000.000
|
$1,850,000.000
|
$1,550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$7,500.000
|
$1,500.000
|
$6,000.000
|
$7,000.000
|
$17,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$3,800.000
|
$15,000.000
|
$317.000
|
$9,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
410.000
|
$50.000
|
$1.000
|
$10.000
|
$30.000
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
410.000
|
$200.000
|
$10.000
|
$15.000
|
$0.010
|
$68.580
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
60.000
|
$60.000
|
$60.000
|
$63.000
|
$60.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$16.000
|
$25.000
|
$45.000
|
$25.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
3,198.000
|
$37.000
|
$25.000
|
$12.000
|
$12.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,198.000
|
$11.000
|
$2.000
|
$4.000
|
$8.000
|
$15.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$175.000
|
$150.000
|
$205.000
|
$125.000
|
$80.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
242.000
|
$4.000
|
$10.000
|
$7.000
|
$10.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
242.000
|
$2.000
|
$5.000
|
$2.000
|
$5.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
660.000
|
$4.000
|
$7.500
|
$6.000
|
$10.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
211.000
|
$6.000
|
$7.500
|
$6.000
|
$15.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
871.000
|
$2.000
|
$2.000
|
$1.000
|
$5.000
|
$1.350
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,313.000
|
$50.000
|
$60.000
|
$45.000
|
$65.000
|
$64.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
7,920.000
|
$40.000
|
$25.000
|
$76.000
|
$28.000
|
$70.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,520.000
|
$15.000
|
$20.000
|
$37.000
|
$33.000
|
$98.460
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$15.000
|
$20.000
|
$41.000
|
$33.000
|
$96.380
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
31,140.000
|
$8.000
|
$5.000
|
$8.000
|
$4.350
|
$4.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,900.000
|
$1.000
|
$4.000
|
$10.000
|
$7.250
|
$6.980
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
540.000
|
$1.000
|
$5.000
|
$12.000
|
$4.000
|
$7.900
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
7,920.000
|
$8.000
|
$5.000
|
$14.000
|
$8.000
|
$7.740
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,520.000
|
$5.000
|
$5.000
|
$14.000
|
$9.000
|
$8.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$5.000
|
$5.000
|
$41.000
|
$7.000
|
$9.790
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
14,240.000
|
$30.000
|
$15.000
|
$22.000
|
$14.500
|
$40.040
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,410.000
|
$50.000
|
$20.000
|
$20.000
|
$16.500
|
$42.040
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,897.000
|
$159.000
|
$150.000
|
$90.000
|
$80.000
|
$96.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
862.000
|
$60.000
|
$85.000
|
$40.000
|
$80.000
|
$98.380
|
|
|
CONC SIDEWALKS (4")
|
SY
|
366.000
|
$104.000
|
$85.000
|
$75.000
|
$75.000
|
$83.810
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$3,584.000
|
$2,500.000
|
$2,670.000
|
$1,900.000
|
$4,380.090
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
57.000
|
$225.000
|
$1,500.000
|
$1,100.000
|
$1,400.000
|
$1,460.740
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
16.000
|
$590.000
|
$850.000
|
$689.000
|
$750.000
|
$767.690
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$15,000.000
|
$9,000.000
|
$6,660.000
|
$7,600.000
|
$8,071.410
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
9.000
|
$630.000
|
$210.000
|
$711.000
|
$300.000
|
$319.870
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
30.000
|
$22.000
|
$20.810
|
$21.000
|
$18.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
325.000
|
$15.000
|
$25.440
|
$25.000
|
$22.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
90.000
|
$33.000
|
$32.370
|
$32.000
|
$28.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
284.000
|
$30.000
|
$31.220
|
$31.000
|
$27.000
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
310.000
|
$55.000
|
$43.930
|
$44.000
|
$40.000
|
$45.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
785.000
|
$2.000
|
$2.430
|
$2.000
|
$2.200
|
$1.400
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
65.000
|
$2.000
|
$2.540
|
$3.000
|
$2.200
|
$1.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
142.000
|
$2.200
|
$2.890
|
$3.000
|
$2.500
|
$1.950
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,110.000
|
$3.400
|
$3.350
|
$3.000
|
$2.900
|
$2.400
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$1,500.000
|
$1,028.970
|
$1,030.000
|
$900.000
|
$1,105.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$1,100.000
|
$1,271.760
|
$1,270.000
|
$1,100.000
|
$1,105.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
1,310.000
|
$3.000
|
$2.890
|
$3.000
|
$2.500
|
$5.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
1.000
|
$2,650.000
|
$3,237.200
|
$3,240.000
|
$2,800.000
|
$2,700.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
117.000
|
$31.000
|
$21.000
|
$18.000
|
$24.000
|
$25.110
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
27.000
|
$817.000
|
$785.000
|
$670.000
|
$675.000
|
$719.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
5.000
|
$950.000
|
$925.000
|
$629.000
|
$705.000
|
$751.700
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$978.000
|
$950.000
|
$736.000
|
$870.000
|
$922.290
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,000.000
|
$1,050.000
|
$803.000
|
$1,010.000
|
$1,076.900
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,003.000
|
$1,200.000
|
$778.000
|
$1,025.000
|
$1,092.890
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
5.000
|
$1,383.000
|
$1,350.000
|
$842.000
|
$1,205.000
|
$1,284.810
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
44.000
|
$110.000
|
$75.000
|
$210.000
|
$80.000
|
$85.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
712.000
|
$1.000
|
$3.810
|
$7.000
|
$4.000
|
$3.900
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
941.000
|
$1.000
|
$3.810
|
$7.000
|
$5.000
|
$4.200
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
14,155.000
|
$0.500
|
$1.200
|
$0.400
|
$1.300
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
510.000
|
$0.700
|
$2.200
|
$0.350
|
$2.500
|
$2.400
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
80,720.000
|
$0.500
|
$1.100
|
$0.350
|
$1.250
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
639.000
|
$1.000
|
$4.210
|
$1.000
|
$4.500
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
640.000
|
$6.000
|
$14.420
|
$16.000
|
$14.650
|
$14.600
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$200.000
|
$280.450
|
$250.000
|
$300.000
|
$290.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
6.000
|
$300.000
|
$290.470
|
$250.000
|
$500.000
|
$290.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
15.000
|
$130.000
|
$48.080
|
$250.000
|
$52.000
|
$52.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
2,984.000
|
$1.000
|
$1.100
|
$0.400
|
$1.200
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
111,220.000
|
$0.500
|
$1.100
|
$0.400
|
$1.200
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
463.000
|
$1.180
|
$3.810
|
$2.000
|
$5.000
|
$4.200
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
298.000
|
$2.000
|
$6.410
|
$6.000
|
$7.000
|
$6.900
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
18,201.000
|
$2.000
|
$0.720
|
$1.000
|
$0.800
|
$0.780
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
4,300.000
|
$3.000
|
$0.850
|
$1.000
|
$1.000
|
$0.950
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
2,684.000
|
$4.000
|
$3.810
|
$2.000
|
$4.000
|
$3.900
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
26.000
|
$5.000
|
$8.810
|
$6.000
|
$9.000
|
$8.800
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
285.000
|
$8.000
|
$16.830
|
$12.000
|
$17.000
|
$16.900
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
18,490.000
|
$3.000
|
$1.100
|
$1.000
|
$1.200
|
$1.200
|
|
RE PM TY III (Y)(6")(BRK)
|
LF
|
3,774.000
|
$3.000
|
$1.100
|
$1.000
|
$1.200
|
$1.200
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
6,442.000
|
$1.000
|
$1.600
|
$2.000
|
$1.800
|
$1.800
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
360.000
|
$1.000
|
$1.600
|
$2.000
|
$1.800
|
$1.800
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
526.000
|
$1.000
|
$1.200
|
$1.000
|
$1.500
|
$1.400
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
5,262.000
|
$1.000
|
$1.200
|
$1.000
|
$1.500
|
$1.400
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
4,256.000
|
$9.000
|
$8.810
|
$1.000
|
$1.500
|
$9.800
|
|
PREFAB PM TY C (W)(24")(SLD)CONTRAST
|
LF
|
496.000
|
$40.000
|
$35.260
|
$18.000
|
$10.000
|
$9.800
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
22.000
|
$230.000
|
$290.470
|
$285.000
|
$325.000
|
$320.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
14.000
|
$280.000
|
$290.470
|
$285.000
|
$325.000
|
$320.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
401.000
|
$4.440
|
$4.410
|
$12.000
|
$5.000
|
$4.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
824.000
|
$4.400
|
$4.410
|
$12.000
|
$5.000
|
$4.800
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
77,644.000
|
$0.500
|
$0.800
|
$1.000
|
$1.000
|
$0.950
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,819.000
|
$1.000
|
$2.000
|
$1.000
|
$2.000
|
$2.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,200.000
|
$1.000
|
$4.010
|
$10.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
184.000
|
$2.000
|
$8.010
|
$10.000
|
$8.000
|
$8.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
18.000
|
$1.000
|
$100.160
|
$110.000
|
$100.000
|
$100.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
11.000
|
$1.000
|
$100.160
|
$110.000
|
$100.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
45,501.000
|
$0.740
|
$0.300
|
$0.400
|
$0.350
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,684.000
|
$0.530
|
$0.600
|
$1.000
|
$0.700
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
26.000
|
$2.580
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
686.000
|
$3.000
|
$2.000
|
$4.000
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
21.000
|
$68.000
|
$20.030
|
$22.000
|
$25.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$69.000
|
$20.030
|
$42.000
|
$25.000
|
$20.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$2,700.000
|
$2,890.360
|
$2,890.000
|
$2,500.000
|
$3,600.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$20,000.000
|
$7,514.930
|
$7,510.000
|
$6,500.000
|
$33,100.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$2,620.000
|
$3,179.390
|
$3,180.000
|
$2,800.000
|
$5,500.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$20,000.000
|
$12,139.500
|
$12,140.000
|
$10,500.000
|
$19,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$285.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$285.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$360.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$285.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$360.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$285.000
|
$364.190
|
$364.000
|
$320.000
|
$245.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$600.000
|
$653.220
|
$653.000
|
$575.000
|
$600.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
8.000
|
$140.000
|
$172.270
|
$172.000
|
$150.000
|
$140.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
4.000
|
$170.000
|
$254.350
|
$254.000
|
$220.000
|
$200.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
1,655.000
|
$2.000
|
$2.490
|
$2.000
|
$2.200
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
5,840.000
|
$2.700
|
$3.350
|
$3.000
|
$3.000
|
$2.350
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,070.000
|
$3.200
|
$4.160
|
$4.000
|
$4.000
|
$2.900
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
5.000
|
$10,800.000
|
$12,775.370
|
$12,780.000
|
$11,100.000
|
$9,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$1,400.000
|
$1,386.220
|
$1,390.000
|
$1,200.000
|
$1,105.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$850.000
|
$1,092.560
|
$1,090.000
|
$950.000
|
$850.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,600.000
|
$4,092.740
|
$4,090.000
|
$3,550.000
|
$3,725.000
|
|
|
INSTALL OF FOUNDATION (PEDESTAL POLE)
|
LF
|
1.000
|
$2,000.000
|
$1,578.130
|
$1,580.000
|
$1,375.000
|
$4,125.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
4,506.000
|
$5.000
|
$5.000
|
$3.000
|
$11.000
|
$12.590
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
212.000
|
$16.000
|
$25.000
|
$21.000
|
$35.000
|
$15.020
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
458.000
|
$25.000
|
$25.000
|
$14.000
|
$45.000
|
$20.530
|
|
|
BONDING COURSE
|
GAL
|
1,838.000
|
$3.500
|
$5.000
|
$8.000
|
$3.000
|
$10.360
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
26.000
|
$120.000
|
$100.000
|
$95.000
|
$70.000
|
$108.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
200.000
|
$50.000
|
$100.000
|
$115.000
|
$145.000
|
$148.330
|
|
|
CEM STABIL BKFL
|
CY
|
67.000
|
$124.000
|
$125.000
|
$91.000
|
$120.000
|
$90.470
|
|
|
RC LOW HEAD PRSSR PIPE (CL III)(42")
|
LF
|
107.000
|
$300.000
|
$450.000
|
$293.000
|
$900.000
|
$409.890
|
|
|
RVDS (PRESENCE AND ADVANCE DETECTION)
|
EA
|
4.000
|
$11,000.000
|
$9,364.750
|
$9,360.000
|
$8,100.000
|
$9,600.000
|
|
|
LOOP INSTALLATION
|
LF
|
240.000
|
$30.000
|
$13.870
|
$14.000
|
$12.000
|
$14.000
|
|
|
SENSOR INSTALLATION
|
EA
|
4.000
|
$100.000
|
$2,485.710
|
$2,490.000
|
$2,150.000
|
$1,155.000
|
|
Totals: |
$22,884,378.898
|
$20,273,402.950
|
$22,831,807.150
|
$23,494,326.300
|
$25,226,616.510
|