Job Info for 0163-03-052

County: HENDERSON Highway: SH 31 Date: 09/07/2023 (1 year ago) Engineer's Estimate: $2,105,493 Control Number: 0163-03-052
Project: F 2024(024) District: TYLER Time: 78 WORKING DAYS Type: RESURFACE ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,105,493.10
BAKER & COMPANY CONSTRUCTION, LLC   $2,061,802.30 1
-2.08% | -$43,690.80
REYNOLDS & KAY, LTD.   $2,322,902.50 2
10.33% | $217,409.40
12.66% | $261,100.20
BIG CREEK CONSTRUCTION, LTD.   $2,687,063.00 3
27.62% | $581,569.90
30.33% | $625,260.70
15.68% | $364,160.50
FNH CONSTRUCTION, LLC   $2,798,698.00 4
32.92% | $693,204.90
35.74% | $736,895.70
4.15% | $111,635.00
Subcontractor Percentage Amount
TEXANA LAND & ASPHALT, INC. 49.76% $1,025,952.82
TRUE ROADS CONSTRUCTION, LLC 3.99% $82,265.91
STRIPING TECHNOLOGY, L.P. 3.98% $82,059.73
REYNOLDS & KAY, LTD. 3.85% $79,379.39
AWP SAFETY 0.49% $10,102.83
FLEX SUPPLY, LLC 0.36% $7,422.49
NEED GRASS NOW LLC 0.35% $7,216.31
Total: 62.78% $1,294,399.48

Bid Items

Items: 49, 0 filtered
HENDERSON SH 31  |  TYLER  |  0163-03-052  |  09/07/2023  |  $2,105,493  |  F 2024(024)  |  RESURF ROADWAY  |  78 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BAKER & COMPANY CONSTRUCTION, LLC REYNOLDS & KAY, LTD. BIG CREEK CONSTRUCTION, LTD. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 10.000 $5,000.000 $1,585.000 $245.000 $10,000.000 $20,000.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 1,080.000 $10.000 $3.600 $7.000 $15.000 $50.000
104 6028 REMOVING CONC (MISC) SY 194.000 $25.000 $40.000 $15.000 $30.000 $50.000
104 6045 REMOVE CONC (MISC) EA 3.000 $1,000.000 $1,295.000 $315.000 $1,500.000 $1,500.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 2,720.000 $12.000 $6.900 $5.750 $15.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 2,726.000 $12.000 $7.350 $13.000 $20.000 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 7,357.000 $14.000 $16.000 $21.000 $50.000 $30.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 5,274.000 $4.000 $2.450 $3.000 $2.000 $10.000
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 5,274.000 $1.000 $1.050 $0.750 $1.000 $2.000
168 6001 VEGETATIVE WATERING MG 58.000 $20.000 $5.000 $15.000 $25.000 $100.000
247 6230 FL BS (CMP IN PLACE)(TY A GR 1-2)(8") SY 11,161.000 $25.000 $18.500 $25.000 $25.000 $28.000
275 6001 CEMENT TON 235.000 $280.000 $275.000 $315.000 $350.000 $325.000
275 6002 CEMENT TREAT (EXIST MATL) (6") SY 11,161.000 $18.000 $2.550 $9.000 $7.000 $12.000
310 6001 PRIME COAT (MULTI OPTION) GAL 2,791.000 $6.500 $7.350 $7.000 $7.000 $10.000
316 6001 ASPH (MULTI OPTION) GAL 4,018.000 $5.000 $7.350 $7.000 $6.000 $10.000
316 6002 AGGR (MULTI OPTION) CY 90.000 $300.000 $278.000 $265.000 $250.000 $500.000
416 6003 DRILL SHAFT (30 IN) LF 50.000 $300.000 $312.500 $275.000 $350.000 $385.000
432 6001 RIPRAP (CONC)(4 IN) CY 3.000 $800.000 $2,285.000 $1,050.000 $2,000.000 $650.000
464 6019 RC PIPE (CL IV)(30 IN) LF 296.000 $200.000 $166.000 $155.000 $250.000 $200.000
465 6009 JCTBOX(COMPL)(PJB)(5FTX5FT) EA 1.000 $8,900.000 $7,385.000 $7,000.000 $7,500.000 $12,500.000
467 6410 SET (TY II) (30 IN) (CMP) (6: 1) (P) EA 1.000 $5,000.000 $5,110.000 $5,500.000 $4,000.000 $9,500.000
496 6004 REMOV STR (SET) EA 3.000 $700.000 $650.000 $525.000 $1,000.000 $500.000
496 6007 REMOV STR (PIPE) LF 46.000 $20.000 $42.200 $22.000 $50.000 $50.000
500 6001 MOBILIZATION LS 1.000 $180,000.000 $125,600.000 $195,000.000 $250,000.000 $250,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $5,000.000 $2,500.000 $6,500.000 $9,500.000 $8,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 500.000 $5.000 $3.300 $4.000 $6.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 500.000 $1.000 $1.650 $1.250 $1.000 $2.000
529 6008 CONC CURB & GUTTER (TY II) LF 1,827.000 $40.000 $42.650 $45.000 $80.000 $65.000
529 6009 CONC CURB (DOWEL)(SLOTTED) LF 27.000 $25.000 $215.000 $155.000 $125.000 $100.000
610 6218 IN RD IL (TY SA) 40T-12 (250W EQ) LED EA 5.000 $5,500.000 $6,050.000 $6,050.000 $7,500.000 $8,500.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 610.000 $16.500 $9.900 $10.000 $10.000 $30.000
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 380.000 $36.000 $27.500 $27.500 $25.000 $60.000
620 6007 ELEC CONDR (NO.8) BARE LF 990.000 $2.500 $2.750 $2.750 $3.000 $3.000
620 6008 ELEC CONDR (NO.8) INSULATED LF 1,980.000 $1.000 $2.750 $2.750 $3.000 $3.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 2.000 $1,300.000 $935.000 $935.000 $1,000.000 $1,500.000
628 6298 ELC SRV TY T 120/240 000(NS)GS(L)SP(O) EA 1.000 $6,000.000 $3,850.000 $3,850.000 $5,000.000 $9,500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 12.000 $600.000 $726.000 $785.000 $1,000.000 $1,150.000
644 6076 REMOVE SM RD SN SUP&AM EA 17.000 $130.000 $138.000 $115.000 $100.000 $100.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 1.000 $100.000 $91.000 $108.000 $100.000 $100.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 24.000 $3.000 $5.500 $5.500 $7.000 $6.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 363.000 $1.200 $5.500 $5.500 $7.000 $6.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 2,780.000 $2.000 $3.300 $3.300 $4.000 $6.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 $240.000 $275.000 $275.000 $250.000 $250.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 $250.000 $330.000 $330.000 $300.000 $250.000
672 6007 REFL PAV MRKR TY I-C EA 18.000 $5.000 $11.000 $11.000 $10.000 $6.000
1002 6025 LANDSCAPE AMENITY (TRASH/RECYCLE BIN) EA 1.000 $1,000.000 $625.000 $250.000 $7,500.000 $5,000.000
3077 6005 SP MIXES SP-B PG70-22 TON 3,044.000 $150.000 $218.500 $220.000 $180.000 $160.000
3077 6032 SP MIXES SP-C PG76-22 TON 1,827.000 $168.000 $225.750 $220.000 $190.000 $180.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 74.000 $125.000 $75.000 $90.000 $125.000 $150.000
Totals: $2,105,493.10 $2,061,802.30 $2,322,902.50 $2,687,063.00 $2,798,698.00