|
|
PREPARING ROW
|
STA
|
47.000
|
$1,500.000
|
$950.000
|
$2,400.000
|
$1,600.000
|
$2,000.000
|
$900.000
|
$1,300.000
|
$200.000
|
$800.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
12.000
|
$20.000
|
$71.000
|
$37.620
|
$20.000
|
$44.000
|
$106.000
|
$86.300
|
$10.000
|
$83.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
8,248.000
|
$6.000
|
$11.500
|
$8.820
|
$6.250
|
$17.500
|
$11.000
|
$8.500
|
$28.800
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,761.000
|
$16.000
|
$7.750
|
$17.280
|
$14.000
|
$19.500
|
$16.000
|
$28.100
|
$11.200
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,525.000
|
$17.000
|
$4.500
|
$17.280
|
$15.000
|
$20.000
|
$24.000
|
$27.000
|
$18.700
|
$31.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,566.000
|
$2.000
|
$2.000
|
$1.930
|
$1.500
|
$4.500
|
$3.050
|
$3.700
|
$7.100
|
$2.400
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
14,566.000
|
$0.300
|
$0.500
|
$0.210
|
$0.250
|
$0.250
|
$0.150
|
$0.200
|
$0.300
|
$0.300
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
14,566.000
|
$0.200
|
$0.500
|
$0.190
|
$0.250
|
$0.210
|
$0.150
|
$0.180
|
$0.300
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
947.000
|
$22.000
|
$36.000
|
$23.940
|
$10.000
|
$75.000
|
$39.250
|
$38.800
|
$66.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
14,566.000
|
$1.250
|
$2.000
|
$0.920
|
$1.500
|
$2.350
|
$0.700
|
$0.900
|
$1.800
|
$1.600
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
6,258.000
|
$55.000
|
$56.000
|
$51.330
|
$57.750
|
$69.500
|
$68.000
|
$80.300
|
$71.000
|
$77.000
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
21,411.000
|
$3.500
|
$7.750
|
$4.210
|
$4.000
|
$6.500
|
$8.500
|
$2.650
|
$9.200
|
$6.100
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
472.000
|
$177.000
|
$323.000
|
$259.200
|
$250.000
|
$195.000
|
$250.000
|
$269.000
|
$280.000
|
$275.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
3,399.000
|
$4.500
|
$5.000
|
$6.080
|
$4.500
|
$5.250
|
$4.500
|
$4.750
|
$7.000
|
$5.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
640.000
|
$10.000
|
$14.000
|
$16.200
|
$14.000
|
$11.000
|
$12.050
|
$12.700
|
$36.000
|
$13.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
673.000
|
$30.000
|
$20.000
|
$50.000
|
$4.000
|
$55.000
|
$35.550
|
$23.200
|
$10.000
|
$14.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
53.000
|
$375.000
|
$460.000
|
$375.000
|
$550.000
|
$510.000
|
$380.000
|
$566.000
|
$450.000
|
$440.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
404.000
|
$60.000
|
$106.000
|
$160.000
|
$130.000
|
$140.000
|
$205.000
|
$255.000
|
$231.000
|
$280.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1.400
|
$650.000
|
$2,011.000
|
$1,048.950
|
$900.000
|
$1,000.000
|
$2,270.000
|
$853.000
|
$940.000
|
$1,900.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
6.000
|
$550.000
|
$727.000
|
$874.650
|
$600.000
|
$835.000
|
$570.000
|
$785.000
|
$625.000
|
$600.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
70.000
|
$75.000
|
$155.000
|
$89.240
|
$100.000
|
$85.000
|
$175.000
|
$144.000
|
$90.000
|
$112.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
200.000
|
$95.000
|
$174.000
|
$162.280
|
$90.000
|
$100.000
|
$184.000
|
$173.000
|
$110.000
|
$95.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,000.000
|
$15,842.000
|
$9,334.470
|
$11,500.000
|
$9,000.000
|
$7,200.000
|
$9,570.000
|
$21,250.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$2,144.000
|
$1,924.640
|
$1,800.000
|
$1,850.000
|
$1,800.000
|
$1,720.000
|
$2,800.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$2,000.000
|
$2,684.000
|
$2,938.940
|
$2,500.000
|
$2,800.000
|
$2,760.000
|
$2,400.000
|
$3,300.000
|
$2,600.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$400.000
|
$661.000
|
$523.950
|
$225.000
|
$500.000
|
$410.000
|
$326.000
|
$600.000
|
$600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,811.000
|
$2,000.000
|
$1,001.000
|
$1,500.000
|
$7,500.000
|
$742.000
|
$1,200.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
206.000
|
$15.000
|
$27.250
|
$30.000
|
$17.000
|
$35.000
|
$15.200
|
$11.200
|
$10.000
|
$56.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
4.000
|
$550.000
|
$1,811.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
$646.000
|
$337.000
|
$800.000
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$225,000.000
|
$31,624.000
|
$323,759.940
|
$330,000.000
|
$350,000.000
|
$330,000.000
|
$330,000.000
|
$191,500.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$5,091.000
|
$5,000.000
|
$17,000.000
|
$10,000.000
|
$3,600.000
|
$5,500.000
|
$1,850.000
|
$7,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
56.000
|
$30.000
|
$30.000
|
$28.700
|
$24.000
|
$33.000
|
$27.000
|
$28.600
|
$29.000
|
$26.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
20.000
|
$35.000
|
$45.000
|
$42.500
|
$40.000
|
$52.000
|
$40.000
|
$42.300
|
$48.000
|
$43.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
76.000
|
$45.000
|
$40.000
|
$37.250
|
$35.000
|
$50.000
|
$35.000
|
$37.000
|
$42.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
76.000
|
$12.000
|
$25.000
|
$8.500
|
$20.000
|
$8.000
|
$8.000
|
$8.500
|
$24.000
|
$22.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$25.000
|
$30.000
|
$23.500
|
$24.000
|
$17.000
|
$22.000
|
$23.300
|
$29.000
|
$26.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$12.000
|
$24.000
|
$2.250
|
$19.000
|
$5.000
|
$2.000
|
$2.100
|
$10.000
|
$21.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,322.000
|
$3.000
|
$4.000
|
$2.050
|
$3.500
|
$3.750
|
$1.900
|
$2.000
|
$4.200
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,322.000
|
$0.750
|
$1.000
|
$0.850
|
$0.750
|
$0.250
|
$0.800
|
$0.850
|
$0.900
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,581.000
|
$8.000
|
$4.000
|
$4.100
|
$3.500
|
$5.250
|
$3.850
|
$4.050
|
$4.200
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,581.000
|
$1.000
|
$3.000
|
$1.080
|
$0.750
|
$0.500
|
$1.000
|
$1.050
|
$0.900
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
387.000
|
$72.000
|
$70.000
|
$96.660
|
$120.000
|
$111.000
|
$108.000
|
$140.000
|
$150.000
|
$130.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
354.000
|
$55.000
|
$100.000
|
$90.360
|
$115.000
|
$44.000
|
$168.000
|
$100.000
|
$110.000
|
$120.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
80.000
|
$30.000
|
$45.000
|
$30.000
|
$40.000
|
$38.000
|
$40.800
|
$42.100
|
$48.000
|
$43.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
2.000
|
$3,200.000
|
$3,750.000
|
$3,000.000
|
$4,200.000
|
$3,800.000
|
$3,440.000
|
$3,550.000
|
$4,000.000
|
$3,600.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
476.000
|
$32.000
|
$50.000
|
$25.000
|
$70.000
|
$26.500
|
$41.050
|
$22.300
|
$20.000
|
$44.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
427.000
|
$6.000
|
$5.000
|
$5.000
|
$6.000
|
$11.000
|
$5.150
|
$3.950
|
$10.000
|
$5.500
|
|
|
WIRE FENCE (TY B)
|
LF
|
5,017.000
|
$15.000
|
$22.000
|
$15.000
|
$12.000
|
$15.000
|
$19.250
|
$10.600
|
$10.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
316.000
|
$19.000
|
$25.000
|
$20.000
|
$20.250
|
$20.250
|
$20.200
|
$22.500
|
$24.000
|
$24.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
159.000
|
$28.000
|
$30.000
|
$23.000
|
$27.750
|
$27.750
|
$23.250
|
$30.800
|
$27.600
|
$27.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,059.000
|
$40.000
|
$55.000
|
$45.000
|
$52.750
|
$52.750
|
$45.450
|
$58.600
|
$54.000
|
$53.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,383.000
|
$2.000
|
$2.000
|
$1.500
|
$1.800
|
$1.800
|
$1.500
|
$2.000
|
$1.800
|
$1.800
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,545.000
|
$2.000
|
$2.500
|
$2.000
|
$1.950
|
$1.950
|
$2.000
|
$2.150
|
$2.400
|
$2.400
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
173.000
|
$2.500
|
$3.500
|
$3.000
|
$2.350
|
$2.350
|
$3.050
|
$2.600
|
$3.600
|
$3.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
345.000
|
$3.000
|
$5.000
|
$4.000
|
$2.500
|
$2.500
|
$4.050
|
$2.750
|
$4.800
|
$4.700
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,650.000
|
$2,200.000
|
$1,800.000
|
$2,000.000
|
$1,775.000
|
$1,820.000
|
$1,970.000
|
$2,160.000
|
$2,100.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
1.000
|
$5,750.000
|
$6,150.000
|
$5,000.000
|
$10,000.000
|
$7,750.000
|
$5,100.000
|
$8,600.000
|
$6,000.000
|
$5,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
188.750
|
$50.000
|
$25.000
|
$30.000
|
$28.000
|
$24.000
|
$30.000
|
$25.400
|
$29.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$600.000
|
$675.000
|
$435.000
|
$705.000
|
$612.000
|
$440.000
|
$647.000
|
$735.000
|
$655.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$650.000
|
$850.000
|
$480.000
|
$875.000
|
$758.000
|
$480.000
|
$802.000
|
$910.000
|
$812.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$1,015.000
|
$550.000
|
$1,050.000
|
$907.000
|
$550.000
|
$960.000
|
$1,090.000
|
$972.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$450.000
|
$575.000
|
$400.000
|
$590.000
|
$510.000
|
$400.000
|
$540.000
|
$610.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$100.000
|
$150.000
|
$100.000
|
$155.000
|
$135.000
|
$100.000
|
$143.000
|
$160.000
|
$145.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
2.000
|
$350.000
|
$397.600
|
$300.000
|
$410.000
|
$355.000
|
$300.000
|
$376.000
|
$430.000
|
$380.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
1.000
|
$200.000
|
$870.240
|
$777.000
|
$777.000
|
$200.000
|
$800.000
|
$822.000
|
$240.000
|
$832.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,898.000
|
$1.200
|
$3.080
|
$2.750
|
$2.750
|
$2.000
|
$2.800
|
$2.900
|
$2.400
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
34.000
|
$12.000
|
$19.890
|
$17.760
|
$17.760
|
$15.000
|
$18.200
|
$18.800
|
$18.000
|
$19.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,431.000
|
$1.200
|
$3.080
|
$2.750
|
$2.750
|
$2.000
|
$2.800
|
$2.900
|
$2.400
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,801.000
|
$1.000
|
$0.860
|
$0.770
|
$0.770
|
$1.000
|
$0.800
|
$0.810
|
$1.200
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
124.000
|
$7.500
|
$8.740
|
$7.770
|
$7.770
|
$16.000
|
$7.950
|
$8.200
|
$19.200
|
$8.300
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$140.000
|
$197.120
|
$176.000
|
$176.000
|
$215.000
|
$181.000
|
$186.000
|
$258.000
|
$189.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$160.000
|
$308.000
|
$275.000
|
$275.000
|
$235.000
|
$280.000
|
$291.000
|
$280.000
|
$295.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
410.000
|
$4.000
|
$4.890
|
$4.370
|
$4.370
|
$8.000
|
$4.500
|
$4.600
|
$9.600
|
$4.700
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
9,617.000
|
$0.350
|
$0.380
|
$0.340
|
$0.340
|
$0.500
|
$0.350
|
$0.360
|
$0.600
|
$0.400
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,801.000
|
$0.450
|
$0.380
|
$0.340
|
$0.340
|
$1.000
|
$0.350
|
$0.360
|
$1.200
|
$0.400
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
124.000
|
$3.000
|
$4.820
|
$4.300
|
$4.300
|
$7.000
|
$4.400
|
$4.550
|
$8.400
|
$4.600
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
8.000
|
$65.000
|
$68.320
|
$61.000
|
$61.000
|
$150.000
|
$62.600
|
$64.500
|
$180.000
|
$65.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
8.000
|
$75.000
|
$86.240
|
$77.000
|
$77.000
|
$170.000
|
$79.000
|
$81.500
|
$210.000
|
$82.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
10,494.000
|
$0.250
|
$0.380
|
$0.340
|
$0.340
|
$0.500
|
$0.350
|
$0.360
|
$0.600
|
$0.400
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
410.000
|
$1.500
|
$2.800
|
$2.500
|
$2.500
|
$3.500
|
$2.550
|
$2.650
|
$4.200
|
$2.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,617.000
|
$0.450
|
$0.480
|
$0.430
|
$0.430
|
$0.750
|
$0.450
|
$0.450
|
$0.900
|
$0.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
10,494.000
|
$0.750
|
$0.860
|
$0.770
|
$0.770
|
$1.000
|
$0.800
|
$0.810
|
$1.200
|
$0.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
429.000
|
$4.500
|
$8.700
|
$7.770
|
$7.770
|
$7.000
|
$7.950
|
$8.200
|
$8.400
|
$8.300
|
|
TRAFFIC BUTTON TY I-C
|
EA
|
95.000
|
$5.000
|
$8.700
|
$7.770
|
$7.770
|
$7.000
|
$7.950
|
$8.200
|
$8.400
|
$8.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
174.000
|
$1.000
|
$3.810
|
$3.400
|
$3.400
|
$1.000
|
$3.500
|
$3.600
|
$1.200
|
$3.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
22.000
|
$10.000
|
$7.840
|
$7.000
|
$7.000
|
$6.000
|
$7.200
|
$7.400
|
$7.200
|
$7.500
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$20,000.000
|
$28,309.280
|
$23,000.000
|
$50,000.000
|
$41,950.000
|
$23,200.000
|
$46,600.000
|
$27,000.000
|
$27,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$3,200.180
|
$2,600.000
|
$5,500.000
|
$4,750.000
|
$2,630.000
|
$5,270.000
|
$3,100.000
|
$3,100.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$35,000.000
|
$89,851.160
|
$73,000.000
|
$65,000.000
|
$54,800.000
|
$74,000.000
|
$60,900.000
|
$87,000.000
|
$86,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$300.000
|
$363.100
|
$295.000
|
$385.000
|
$385.000
|
$300.000
|
$427.000
|
$350.000
|
$350.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
4.000
|
$185.000
|
$92.310
|
$75.000
|
$155.000
|
$155.000
|
$75.800
|
$172.000
|
$90.000
|
$90.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
8.000
|
$175.000
|
$104.620
|
$85.000
|
$150.000
|
$150.000
|
$85.900
|
$166.000
|
$100.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,849.000
|
$3.000
|
$2.460
|
$2.000
|
$1.950
|
$1.950
|
$2.000
|
$2.150
|
$2.400
|
$2.400
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
985.000
|
$3.500
|
$2.830
|
$2.300
|
$2.150
|
$2.150
|
$2.300
|
$2.400
|
$2.700
|
$2.700
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$5,000.000
|
$5,046.440
|
$4,100.000
|
$5,000.000
|
$3,750.000
|
$4,140.000
|
$4,160.000
|
$4,900.000
|
$4,800.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
3.000
|
$13,000.000
|
$16,000.890
|
$13,000.000
|
$20,000.000
|
$16,725.000
|
$13,100.000
|
$18,600.000
|
$15,000.000
|
$15,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$14,500.000
|
$17,231.730
|
$14,000.000
|
$22,000.000
|
$17,750.000
|
$14,100.000
|
$19,700.000
|
$17,000.000
|
$16,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$3,000.000
|
$5,145.000
|
$3,500.000
|
$400.000
|
$2,500.000
|
$4,810.000
|
$1,260.000
|
$2,000.000
|
$930.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$1,800.000
|
$2,461.000
|
$2,000.000
|
$300.000
|
$1,000.000
|
$5,800.000
|
$1,680.000
|
$1,000.000
|
$2,000.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
1.000
|
$1,500.000
|
$1,118.500
|
$3,240.000
|
$300.000
|
$500.000
|
$15,600.000
|
$2,730.000
|
$3,500.000
|
$515.000
|
|
|
TREE PROTECTION
|
EA
|
2.000
|
$650.000
|
$336.000
|
$250.000
|
$1,000.000
|
$2,500.000
|
$260.000
|
$1.850
|
$300.000
|
$515.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
4,421.000
|
$95.000
|
$117.600
|
$106.740
|
$110.000
|
$100.000
|
$108.000
|
$108.000
|
$120.000
|
$110.000
|
|
|
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
|
TON
|
1,716.000
|
$95.000
|
$159.040
|
$118.440
|
$150.000
|
$130.000
|
$148.000
|
$149.000
|
$160.000
|
$152.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
1,140.000
|
$150.000
|
$201.600
|
$154.260
|
$180.000
|
$174.000
|
$188.000
|
$187.000
|
$230.000
|
$196.000
|
|
|
BONDING COURSE
|
GAL
|
8,166.000
|
$3.500
|
$5.600
|
$4.340
|
$5.000
|
$5.500
|
$5.050
|
$5.300
|
$5.000
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
130.000
|
$120.000
|
$28.000
|
$154.360
|
$150.000
|
$70.000
|
$93.100
|
$154.000
|
$1,000.000
|
$80.000
|
|
|
ANTENNA (OMNI-DIRECTIONAL)
|
EA
|
1.000
|
$1,250.000
|
$307.710
|
$250.000
|
$1,025.000
|
$1,025.000
|
$250.000
|
$1,140.000
|
$600.000
|
$295.000
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$200.000
|
$168.000
|
$308.720
|
$175.000
|
$175.000
|
$226.000
|
$116.000
|
$300.000
|
$188.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$200.000
|
$195.000
|
$154.360
|
$55.000
|
$75.000
|
$142.000
|
$94.800
|
$500.000
|
$80.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$6,000.000
|
$7,631.200
|
$6,200.000
|
$6,000.000
|
$5,890.000
|
$6,300.000
|
$6,540.000
|
$7,400.000
|
$7,300.000
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
2.000
|
$6,000.000
|
$7,631.200
|
$6,200.000
|
$6,500.000
|
$6,250.000
|
$6,300.000
|
$6,940.000
|
$7,400.000
|
$7,300.000
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$10,000.000
|
$16,000.900
|
$13,000.000
|
$5,500.000
|
$5,200.000
|
$13,100.000
|
$5,770.000
|
$15,000.000
|
$15,300.000
|
|
|
VIVDS CABLING
|
LF
|
705.000
|
$4.000
|
$2.460
|
$2.000
|
$2.650
|
$2.650
|
$2.000
|
$2.950
|
$2.400
|
$2.400
|
|
|
VIVDS TEMPORARY (REMOVE)
|
EA
|
1.000
|
$335.000
|
$2,215.510
|
$1,800.000
|
$2,250.000
|
$2,250.000
|
$1,820.000
|
$2,500.000
|
$2,100.000
|
$2,100.000
|
|
|
VIVDS CABLING (REMOVE)
|
LF
|
705.000
|
$0.500
|
$1.230
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
$2.200
|
$1.200
|
$1.200
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
4.000
|
$3,000.000
|
$1,231.000
|
$2,500.000
|
$300.000
|
$1,000.000
|
$3,500.000
|
$793.000
|
$600.000
|
$2,400.000
|
|
|
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
|
EA
|
3.000
|
$5,000.000
|
$6,152.000
|
$5,500.000
|
$700.000
|
$1,500.000
|
$4,000.000
|
$1,760.000
|
$800.000
|
$4,400.000
|
|
Totals: |
$2,785,377.350
|
$3,199,566.890
|
$3,256,836.160
|
$3,354,985.590
|
$3,641,105.460
|
$3,648,143.100
|
$3,691,021.100
|
$3,945,742.950
|
$3,955,556.700
|