Job Info for 0646-05-027

County: HENDERSON Highway: SH 198 Date: 01/07/2021 (3 years ago) Engineer's Estimate: $26,604,181 Control Number: 0646-05-027
Project: BR 2021(213) District: TYLER Time: 738 WORKING DAYS Type: RPLC BR&APP,C&G,RET WALLS,ACP B&S
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $26,604,181.40
COPASA INC   $30,355,868.31 1
14.1% | $3,751,686.91
J.D. ABRAMS, L.P.   $32,990,955.36 2
24.01% | $6,386,773.96
8.68% | $2,635,087.05
JENSEN CONSTRUCTION COMPANY OF TEXAS   $34,611,841.66 3
30.1% | $8,007,660.26
14.02% | $4,255,973.35
4.91% | $1,620,886.30
PULICE CONSTRUCTION, INC.   $35,656,889.93 4
34.03% | $9,052,708.53
17.46% | $5,301,021.62
3.02% | $1,045,048.27
AUSTIN BRIDGE & ROAD SERVICES, LP   $37,295,019.35 5
40.18% | $10,690,837.95
22.86% | $6,939,151.04
4.59% | $1,638,129.42
RAGLE CONSTRUCTION, INC.   $38,155,320.45 6
43.42% | $11,551,139.05
25.69% | $7,799,452.14
2.31% | $860,301.10
EAST TEXAS BRIDGE, INC.   $39,757,677.70 7
49.44% | $13,153,496.30
30.97% | $9,401,809.39
4.20% | $1,602,357.25
OHL USA, INC.   $46,893,811.54 8
76.26% | $20,289,630.14
54.48% | $16,537,943.23
17.95% | $7,136,133.84
Subcontractor Percentage Amount
ATS DRILLING, INC. 23.49% $7,130,593.47
TEXAS MATERIALS GROUP, INC. 4.63% $1,405,476.70
JE CASEY, LLC 4.30% $1,305,302.34
EPCS ENVIRONMENTAL LLC 3.62% $1,098,882.43
ADVANCED EXCAVATION SOLUTIONS LLC 3.08% $934,960.74
JB PINNACLE GROUP, LLC 2.47% $749,789.95
BRAZOS RIVER CONTRACTORS LLC 2.47% $749,789.95
LA GRANDE CONSTRUCTION COMPANY LLC 2.38% $722,469.67
ROYAL REBAR 0.91% $276,238.40
ANCORTEX, INC. 0.87% $264,096.05
J & M CONTRACTING, COMPANY 0.79% $239,811.36
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.63% $191,241.97
TRAFFIC SIGNS & LINES, LLC 0.44% $133,565.82
ASE CONTRACTORS LLC 0.44% $133,565.82
SIOUX EROSION CONTROL, INC. 0.32% $97,138.78
SPARTAN DIVERS 0.29% $88,032.02
STRAIGHT LINE SAWING & SEALING, INC. 0.18% $54,640.56
TOTAL HIGHWAY MAINTENANCE, LLC 0.17% $51,604.98
DAVIS MOTOR CRANE SERVICE, INC. 0.16% $48,569.39
FLEX SUPPLY, LLC 0.16% $48,569.39
AREA WIDE PROTECTIVE, INC. 0.15% $45,533.80
CRANE MASTERS, INC. 0.14% $42,498.22
HOUSTON SAWING & DRILLING 0.13% $39,462.63
HERMANOS STEEL, LLC 0.11% $33,391.46
PEACHTREE CONSTRUCTION, LTD. 0.09% $27,320.28
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.06% $18,213.52
DARKHORSE INDUSTRIES, L.L.C. 0.05% $15,177.93
SUN CRANE & HOIST, INC. 0.05% $15,177.93
BROCK CONSTRUCTION, LLC 0.03% $9,106.76
CURB PLANET INC. 0.02% $6,071.17
SCOTT DERR PAINTING CO, LLC 0.01% $3,035.59
STRUCTURAL INTEGRITY GROUP LLC 0.01% $3,035.59
BRAUN INTERTEC CORPORATION 0.00% $0.00
LUCKETT CRANE SERVICE 0.00% $0.00
TNT CRANE & RIGGING, INC. 0.00% $0.00
ROLL-LIFT USA, INC. 0.00% $0.00
PENHALL COMPANY 0.00% $0.00
Total: 52.65% $15,982,364.67

Bid Items

Items: 114, 0 filtered
HENDERSON SH 198  |  TYLER  |  0646-05-027  |  01/07/2021  |  $26,604,181  |  BR 2021(213)  |  RPLC BR&APP,C&G,RET WALLS,ACP B&S  |  738 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate COPASA INC J.D. ABRAMS, L.P. JENSEN CONSTRUCTION COMPANY OF TEXAS PULICE CONSTRUCTION, INC. AUSTIN BRIDGE & ROAD SERVICES, LP RAGLE CONSTRUCTION, INC. EAST TEXAS BRIDGE, INC. OHL USA, INC.
100 6002 PREPARING ROW STA 31.750 $1,150.000 $2,000.000 $35,500.000 $10,000.000 $95,000.000 $117,112.230 $127,500.000 $65,000.000 $140,000.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 837.000 $7.000 $9.680 $13.000 $7.500 $7.930 $6.820 $8.000 $10.000 $20.000
106 6001 OBLITERATING ABANDONED ROAD STA 10.630 $5,000.000 $1,500.000 $900.000 $800.000 $2,016.480 $965.760 $2,500.000 $3,500.000 $5,000.000
110 6001 EXCAVATION (ROADWAY) CY 3,019.000 $11.000 $8.560 $2.750 $8.000 $13.870 $14.020 $32.000 $20.000 $35.000
110 6003 EXCAVATION (SPECIAL) CY 31,952.000 $20.000 $18.580 $15.000 $14.000 $15.090 $16.150 $11.500 $30.000 $11.400
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 13,368.000 $25.000 $25.000 $15.500 $35.000 $10.840 $37.380 $30.000 $30.000 $45.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 16,220.000 $2.500 $1.480 $3.450 $3.000 $1.060 $1.680 $2.750 $2.000 $0.750
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 16,220.000 $0.800 $0.650 $0.720 $0.800 $0.650 $0.650 $0.690 $0.880 $0.690
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 8,110.000 $0.700 $0.630 $0.700 $0.800 $0.630 $0.630 $0.650 $0.880 $0.650
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 8,110.000 $0.700 $0.630 $0.660 $0.630 $0.630 $0.630 $0.630 $0.880 $0.630
168 6001 VEGETATIVE WATERING MG 357.000 $21.000 $28.000 $22.300 $25.000 $25.950 $25.950 $25.000 $15.000 $38.000
260 6001 LIME (HYDRATED LIME (DRY)) TON 53.000 $170.000 $185.000 $159.000 $180.000 $237.900 $170.450 $350.000 $300.000 $250.000
260 6027 LIME TRT (EXST MATL)(8") SY 2,907.000 $3.500 $5.000 $6.000 $5.000 $5.070 $6.000 $20.000 $8.000 $10.000
275 6001 CEMENT TON 53.000 $145.000 $166.950 $175.000 $150.000 $214.090 $141.060 $350.000 $200.000 $250.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 2,907.000 $3.000 $5.000 $5.000 $5.000 $2.770 $6.000 $20.000 $6.000 $10.000
314 6012 EMULS ASPH (EROSN CONT)(CSS-1) GAL 330.000 $3.100 $10.150 $11.000 $10.150 $4.500 $9.870 $10.150 $11.000 $10.180
316 6406 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) GAL 9,445.000 $2.800 $3.500 $3.700 $3.500 $3.700 $4.000 $3.500 $4.500 $5.000
316 6407 AGGR (TY-PD GR-3 OR TY-PL GR-3) CY 225.000 $107.000 $176.150 $185.000 $176.150 $207.000 $250.000 $176.150 $155.000 $180.000
340 6246 D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP) TON 663.000 $115.000 $121.000 $128.000 $121.000 $136.500 $112.370 $121.000 $150.000 $125.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 1,378.000 $1.500 $4.740 $5.000 $3.000 $6.020 $4.530 $6.250 $6.000 $10.000
400 6005 CEM STABIL BKFL CY 472.000 $306.000 $165.530 $160.000 $50.000 $100.200 $148.350 $97.000 $300.000 $150.000
402 6001 TRENCH EXCAVATION PROTECTION LF 835.000 $3.100 $2.280 $2.500 $20.000 $5.700 $10.000 $1.000 $10.000 $2.590
403 6001 TEMPORARY SPL SHORING SF 2,793.000 $50.000 $50.000 $71.000 $25.000 $32.500 $62.380 $25.000 $35.000 $40.000
405 6003 FOUNDATON LOADTEST(D4945)(DRILLD SHAFT) EA 2.000 $18,000.000 $19,991.300 $26,500.000 $6,000.000 $25,000.000 $5,000.000 $41,500.000 $10,000.000 $4,961.700
416 6001 DRILL SHAFT (18 IN) LF 122.000 $50.000 $70.000 $290.000 $300.000 $241.370 $83.680 $140.000 $100.000 $800.000
416 6005 DRILL SHAFT (42 IN) LF 568.000 $272.000 $211.680 $395.000 $500.000 $337.440 $189.500 $340.000 $225.000 $500.000
416 6006 DRILL SHAFT (48 IN) LF 10,602.000 $650.000 $814.410 $800.000 $950.000 $621.240 $670.000 $625.000 $750.000 $1,250.000
420 6013 CL C CONC (ABUT) CY 121.400 $1,010.000 $1,306.410 $1,025.000 $1,200.000 $989.400 $1,215.950 $800.000 $1,200.000 $1,500.000
420 6025 CL C CONC (BENT) CY 1,854.200 $935.000 $1,371.560 $1,500.000 $1,500.000 $1,670.000 $1,717.000 $1,200.000 $1,200.000 $2,000.000
422 6001 REINF CONC SLAB SF 249,600.000 $20.000 $18.020 $21.000 $16.000 $19.000 $25.000 $20.000 $24.000 $18.000
422 6015 APPROACH SLAB CY 133.800 $825.000 $585.000 $550.000 $650.000 $762.260 $561.190 $455.000 $550.000 $495.460
423 6001 RETAINING WALL (MSE) SF 12,990.000 $60.000 $67.250 $25.000 $50.000 $40.000 $16.000 $1.000 $75.000 $35.000
423 6003 RETAINING WALL (TEMP WALL) SF 3,115.000 $11.000 $19.000 $5.000 $18.000 $20.030 $9.000 $16.500 $35.000 $10.000
425 6041 PRESTR CONC GIRDER (TX70) LF 24,859.120 $170.000 $171.510 $173.000 $200.000 $248.920 $185.070 $150.000 $200.000 $200.000
432 6006 RIPRAP (CONC)(CL B) CY 183.000 $540.000 $472.110 $568.000 $650.000 $550.000 $580.270 $470.000 $500.000 $500.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 28.700 $500.000 $458.000 $568.000 $650.000 $550.000 $637.890 $500.000 $500.000 $480.000
432 6055 RIPRAP (STONE TY F)(DRY)(18") CY 240.000 $90.000 $260.000 $118.000 $140.000 $223.680 $125.000 $165.000 $150.000 $44.520
450 6001 RAIL (TY T1F) LF 12,540.000 $90.000 $111.570 $163.000 $160.000 $172.570 $205.000 $138.000 $200.000 $145.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 780.000 $85.000 $68.000 $121.000 $125.000 $146.110 $136.390 $102.000 $85.000 $157.130
464 6003 RC PIPE (CL III)(18 IN) LF 1,223.000 $40.000 $60.520 $57.000 $60.000 $107.220 $54.000 $58.000 $40.000 $48.000
464 6005 RC PIPE (CL III)(24 IN) LF 367.000 $57.000 $80.000 $78.000 $75.000 $144.860 $64.000 $75.000 $55.000 $69.000
465 6021 INLET (COMPL)(PCO)(5FT)(NONE) EA 6.000 $3,500.000 $5,188.650 $3,600.000 $4,200.000 $8,795.830 $4,000.000 $4,800.000 $6,000.000 $5,200.000
465 6022 INLET (COMPL)(PCO)(5FT)(LEFT) EA 4.000 $3,800.000 $5,640.800 $3,900.000 $4,200.000 $9,464.540 $5,000.000 $5,800.000 $6,500.000 $5,700.000
465 6023 INLET (COMPL)(PCO)(5FT)(RIGHT) EA 3.000 $3,800.000 $5,714.280 $3,900.000 $4,200.000 $9,464.810 $5,000.000 $6,150.000 $6,500.000 $5,700.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 28.000 $585.000 $800.000 $1,100.000 $1,400.000 $1,669.690 $1,000.000 $850.000 $600.000 $1,070.000
467 6389 SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 2.000 $1,000.000 $950.000 $1,100.000 $1,600.000 $2,806.480 $950.000 $1,000.000 $650.000 $1,225.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $875.000 $1,500.000 $1,350.000 $1,600.000 $3,161.740 $1,800.000 $1,775.000 $900.000 $1,480.000
496 6012 REMOV STR (BRIDGE 1000 FT OR GREATER) EA 1.000 $200,000.000 $1,232,000.000 $900,000.000 $1,150,000.000 $1,232,000.000 $1,492,500.000 $1,840,000.000 $1,500,000.000 $3,150,000.000
496 6016 REMOV STR (PIPE) EA 19.000 $320.000 $1,000.000 $56.000 $250.000 $1,500.710 $391.920 $275.000 $500.000 $350.000
500 6001 MOBILIZATION LS 1.000 $2,399,000.000 $2,650,000.000 $3,270,000.000 $3,400,000.000 $3,626,737.770 $3,718,313.440 $4,500,000.000 $3,800,000.000 $4,500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 30.000 $5,000.000 $1,000.000 $13,500.000 $29,997.330 $5,844.110 $9,610.000 $140,000.000 $70,000.000 $50,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,080.000 $24.000 $26.550 $32.500 $27.000 $26.550 $26.550 $32.000 $35.000 $29.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,080.000 $6.000 $8.450 $9.000 $8.000 $8.450 $8.450 $9.000 $11.000 $18.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 160.000 $20.000 $35.500 $31.500 $40.000 $35.500 $35.500 $21.500 $30.000 $45.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 160.000 $10.000 $11.950 $10.500 $10.000 $11.950 $11.950 $8.000 $11.000 $1.000
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY 600.000 $25.000 $33.120 $15.000 $20.000 $20.000 $18.000 $35.000 $30.000 $31.920
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 150.000 $92.000 $65.720 $144.000 $100.000 $149.710 $57.820 $120.000 $125.000 $75.410
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 6,400.000 $3.000 $2.490 $3.000 $2.700 $2.290 $2.290 $1.650 $3.000 $1.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 6,400.000 $0.800 $0.650 $0.800 $0.500 $0.650 $0.650 $0.600 $1.000 $0.550
506 6046 TRACKHOE WORK (EROSION & SEDMT CONT) HR 200.000 $118.000 $90.250 $182.000 $275.000 $198.520 $98.390 $95.000 $200.000 $84.580
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 1,605.000 $30.000 $35.000 $65.000 $75.000 $41.090 $38.880 $48.000 $75.000 $30.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 430.000 $5.000 $8.000 $5.000 $20.000 $18.650 $5.340 $8.500 $5.000 $22.900
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 1,605.000 $8.500 $6.000 $7.500 $25.000 $16.280 $9.230 $8.500 $15.000 $13.250
529 6008 CONC CURB & GUTTER (TY II) LF 1,390.000 $25.000 $26.090 $23.500 $15.000 $45.000 $42.210 $26.500 $35.000 $45.000
530 6005 DRIVEWAYS (ACP) SY 1,797.000 $27.000 $32.000 $23.000 $14.840 $33.000 $39.190 $14.840 $55.000 $19.260
530 6017 DRIVEWAYS (CONC) (HES) SY 101.000 $65.000 $110.000 $100.000 $100.000 $130.000 $94.210 $95.000 $95.000 $121.700
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 250.000 $20.000 $25.500 $20.000 $25.500 $25.500 $19.000 $25.500 $25.000 $19.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 3.000 $1,500.000 $1,946.100 $1,530.000 $1,946.100 $1,946.100 $1,450.000 $1,946.100 $1,800.000 $1,450.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 2.000 $1,100.000 $1,233.260 $790.000 $1,233.260 $1,233.260 $750.000 $1,233.260 $1,300.000 $750.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,077.000 $3.000 $2.770 $2.650 $2.770 $2.770 $2.500 $2.770 $3.000 $2.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 $2,150.000 $2,930.410 $2,625.000 $2,930.410 $2,930.410 $2,500.000 $2,930.410 $300.000 $2,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $360.000 $48.090 $231.000 $48.090 $48.090 $220.000 $48.090 $3,000.000 $220.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $1,000.000 $114.490 $121.000 $114.490 $114.490 $114.490 $114.490 $900.000 $850.000
545 6007 CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) EA 1.000 $20,000.000 $14,337.880 $16,500.000 $14,337.580 $14,337.880 $14,337.880 $14,337.880 $18,000.000 $22,477.230
545 6010 CRASH CUSH ATTEN (INSTL)(L)(W)(TL3) EA 2.000 $35,000.000 $27,246.730 $31,500.000 $27,246.730 $27,246.730 $27,246.730 $27,246.730 $33,000.000 $22,500.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4.000 $20,000.000 $8,066.770 $9,300.000 $8,006.770 $8,006.770 $8,006.770 $8,006.770 $11,000.000 $7,625.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 3.000 $245.000 $275.950 $237.000 $225.700 $250.000 $350.000 $225.700 $300.000 $295.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 2.000 $290.000 $306.360 $282.000 $267.300 $300.000 $375.000 $267.300 $400.000 $329.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 18.000 $450.000 $265.610 $320.000 $303.900 $350.000 $630.000 $303.900 $1,000.000 $385.000
644 6076 REMOVE SM RD SN SUP&AM EA 14.000 $170.000 $103.980 $107.000 $101.900 $80.000 $90.000 $101.900 $150.000 $137.000
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 9.000 $15.000 $28.410 $13.000 $12.300 $30.000 $29.000 $12.300 $30.000 $29.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 8,500.000 $0.150 $0.500 $0.420 $0.400 $0.360 $0.360 $0.400 $0.550 $0.360
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 14,680.000 $0.400 $0.500 $0.420 $0.400 $0.360 $0.360 $0.400 $0.550 $0.360
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 314.000 $2.500 $5.000 $4.600 $5.500 $4.000 $4.000 $5.500 $5.500 $4.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 314.000 $2.500 $5.000 $4.600 $5.500 $4.000 $4.000 $5.500 $5.500 $4.000
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 936.000 $2.000 $4.000 $4.600 $5.000 $4.000 $4.000 $5.000 $4.500 $4.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 936.000 $2.000 $4.000 $4.600 $5.000 $4.000 $4.000 $5.000 $4.500 $4.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 17,037.000 $1.000 $0.660 $1.150 $0.250 $0.750 $1.000 $1.000 $2.000 $1.230
662 6112 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 765.000 $1.500 $1.510 $1.150 $1.000 $1.000 $1.500 $2.000 $2.000 $1.600
662 6113 WK ZN PAV MRK SHT TERM RMV (Y)(4") LF 1,286.000 $1.000 $1.360 $1.150 $1.000 $0.850 $1.500 $2.000 $2.000 $1.580
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 100.000 $3.000 $6.000 $10.500 $8.000 $10.000 $10.000 $8.000 $7.000 $10.000
666 6147 REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF 300.000 $3.000 $6.000 $8.400 $8.000 $8.000 $8.000 $8.000 $7.000 $8.000
666 6156 REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) EA 3.000 $325.000 $500.000 $450.000 $100.000 $425.000 $425.000 $100.000 $600.000 $425.000
666 6224 PAVEMENT SEALER 4" LF 13,680.000 $0.250 $0.350 $0.180 $0.200 $0.170 $0.170 $0.200 $0.380 $0.170
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 1,950.000 $0.300 $0.600 $0.580 $0.900 $0.550 $0.550 $0.900 $0.700 $0.550
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 12,560.000 $0.300 $0.600 $0.490 $0.700 $0.470 $0.470 $0.700 $0.700 $0.470
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 600.000 $0.300 $0.600 $0.580 $0.900 $0.550 $0.550 $0.900 $0.700 $0.550
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 15,310.000 $0.300 $0.600 $0.490 $0.700 $0.470 $0.470 $0.700 $0.700 $0.470
668 6078 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 6.000 $310.000 $190.000 $470.000 $450.000 $445.000 $445.000 $450.000 $220.000 $445.000
672 6007 REFL PAV MRKR TY I-C EA 24.000 $3.000 $5.000 $4.200 $5.000 $4.000 $4.000 $5.500 $6.000 $4.000
672 6009 REFL PAV MRKR TY II-A-A EA 440.000 $3.000 $3.600 $4.200 $5.500 $4.000 $4.000 $5.500 $4.000 $4.000
672 6010 REFL PAV MRKR TY II-C-R EA 74.000 $3.000 $5.000 $4.200 $5.500 $4.000 $4.000 $5.500 $6.000 $4.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 6,250.000 $0.200 $0.750 $0.600 $1.000 $0.570 $0.570 $1.000 $1.000 $0.570
678 6001 PAV SURF PREP FOR MRK (4") LF 13,680.000 $0.200 $0.150 $0.260 $0.100 $0.250 $0.250 $0.100 $0.170 $0.250
3077 6001 SP MIXES SP-B PG64-22 TON 6,382.000 $100.000 $103.350 $109.000 $103.350 $115.500 $90.990 $115.000 $115.000 $120.000
3077 6011 SP MIXES SP-C PG64-22 TON 144.000 $95.000 $163.550 $172.000 $163.350 $130.000 $115.140 $163.350 $200.000 $163.760
3077 6022 SP MIXES SP-C SAC-A PG70-22 TON 2,474.000 $110.000 $121.100 $128.000 $121.100 $126.500 $103.940 $121.100 $125.000 $121.400
3077 6075 TACK COAT GAL 4,066.000 $3.250 $3.500 $3.700 $3.500 $3.100 $3.000 $3.500 $3.000 $3.510
4021 6001 TIP TESTING(DRILL SHAFT) EA 8.000 $4,500.000 $4,665.490 $3,700.000 $3,000.000 $3,440.630 $3,000.000 $3,440.630 $4,000.000 $2,977.020
5048 6002 FLOATING TURBIDITY BARRIER(FUR & INST) LF 5,700.000 $16.400 $27.550 $23.500 $40.000 $29.210 $34.860 $27.500 $65.000 $16.540
5048 6003 FLOATING TURBIDITY BARRIER (REMOVE) LF 5,700.000 $3.900 $12.000 $3.000 $1.500 $5.210 $5.660 $7.700 $10.000 $4.270
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,500.000 $8,200.000 $12,500.000 $7,500.000 $19,031.990 $7,500.000 $20,000.000 $200,000.000 $8,000.000
6185 6002 TMA (STATIONARY) DAY 200.000 $125.000 $142.950 $130.000 $300.000 $200.000 $275.060 $314.890 $300.000 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 6.000 $101.000 $250.000 $600.000 $750.000 $200.000 $685.820 $500.000 $300.000 $1,000.000
Totals: $26,604,181.40 $30,355,868.32 $32,990,955.36 $34,611,841.66 $35,656,889.94 $37,295,019.37 $38,155,320.45 $39,757,677.70 $46,893,811.55