HIDALGO CR (0921-02-445)

Items: 49

County: HIDALGO
Length: N/A
Highway: CR
District: PHARR
Control Number: 0921-02-445
DBE Goal: N/A
Project: BR 2021(257)
Guaranty: N/A
Time: 248 WORKING DAYS
Engineer's Estimate: $1,324,613.08
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JESUS NORIEGA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,324,613.08
$1,554,168.79
Over/Under Est: 17.33% $229,555.71
Over/Under Est: 25.08% $332,247.36
Amt Left: 6.61% $102,691.65
$1,990,077.76
Over/Under Est: 50.24% $665,464.68
Amt Left: 28.05% $435,908.97
Delta: -20.11% -$333,217.32

Bid Items & Bid Tabulations

49 Total 0 of 49
HIDALGO  |  CR  |  PHARR  |  0921-02-445  |  08/04/2022  |  $1,324,613.08  |  BR 2021(257)  |  BRIDGE REPL  |  248 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
IOC COMPANY, LLC
PREPARING ROW
STA 6.000 $2,500.000 $1,200.000 $2,000.000 $5,500.000
EXCAVATION (ROADWAY)
CY 712.300 $10.000 $20.000 $20.000 $30.000
EXCAVATION (CHANNEL)
CY 300.400 $25.000 $20.000 $25.000 $75.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 18.200 $19.710 $300.000 $30.000 $150.000
BLADING
STA 5.200 $250.000 $1,800.000 $100.000 $3,000.000
FURNISHING AND PLACING TOPSOIL
CY 40.000 $28.750 $200.000 $35.000 $100.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 889.000 $0.300 $1.300 $4.000 $0.500
DRILL SEEDING (TEMP) (WARM)
SY 889.000 $0.170 $1.150 $4.000 $0.500
VEGETATIVE WATERING
MG 200.000 $33.280 $90.000 $50.000 $80.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 889.000 $0.970 $3.100 $4.000 $1.640
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 454.100 $161.000 $45.000 $115.000 $127.000
CEMENT
TON 47.400 $180.560 $220.000 $250.000 $335.000
CEMENT TREAT (NEW BASE)(11")
SY 1,395.400 $4.000 $32.000 $7.000 $30.000
PRIME COAT (MC-30)
GAL 279.080 $6.000 $13.000 $15.000 $20.000
ASPH (SPG 73-19)
GAL 446.600 $4.000 $45.000 $12.000 $25.000
AGGR (TY-D GR-4P)(SAC-B)
CY 11.700 $150.000 $165.000 $420.000 $1,400.000
CEM STABIL BKFL
CY 73.000 $85.000 $120.000 $135.000 $180.000
DRILL SHAFT (24 IN)
LF 800.000 $205.270 $290.000 $450.000 $308.030
CL C CONC (ABUT)
CY 48.000 $1,500.000 $1,800.000 $1,150.000 $2,000.000
CL C CONC (CAP)
CY 19.000 $1,500.000 $2,000.000 $1,250.000 $2,750.000
CL C CONC (COLUMN)
CY 12.000 $968.000 $2,400.000 $1,450.000 $3,500.000
REINF CONC SLAB (SLAB BEAM)
SF 4,338.000 $24.770 $22.000 $22.500 $45.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,062.000 $194.330 $180.000 $220.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 204.400 $165.210 $150.000 $195.000 $300.000
RAIL (TY T223)
LF 288.000 $130.000 $140.000 $125.000 $225.000
RC PIPE (CL III)(18 IN)
LF 70.000 $60.000 $80.000 $115.000 $135.000
RC PIPE (CL III)(24 IN)
LF 256.000 $90.730 $95.000 $115.000 $175.000
INLET (COMPL)(POD)(SFG)(3FTX3FT)
EA 5.000 $7,390.000 $5,500.000 $7,600.000 $5,000.000
REMOV STR (PIPE)
LF 210.000 $5.620 $30.000 $30.000 $25.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $35,000.000 $50,000.000 $27,500.000 $50,000.000
MOBILIZATION
LS 1.000 $50,000.000 $65,000.000 $108,392.740 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,500.000 $2,000.000 $1,250.000 $600.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $27.250 $40.000 $50.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.110 $15.000 $15.000 $10.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 80.000 $89.460 $100.000 $100.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,013.000 $3.310 $7.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,013.000 $1.300 $2.000 $1.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 75.000 $6.070 $7.000 $7.000 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 75.000 $1.420 $3.000 $2.000 $1.150
DRIVEWAYS (ACP)
SY 25.700 $38.230 $460.000 $285.000 $200.000
DRIVEWAYS (BASE)
SY 260.500 $23.300 $50.000 $65.000 $80.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 8.000 $26,900.000 $30,000.000 $32,000.000 $30,600.000
REMOVE SM RD SN SUP&AM
EA 4.000 $78.750 $90.000 $100.000 $115.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 5.000 $59.470 $100.000 $85.000 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,040.000 $0.410 $3.000 $3.000 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,040.000 $0.400 $3.000 $3.000 $3.000
REFL PAV MRKR TY II-A-A
EA 28.000 $4.000 $8.000 $8.000 $8.000
PAV SURF PREP FOR MRK (4")
LF 2,080.000 $0.160 $1.000 $1.000 $1.000
D-GR HMA TY-D SAC-A PG76-22
TON 238.700 $170.000 $280.000 $250.000 $200.000
Totals: $1,324,613.081 $1,554,168.790 $1,656,860.440 $1,990,077.760