Job Info for 0697-02-039

County: HENDERSON Highway: SH 334 Date: 11/06/2018 (6 years ago) Engineer's Estimate: $40,593,999 Control Number: 0697-02-039
Project: STP 2019(242) District: TYLER Time: 0 X Type: RECONST BRGS, GR, BS, SURF, PVT MRK

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $40,593,998.57
AUSTIN BRIDGE & ROAD SERVICES, LP   $43,069,729.22 1
6.1% | $2,475,730.65
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $43,293,722.66 2
6.65% | $2,699,724.09
0.52% | $223,993.44
JAMES CONSTRUCTION GROUP, L.L.C.   $47,378,061.55 3
16.71% | $6,784,062.98
10% | $4,308,332.33
9.43% | $4,084,338.89
LONGVIEW BRIDGE AND ROAD, LTD.   $50,470,615.95 4
24.33% | $9,876,617.38
17.18% | $7,400,886.73
6.53% | $3,092,554.40
EAST TEXAS BRIDGE, INC.   $59,385,223.86 5
46.29% | $18,791,225.29
37.88% | $16,315,494.64
17.66% | $8,914,607.91

Bid Items

Items: 120, 0 filtered
HENDERSON SH 334  |  TYLER  |  0697-02-039  |  11/06/2018  |  $40,593,999  |  STP 2019(242)  |  RECON BRGS, GR, BS, SURF, PVT MRK  |  0 X
Item code Description Unit Quantity Engineer's Estimate AUSTIN BRIDGE & ROAD SERVICES, LP JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY JAMES CONSTRUCTION GROUP, L.L.C. LONGVIEW BRIDGE AND ROAD, LTD. EAST TEXAS BRIDGE, INC.
100 6002 PREPARING ROW STA 80.000 $1,400.000 $15,000.000 $52,500.000 $27,272.160 $20,000.000 $25,000.000
110 6001 EXCAVATION (ROADWAY) CY 10,411.000 $10.000 $8.000 $6.500 $25.510 $11.500 $9.000
110 6003 EXCAVATION (SPECIAL) CY 1,895.000 $20.000 $20.000 $7.500 $22.900 $18.250 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 39,203.000 $9.250 $35.000 $10.000 $22.670 $13.500 $28.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 23,102.000 $1.000 $3.000 $1.000 $4.640 $2.500 $1.500
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 10,878.000 $0.800 $0.630 $1.000 $0.950 $1.050 $1.000
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 10,877.000 $0.800 $0.630 $1.000 $0.940 $1.050 $1.000
164 6069 BOND FBR MTRX SEED(PERM)(RURAL)(CLAY) AC 0.500 $30,000.000 $3,328.000 $10,000.000 $9,441.180 $10,500.000 $8,000.000
168 6001 VEGETATIVE WATERING MG 478.890 $10.000 $25.000 $50.000 $47.220 $4.000 $15.000
260 6001 LIME (HYDRATED LIME (DRY)) TON 324.000 $175.000 $180.000 $200.000 $225.990 $220.000 $225.000
275 6001 CEMENT TON 324.000 $150.000 $150.000 $130.000 $176.430 $190.000 $165.000
316 6406 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) GAL 22,855.000 $3.000 $4.500 $4.000 $5.530 $4.500 $5.000
316 6407 AGGR (TY-PD GR-3 OR TY-PL GR-3) CY 544.000 $135.000 $170.000 $120.000 $218.330 $200.000 $145.000
344 6034 SUPERPAVE MIXTURES SP-C PG64-22 TON 10,771.000 $95.000 $85.000 $100.000 $96.320 $122.000 $100.000
344 6119 SUPERPAVE MIXTURES SP-D SAC-A PG70-22 TON 4,480.000 $98.000 $90.000 $100.000 $98.140 $110.000 $105.000
344 6168 SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP) TON 3,005.000 $84.000 $91.000 $100.000 $83.530 $110.000 $125.000
360 6003 CONC PVMT (CONT REINF - CRCP) (9") SY 10,185.000 $50.000 $75.000 $60.000 $87.450 $98.000 $88.000
400 6005 CEM STABIL BKFL CY 202.900 $200.000 $160.000 $112.000 $201.720 $250.000 $250.000
403 6001 TEMPORARY SPL SHORING SF 11,960.000 $30.000 $24.000 $35.000 $20.310 $40.000 $45.000
407 6001 SHEET PILING (PZ - 27) SF 222,403.500 $50.000 $42.000 $39.250 $40.650 $41.000 $60.000
407 6028 SHEET PILING (PZC - 39) SF 15,812.400 $50.000 $50.000 $40.000 $95.730 $65.000 $130.000
416 6003 DRILL SHAFT (30 IN) LF 840.000 $160.000 $150.000 $155.000 $235.920 $175.000 $200.000
416 6004 DRILL SHAFT (36 IN) LF 3,783.000 $250.000 $500.000 $207.990 $517.310 $595.000 $600.000
416 6006 DRILL SHAFT (48 IN) LF 7,815.000 $350.000 $600.000 $560.000 $579.790 $675.000 $750.000
420 6014 CL C CONC (ABUT)(HPC) CY 72.200 $1,000.000 $1,200.000 $850.000 $1,035.170 $1,050.000 $1,200.000
420 6030 CL C CONC (CAP)(HPC) CY 853.500 $1,100.000 $1,200.000 $1,150.000 $1,330.690 $1,300.000 $1,200.000
420 6038 CL C CONC (COLUMN)(HPC) CY 235.000 $1,100.000 $1,200.000 $1,100.000 $1,473.670 $1,725.000 $1,200.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 244.600 $600.000 $400.000 $400.000 $580.640 $615.000 $800.000
420 6159 CL C CONC(COPING)(HPC) LF 4,458.000 $310.000 $115.000 $150.000 $160.550 $150.000 $150.000
422 6001 REINF CONC SLAB SF 195,286.000 $22.000 $17.000 $20.000 $21.660 $21.750 $20.000
422 6015 APPROACH SLAB CY 124.000 $840.000 $500.000 $452.000 $666.800 $595.000 $500.000
423 6015 RETAINING WALL (SPECIAL) SF 1,240.000 $90.000 $85.000 $100.000 $91.230 $300.000 $200.000
425 6036 PRESTR CONC GIRDER (TX34) LF 4,770.030 $146.000 $125.000 $134.000 $159.970 $155.000 $175.000
425 6039 PRESTR CONC GIRDER (TX54) LF 19,530.030 $140.000 $125.000 $140.000 $168.630 $155.000 $175.000
432 6001 RIPRAP (CONC)(4 IN) CY 13.900 $400.000 $650.000 $350.000 $714.880 $600.000 $600.000
432 6023 RIPRAP (STONE COMMON)(DRY)(8 IN) CY 30.000 $125.000 $155.000 $140.000 $226.440 $275.000 $140.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 9,829.000 $90.000 $140.000 $105.000 $134.240 $200.000 $140.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 163.600 $525.000 $550.000 $450.000 $790.360 $560.000 $500.000
450 6001 RAIL (TY T1F) LF 13,234.300 $135.000 $135.000 $122.000 $162.300 $135.000 $215.000
450 6023 RAIL (TY SSTR) LF 2,097.000 $60.000 $55.000 $45.000 $65.300 $90.000 $90.000
454 6001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 694.000 $120.000 $135.000 $75.000 $96.590 $78.000 $85.000
464 6003 RC PIPE (CL III)(18 IN) LF 2,017.000 $50.000 $60.000 $50.000 $65.250 $46.000 $40.000
465 6007 JCTBOX(COMPL)(PJB)(3FTX5FT) EA 1.000 $5,000.000 $3,800.000 $4,000.000 $3,556.180 $5,000.000 $5,000.000
465 6175 INLET (COMPL)(CURB)(TY C) EA 4.000 $6,000.000 $4,200.000 $4,500.000 $4,703.930 $6,500.000 $5,000.000
465 6366 INLET (COMPL)(CURB)(3FT)(NONE) EA 1.000 $3,800.000 $3,700.000 $4,500.000 $3,556.180 $6,500.000 $5,000.000
465 6367 INLET (COMPL)(CURB)(3FT)(LEFT) EA 3.000 $3,000.000 $4,300.000 $4,300.000 $3,557.350 $7,500.000 $5,000.000
465 6369 INLET (COMPL)(CURB)(3FT)(RIGHT) EA 4.000 $3,000.000 $4,300.000 $4,500.000 $3,557.060 $7,500.000 $5,000.000
465 6371 INLET (COMPL)(CURB)(3FT)(BOTH) EA 1.000 $4,500.000 $5,200.000 $6,500.000 $3,556.180 $10,000.000 $5,000.000
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 1.000 $800.000 $1,200.000 $890.000 $1,769.480 $750.000 $500.000
467 6359 SET (TY II) (18 IN) (RCP) (4: 1) (P) EA 18.000 $1,140.000 $1,400.000 $946.000 $1,837.320 $750.000 $500.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1.000 $650.000 $1,600.000 $1,000.000 $1,905.190 $800.000 $600.000
481 6022 PIPE (PVC) (SCH 80) (4 IN) LF 952.400 $50.000 $25.000 $111.000 $32.350 $40.000 $20.000
496 6002 REMOV STR (INLET) EA 4.000 $1,550.000 $750.000 $610.000 $913.420 $1,500.000 $1,000.000
496 6004 REMOV STR (SET) EA 24.000 $400.000 $450.000 $500.000 $913.420 $350.000 $500.000
496 6016 REMOV STR (PIPE) EA 21.000 $450.000 $850.000 $770.000 $569.120 $275.000 $500.000
496 6079 REMOVE STR (PILING) EA 1.000 $200.000 $13,500.000 $5,000.000 $7,307.390 $14,000.000 $30,000.000
500 6001 MOBILIZATION LS 1.000 $3,492,998.960 $4,500,000.000 $4,255,000.000 $4,500,000.000 $5,000,000.000 $5,000,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 17.000 $6,500.000 $25,000.000 $9,000.000 $18,561.240 $3,600.000 $150,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 255.000 $30.000 $34.000 $35.000 $33.960 $38.000 $40.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 255.000 $7.000 $10.000 $18.000 $17.530 $19.250 $8.000
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 50.000 $90.000 $135.000 $120.000 $66.990 $250.000 $225.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 5,980.000 $3.000 $2.000 $3.000 $3.010 $3.300 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 5,980.000 $0.750 $0.500 $1.000 $0.570 $0.650 $1.500
506 6046 TRACKHOE WORK (EROSION & SEDMT CONT) HR 50.000 $125.000 $275.000 $300.000 $152.890 $250.000 $225.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 2,430.000 $80.000 $60.000 $71.000 $91.880 $90.000 $100.000
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 2,430.000 $11.000 $5.000 $7.000 $11.030 $16.000 $20.000
529 6002 CONC CURB (TY II) LF 2,153.000 $15.000 $15.000 $20.000 $7.910 $14.000 $15.000
529 6008 CONC CURB & GUTTER (TY II) LF 1,513.000 $20.000 $25.000 $30.000 $25.170 $33.000 $30.000
530 6005 DRIVEWAYS (ACP) SY 1,687.000 $30.000 $45.000 $65.000 $41.230 $46.000 $45.000
530 6017 DRIVEWAYS (CONC) (HES) SY 2,002.000 $100.000 $100.000 $100.000 $72.390 $125.000 $95.000
531 6001 CONC SIDEWALKS (4") SY 612.000 $60.000 $70.000 $55.000 $54.380 $70.000 $65.000
531 6013 CURB RAMPS (TY 10) EA 29.000 $1,600.000 $2,000.000 $2,000.000 $1,980.960 $2,800.000 $2,200.000
531 6016 CURB RAMPS (TY 21) EA 2.000 $2,000.000 $2,100.000 $2,000.000 $2,082.750 $3,200.000 $4,000.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 5,201.000 $22.000 $15.500 $18.000 $20.000 $22.000 $22.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 11.000 $1,700.000 $1,364.000 $1,390.000 $1,548.000 $1,500.000 $1,800.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 11.000 $1,250.000 $893.000 $975.000 $875.000 $1,300.000 $1,300.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 9,509.000 $4.250 $1.350 $2.000 $2.500 $2.200 $3.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 13.000 $260.000 $200.000 $90.000 $225.000 $165.000 $200.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 9.000 $300.000 $490.000 $100.000 $225.000 $165.000 $200.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 $2,650.000 $2,215.000 $2,550.000 $2,375.000 $2,800.000 $2,800.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 5.000 $300.000 $490.000 $225.000 $225.000 $220.000 $300.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 9.000 $12,300.000 $9,000.000 $15,000.000 $27,700.000 $32,000.000 $26,000.000
545 6004 CRASH CUSH ATTEN (STKPL) EA 4.000 $1,200.000 $1,000.000 $1,000.000 $3,250.000 $1,100.000 $2,000.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 7.000 $300.000 $250.000 $300.000 $250.000 $275.000 $400.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $700.000 $500.000 $740.000 $500.000 $550.000 $700.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 27.000 $400.000 $375.000 $470.000 $375.000 $425.000 $500.000
644 6076 REMOVE SM RD SN SUP&AM EA 15.000 $110.000 $65.000 $126.000 $65.000 $70.000 $125.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 142.000 $27.000 $20.000 $21.000 $20.000 $16.500 $30.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 29.000 $60.000 $45.000 $52.000 $45.000 $50.000 $55.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 5.000 $12.000 $10.000 $10.000 $10.000 $55.000 $100.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 79.000 $35.000 $25.000 $44.000 $25.000 $22.000 $30.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 16,189.000 $0.160 $0.240 $0.200 $0.250 $0.280 $0.270
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 44,278.000 $0.180 $0.240 $0.200 $0.250 $0.280 $0.270
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 445.000 $4.250 $3.250 $1.000 $3.000 $3.300 $3.500
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 1,950.000 $3.750 $3.250 $0.300 $3.000 $3.300 $3.500
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 1,332.000 $3.250 $3.000 $0.200 $2.600 $2.850 $3.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 5,332.000 $3.250 $3.000 $1.000 $2.600 $2.850 $3.000
666 6167 REFL PAV MRK TY II (W) 4" (BRK) LF 4,110.000 $0.200 $0.250 $0.500 $0.200 $0.220 $0.220
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 9,146.000 $0.250 $0.200 $0.200 $0.200 $0.220 $0.220
666 6184 REFL PAV MRK TY II (W) (ARROW) EA 2.000 $60.000 $55.000 $500.000 $100.000 $110.000 $110.000
666 6205 REFL PAV MRK TY II (Y) 4" (BRK) LF 1,780.000 $0.350 $0.250 $0.250 $0.200 $0.220 $0.220
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 15,760.000 $0.250 $0.200 $0.200 $0.200 $0.220 $0.220
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 8,320.000 $0.550 $0.480 $0.200 $0.450 $0.500 $0.500
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 19,798.000 $0.300 $0.450 $0.200 $0.420 $0.460 $0.450
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 5,600.000 $0.550 $0.480 $0.200 $0.450 $0.500 $0.500
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 32,710.000 $0.300 $0.450 $0.200 $0.420 $0.460 $0.450
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 8.000 $180.000 $267.000 $150.000 $200.000 $220.000 $250.000
672 6009 REFL PAV MRKR TY II-A-A EA 570.000 $3.000 $3.750 $1.000 $3.200 $3.500 $4.000
672 6010 REFL PAV MRKR TY II-C-R EA 402.000 $4.000 $3.750 $3.000 $3.200 $3.500 $4.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 83,638.000 $0.450 $0.440 $0.300 $0.320 $1.100 $0.750
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 1,060.000 $1.750 $2.000 $0.500 $1.000 $4.000 $3.000
678 6001 PAV SURF PREP FOR MRK (4") LF 30,798.000 $0.200 $0.140 $0.200 $0.100 $0.110 $0.150
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 2.000 $25.000 $55.000 $150.000 $50.000 $55.000 $55.000
800 6001 NO. OF WORKING DAYS $/D 4,500.000 $400.000 $400.000 $400.000 $400.000 $400.000 $350.000
4021 6001 TIP TESTING(DRILL SHAFT) EA 24.000 $10,000.000 $1,500.000 $3,000.000 $2,663.640 $12,000.000 $5,000.000
4027 6001 TEMP CONSTRUCTION ACCESS LS 1.000 $300,000.000 $250,000.000 $350,000.000 $57,665.140 $2,000,000.000 $2,000,000.000
5048 6002 FLOATING TURBIDITY BARRIER(FUR & INST) LF 5,050.000 $30.000 $15.000 $25.000 $53.360 $42.000 $60.000
5048 6003 FLOATING TURBIDITY BARRIER (REMOVE) LF 5,050.000 $10.000 $4.000 $10.000 $3.000 $5.500 $10.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $14,000.000 $7,500.000 $16,500.000 $13,571.390 $18,000.000 $20,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 12.000 $180.000 $750.000 $90.000 $155.960 $55.000 $500.000
Totals: $40,593,998.57 $43,069,729.22 $43,293,722.67 $47,378,061.61 $50,470,615.95 $59,385,223.86