County: HENDERSON Highway: FM 315 Date: 08/03/2023 (1 year ago) Engineer's Estimate: $11,302,404 Control Number: 0559-02-037
Project: STP 2B23(064)HES District: TYLER Time: 119 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $11,302,404.38
BIG CREEK CONSTRUCTION, LTD.   $9,287,827.25 1
-17.82% | -$2,014,577.13
A. L. HELMCAMP, INC.   $9,814,464.00 2
-13.16% | -$1,487,940.38
5.67% | $526,636.75
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO.,INC. 8.84% $821,043.93
COLD CREEK CONSTRUCTION, LTD 3.35% $311,142.21
STRIPING TECHNOLOGY, L.P. 3.09% $286,993.86
MURRAY CONSTRUCTION 1.56% $144,890.11
FORTSON CONTRACTING, INC. 1.19% $110,525.14
SOUTHWEST ENVIRONMENT SERVICES LLC 1.17% $108,667.58
PROFESSIONAL TRAFFIC CONTROL LLC 0.15% $13,931.74
KING GEORGE TRAFFIC SOLUTIONS LLC 0.13% $12,074.18
FREDONIA CONSTRUCTION SERVICES 0.01% $928.78
Total: 19.49% $1,810,197.53

Bid Items

Items: 92, 0 filtered
HENDERSON FM 315  |  TYLER  |  0559-02-037  |  08/03/2023  |  $11,302,404  |  STP 2B23(064)HES  |  HAZARD ELIM & SAFETY  |  119 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BIG CREEK CONSTRUCTION, LTD. A. L. HELMCAMP, INC.
100 6002 PREPARING ROW STA 253.000 $6,000.000 $3,000.000 $2,500.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 624.000 $27.000 $25.000 $25.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 2,670.000 $20.000 $15.000 $7.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 253.000 $600.000 $1,000.000 $500.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 1,677.000 $100.000 $40.000 $90.000
134 6001 BACKFILL (TY A) STA 253.000 $450.000 $500.000 $650.000
150 6001 BLADING STA 253.000 $250.000 $250.000 $200.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 12,394.000 $8.000 $3.500 $3.600
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 47,159.000 $0.330 $0.200 $0.140
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 94,318.000 $0.790 $0.750 $0.600
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 47,159.000 $1.000 $0.750 $0.600
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 47,159.000 $1.000 $0.750 $0.600
168 6001 VEGETATIVE WATERING MG 1,037.000 $47.500 $10.000 $35.000
314 6012 EMULS ASPH (EROSN CONT)(CSS-1) GAL 4,218.000 $8.000 $5.000 $4.500
316 6024 ASPH (CRS-2P) GAL 15,862.000 $7.900 $4.500 $6.000
316 6408 AGGR(TY-PD GR-4 OR TY-PL GR-4) CY 339.000 $382.000 $150.000 $320.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 4,444.000 $9.000 $5.000 $15.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 18.000 $250.000 $350.000 $240.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 154.000 $630.000 $650.000 $700.000
462 6051 CONC BOX CULV (5 FT X 3 FT)(EXTEND) LF 39.000 $1,000.000 $1,200.000 $1,000.000
462 6055 CONC BOX CULV (6 FT X 4 FT)(EXTEND) LF 13.000 $1,300.000 $1,600.000 $1,200.000
464 6003 RC PIPE (CL III)(18 IN) LF 2,284.000 $75.000 $90.000 $80.000
464 6005 RC PIPE (CL III)(24 IN) LF 473.000 $100.000 $110.000 $120.000
464 6007 RC PIPE (CL III)(30 IN) LF 38.000 $105.000 $250.000 $150.000
464 6008 RC PIPE (CL III)(36 IN) LF 10.000 $155.000 $350.000 $350.000
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 10.000 $1,500.000 $1,000.000 $1,300.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 246.000 $1,200.000 $1,200.000 $950.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 6.000 $1,400.000 $1,400.000 $1,600.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 34.000 $1,600.000 $1,800.000 $1,800.000
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 7.000 $3,000.000 $2,500.000 $2,600.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $6,000.000 $4,000.000 $4,400.000
496 6016 REMOV STR (PIPE) EA 114.000 $605.000 $500.000 $550.000
500 6001 MOBILIZATION LS 1.000 $600,000.000 $912,000.000 $850,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $10,000.000 $30,000.000 $24,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 440.000 $43.000 $37.000 $43.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 440.000 $15.000 $8.000 $10.000
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY 100.000 $50.000 $30.000 $33.000
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 20.000 $125.000 $150.000 $140.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,600.000 $4.000 $6.000 $3.800
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,600.000 $2.000 $2.000 $1.000
506 6046 TRACKHOE WORK (EROSION & SEDMT CONT) HR 20.000 $150.000 $150.000 $145.000
530 6002 INTERSECTIONS (ACP) SY 7,395.000 $50.000 $50.000 $50.000
530 6005 DRIVEWAYS (ACP) SY 8,604.000 $65.000 $50.000 $90.000
530 6008 TURNOUTS (ACP) SY 2,266.000 $50.000 $80.000 $50.000
530 6017 DRIVEWAYS (CONC) (HES) SY 624.000 $140.000 $150.000 $220.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 61,342.000 $0.500 $0.250 $0.200
533 6002 RUMBLE STRIPS (CENTERLINE) LF 35,121.000 $0.350 $0.250 $0.200
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,900.000 $33.000 $35.000 $27.000
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 50.000 $50.000 $50.000 $32.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,325.000 $2.500 $5.000 $2.300
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,100.000 $3,200.000 $3,100.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $210.000 $300.000 $230.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 47.000 $600.000 $350.000 $350.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 26.000 $714.000 $400.000 $380.000
560 6006 MAILBOX INSTALL-M (TWG-POST) TY 2 EA 66.000 $775.000 $600.000 $570.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 104.000 $900.000 $650.000 $580.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 31.000 $989.000 $750.000 $720.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 2.000 $1,165.000 $1,000.000 $940.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 2.000 $1,200.000 $1,200.000 $1,000.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 3.000 $635.000 $600.000 $530.000
644 6076 REMOVE SM RD SN SUP&AM EA 122.000 $220.000 $100.000 $85.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 29.000 $25.000 $40.000 $35.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 25.000 $27.000 $40.000 $35.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 32.000 $90.000 $60.000 $75.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 148,288.000 $1.000 $0.400 $0.330
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 149,068.000 $1.000 $0.400 $0.300
662 6038 WK ZN PAV MRK NON-REMOV (Y)8"(SLD) LF 821.000 $1.000 $1.500 $1.000
662 6041 WK ZN PAV MRK NON-REMOV (Y)24"(SLD) LF 378.000 $5.000 $5.000 $4.000
662 6064 WK ZN PAV MRK REMOV (W)6"(BRK) LF 441.000 $2.000 $3.000 $1.400
662 6098 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 50,297.000 $3.000 $1.500 $1.400
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 3,584.000 $4.000 $2.000 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 7,022.000 $4.000 $2.000 $1.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 821.000 $1.670 $2.000 $1.100
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 778.000 $11.220 $10.000 $6.600
666 6225 PAVEMENT SEALER 6" LF 28,160.000 $1.000 $0.450 $0.400
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 76,805.000 $1.130 $1.000 $0.800
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 1,849.000 $1.000 $1.200 $1.100
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 78,268.000 $1.170 $1.000 $0.800
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 7.000 $239.000 $300.000 $230.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 7.000 $280.000 $350.000 $260.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 5.000 $270.000 $150.000 $110.000
672 6007 REFL PAV MRKR TY I-C EA 64.000 $4.800 $15.000 $11.000
672 6009 REFL PAV MRKR TY II-A-A EA 8.000 $6.000 $15.000 $11.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 28,160.000 $1.100 $0.900 $0.730
677 6028 ELIM EXT PV MRK & MRKS (RUMBLE STRIP) LF 136,447.000 $1.500 $0.500 $0.280
678 6002 PAV SURF PREP FOR MRK (6") LF 28,160.000 $1.000 $0.300 $0.220
3077 6001 SP MIXES SP-B PG64-22 TON 8,606.000 $200.000 $150.000 $185.000
3077 6022 SP MIXES SP-C SAC-A PG70-22 TON 12,300.000 $200.000 $170.000 $190.000
3077 6075 TACK COAT GAL 16,096.000 $6.150 $4.000 $6.590
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 256.000 $212.000 $150.000 $250.000
6185 6002 TMA (STATIONARY) DAY 220.000 $400.000 $300.000 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 30.000 $250.000 $600.000 $300.000
Totals: $11,302,404.38 $9,287,827.25 $9,814,464.00