HAYS FM 621 (0987-03-012)

Items: 93

County: HAYS
Length: N/A
Highway: FM 621
District: AUSTIN
Control Number: 0987-03-012
DBE Goal: N/A
Project: STP 2021(806)MM
Guaranty: N/A
Time: 111 WORKING DAYS
Engineer's Estimate: $3,558,837.45
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (9)
E
Engineer's Estimate
$3,558,837.45
$2,961,992.44
Over/Under Est: -16.77% -$596,845.01
Over/Under Est: -6.94% -$246,979.64
Amt Left: 11.81% $349,865.37
$3,312,457.32
Over/Under Est: -6.92% -$246,380.13
Amt Left: 11.83% $350,464.88
Delta: -0.02% -$599.51
Over/Under Est: 5.52% $196,494.29
Amt Left: 26.78% $793,339.30
Delta: -13.37% -$442,874.42
Over/Under Est: 7.33% $260,999.67
Amt Left: 28.96% $857,844.68
Delta: -1.72% -$64,505.38
Over/Under Est: 13.87% $493,671.39
Amt Left: 36.82% $1,090,516.40
Delta: -6.09% -$232,671.72
Over/Under Est: 16.35% $581,699.67
Amt Left: 39.79% $1,178,544.68
Delta: -2.17% -$88,028.28
$4,916,814.75
Over/Under Est: 38.16% $1,357,977.30
Amt Left: 66% $1,954,822.31
Delta: -18.75% -$776,277.63
Over/Under Est: 47.28% $1,682,606.65
Amt Left: 76.96% $2,279,451.66
Delta: -6.60% -$324,629.35

Bid Items & Bid Tabulations

93 Total 0 of 93
HAYS  |  FM 621  |  AUSTIN  |  0987-03-012  |  08/04/2021  |  $3,558,837.45  |  STP 2021(806)MM  |  WIDEN ROAD - ADD LANES  |  111 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
DAN WILLIAMS COMPANY
JORDAN FOSTER CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
LONE STAR SITEWORK, LLC
DIAMOND X CONTRACTING, INC
ALTUS CONSTRUCTION LLC
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 78.000 $3,500.000 $739.260 $1,169.401 $1,500.000 $2,930.000 $510.000 $2,500.000 $900.000 $1,254.080 $500.000
REMOVING CONC (RIPRAP)
SY 194.000 $15.000 $9.990 $19.410 $11.000 $18.000 $21.000 $13.000 $9.000 $25.080 $35.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 329.000 $8.000 $6.660 $10.996 $6.000 $10.000 $8.750 $8.500 $9.000 $25.080 $11.000
REMOVING CONC (HEADWALL)
CY 2.000 $525.000 $183.150 $668.800 $500.000 $4,100.000 $762.000 $7,500.000 $500.000 $1,881.120 $5,730.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 13,691.000 $5.000 $5.870 $8.564 $6.000 $5.750 $9.850 $9.500 $7.000 $7.540 $11.000
EXCAVATION (ROADWAY)
CY 12,958.000 $9.500 $14.550 $17.597 $12.000 $12.500 $16.000 $17.000 $13.000 $18.010 $43.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,019.000 $19.000 $14.550 $11.448 $13.000 $44.000 $10.000 $15.700 $13.000 $15.940 $26.000
FURNISHING AND PLACING TOPSOIL (4")
SY 20,437.000 $1.250 $1.000 $2.433 $1.000 $2.600 $1.300 $3.800 $1.000 $0.910 $3.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 20,437.000 $0.400 $0.400 $0.391 $0.300 $1.100 $0.150 $0.350 $0.330 $0.440 $0.400
DRILL SEEDING (TEMP) (WARM)
SY 10,219.000 $0.150 $0.150 $0.144 $0.200 $0.150 $0.150 $0.230 $0.220 $0.100 $0.250
DRILL SEEDING (TEMP) (COOL)
SY 10,219.000 $0.150 $0.160 $0.144 $0.200 $0.150 $0.150 $0.230 $0.220 $0.100 $0.250
FERTILIZER
TON 1.300 $955.000 $1,661.420 $721.000 $1,400.000 $2,100.000 $1,100.000 $1,610.000 $1,540.000 $1,191.380 $1,700.000
VEGETATIVE WATERING
MG 1,218.000 $20.000 $19.980 $23.076 $8.000 $25.000 $18.500 $50.000 $37.000 $35.840 $45.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 20,437.000 $1.000 $0.980 $0.906 $1.000 $1.200 $1.000 $1.150 $1.100 $1.020 $1.200
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 5,839.000 $48.500 $37.800 $41.583 $40.000 $51.000 $60.000 $57.000 $48.000 $72.730 $87.000
LIME (HYDRATED LIME (SLURRY))
TON 462.000 $175.000 $210.000 $166.535 $165.000 $175.000 $197.000 $196.000 $177.000 $225.730 $225.000
LIME TRT (EXST MATL)(10")
SY 21,021.000 $4.000 $2.280 $2.570 $2.700 $6.500 $4.200 $6.800 $5.000 $9.400 $6.500
PRIME COAT (MULTI OPTION)
GAL 3,992.000 $3.900 $4.060 $5.324 $4.500 $4.500 $4.300 $4.100 $4.000 $3.980 $4.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 600.000 $40.000 $43.380 $54.146 $56.000 $53.000 $51.000 $7.700 $76.000 $79.480 $87.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 420.000 $2.000 $10.730 $16.285 $20.000 $15.000 $5.300 $19.800 $19.000 $18.810 $23.000
CUT & RESTORE ASPH PAVING
SY 32.000 $190.000 $150.000 $65.340 $100.000 $175.000 $235.000 $60.000 $98.000 $101.740 $190.000
CL C CONC (CAP)
CY 14.000 $1,100.000 $1,097.120 $194.220 $300.000 $650.000 $1,125.000 $645.000 $1,400.000 $911.910 $1,820.000
RIPRAP (CONC)(5 IN)
CY 1.000 $560.000 $632.030 $879.750 $1,300.000 $5,000.000 $670.000 $2,070.000 $3,960.000 $752.450 $1,820.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $500.000 $479.040 $616.350 $525.000 $825.000 $590.000 $664.000 $517.000 $439.280 $640.000
CONC BOX CULV (6 FT X 5 FT)
LF 56.000 $500.000 $941.180 $917.390 $700.000 $625.000 $960.000 $932.000 $949.000 $482.840 $1,215.000
RC PIPE (CL III)(18 IN)
LF 827.000 $59.000 $65.880 $94.980 $66.000 $72.000 $65.000 $69.500 $105.000 $54.040 $115.000
RC PIPE (CL III)(24 IN)
LF 41.000 $75.000 $160.340 $121.680 $200.000 $410.000 $160.000 $95.000 $145.000 $164.150 $240.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $4,500.000 $4,931.020 $6,828.500 $8,000.000 $4,600.000 $5,000.000 $6,800.000 $12,650.000 $6,270.400 $17,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $22,800.000 $19,757.030 $25,781.340 $15,500.000 $18,500.000 $20,000.000 $37,800.000 $30,000.000 $20,830.520 $49,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 25.000 $1,685.000 $1,097.120 $1,632.750 $1,300.000 $1,350.000 $1,125.000 $1,975.000 $2,572.600 $1,204.670 $3,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 5.000 $1,900.000 $1,261.860 $2,107.500 $1,650.000 $1,950.000 $1,290.000 $2,275.000 $2,847.600 $2,194.640 $3,300.000
REMOV STR (DRIVEWAY CULVERT)
EA 611.000 $660.000 $0.010 $25.056 $0.100 $0.010 $58.000 $20.000 $11.000 $583.980 $62.000
MOBILIZATION
LS 1.000 $273,000.000 $290,291.740 $331,271.691 $330,000.000 $360,000.000 $377,000.000 $92,600.000 $184,092.720 $476,550.260 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,200.000 $5,087.880 $6,583.264 $17,000.000 $5,700.000 $12,000.000 $3,345.000 $8,000.000 $12,540.800 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 70.000 $30.000 $23.280 $25.647 $22.000 $34.000 $25.000 $25.300 $24.200 $31.090 $27.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 248.000 $30.000 $26.090 $26.677 $23.500 $42.000 $27.000 $27.000 $25.850 $31.590 $29.000
ROCK FILTER DAMS (REMOVE)
LF 318.000 $10.000 $9.890 $6.335 $18.000 $3.400 $20.000 $20.700 $19.800 $9.410 $22.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $21.000 $20.290 $16.480 $18.000 $10.500 $20.000 $20.700 $19.800 $23.300 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.000 $6.360 $6.180 $14.000 $3.400 $16.000 $16.100 $15.400 $7.950 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,430.000 $2.500 $2.140 $2.524 $3.500 $2.500 $4.000 $4.000 $3.850 $2.450 $4.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,430.000 $0.750 $0.460 $0.258 $1.000 $0.300 $1.150 $1.150 $1.100 $0.800 $1.200
CONSTRUCTING DETOURS
SY 2,326.000 $62.000 $41.520 $78.413 $100.000 $95.000 $100.000 $73.000 $54.000 $115.190 $74.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 6,060.000 $30.000 $20.000 $19.520 $30.000 $9.000 $46.000 $20.000 $62.000 $71.880 $86.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 440.000 $35.000 $20.000 $24.670 $50.000 $42.000 $46.000 $20.000 $62.000 $97.580 $86.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 7,400.000 $8.000 $10.000 $9.690 $3.000 $3.750 $8.500 $12.500 $20.000 $11.020 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 600.000 $8.000 $12.000 $11.850 $3.000 $36.000 $8.500 $12.500 $20.000 $11.020 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 6,060.000 $9.000 $8.000 $13.990 $8.000 $10.500 $15.500 $20.000 $28.000 $9.850 $18.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 400.000 $9.000 $8.000 $16.150 $8.000 $23.500 $15.500 $20.000 $28.000 $9.850 $18.000
DRIVEWAYS (CONC)
SY 250.000 $60.000 $66.470 $84.408 $80.000 $81.000 $95.000 $89.500 $102.000 $71.170 $105.000
DRIVEWAYS (ACP)
SY 639.000 $38.000 $35.040 $35.102 $75.000 $67.000 $75.000 $70.000 $61.000 $75.290 $71.000
CONC SIDEWALKS (5")
SY 613.000 $60.000 $49.590 $59.822 $55.000 $70.000 $58.000 $77.000 $70.000 $65.210 $102.000
CURB RAMPS (TY 5)
EA 1.000 $2,400.000 $1,820.130 $2,136.390 $1,800.000 $2,400.000 $2,680.000 $1,955.000 $3,520.000 $3,284.310 $1,900.000
CURB RAMPS (TY 7)
EA 3.000 $1,500.000 $1,820.130 $2,136.390 $1,800.000 $2,550.000 $2,222.000 $1,955.000 $2,475.000 $1,885.380 $1,800.000
MTL W-BEAM GD FEN (TIM POST)
LF 210.000 $25.000 $28.200 $27.347 $30.000 $28.500 $31.000 $31.900 $31.000 $32.480 $34.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $1.700 $1.500 $3.605 $3.000 $1.550 $3.400 $3.400 $3.300 $3.600 $3.600
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 2.000 $2,700.000 $3,188.000 $2,909.750 $3,250.000 $3,200.000 $3,400.000 $3,430.000 $3,286.800 $3,762.240 $3,600.000
CHAIN LINK FENCE (REMOVE)
LF 795.000 $4.220 $2.500 $8.598 $5.500 $6.250 $6.750 $20.000 $11.000 $5.770 $36.000
WIRE FENCE (TY B)
LF 770.000 $20.000 $15.000 $20.855 $30.000 $35.000 $22.000 $21.800 $20.900 $32.620 $23.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $250.000 $298.000 $261.084 $300.000 $260.000 $335.000 $313.400 $627.000 $225.040 $330.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $480.000 $578.000 $639.033 $700.000 $640.000 $645.000 $779.000 $1,400.000 $566.500 $820.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $585.000 $672.000 $748.820 $750.000 $730.000 $750.000 $833.000 $1,540.000 $693.880 $880.000
REMOVE SM RD SN SUP&AM
EA 20.000 $90.000 $93.000 $88.508 $100.000 $87.000 $104.000 $98.000 $195.000 $99.770 $103.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 26.000 $260.000 $305.000 $288.287 $350.000 $280.000 $340.000 $402.000 $720.000 $236.770 $425.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 57,140.000 $0.150 $0.200 $0.206 $0.200 $0.260 $0.220 $0.300 $0.290 $0.450 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 48,839.000 $0.150 $0.200 $0.206 $0.200 $0.260 $0.220 $0.300 $0.290 $0.250 $0.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 940.000 $0.800 $0.800 $0.824 $0.800 $0.720 $0.900 $0.900 $0.880 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 124.000 $6.000 $7.500 $7.725 $7.500 $0.620 $8.100 $8.050 $7.700 $9.410 $8.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $145.000 $75.000 $77.250 $75.000 $127.000 $85.000 $150.000 $143.000 $94.060 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $165.000 $80.000 $82.400 $80.000 $170.000 $87.000 $173.000 $165.000 $100.330 $180.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 518.000 $3.750 $4.000 $4.120 $4.000 $3.100 $4.500 $3.450 $3.300 $5.020 $3.650
REFL PAV MRK TY II (W) 4" (SLD)
LF 15,525.000 $0.150 $0.110 $0.113 $0.110 $0.130 $0.120 $0.200 $0.200 $0.140 $0.200
REFL PAV MRK TY II (W) 8" (SLD)
LF 940.000 $4.000 $0.300 $0.309 $0.300 $0.260 $0.350 $0.600 $0.550 $0.380 $0.600
REFL PAV MRK TY II (W) 24" (SLD)
LF 124.000 $3.000 $2.500 $2.575 $2.500 $2.050 $3.000 $3.400 $3.300 $3.140 $3.700
REFL PAV MRK TY II (W) (ARROW)
EA 7.000 $65.000 $40.000 $41.200 $40.000 $46.000 $45.000 $77.000 $73.700 $50.160 $81.000
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $80.000 $45.000 $46.350 $45.000 $46.000 $50.000 $80.000 $77.000 $56.430 $85.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 119,308.000 $0.150 $0.070 $0.072 $0.070 $0.010 $0.080 $0.200 $0.200 $0.090 $0.200
REFL PAV MRK TY II (Y) 12" (SLD)
LF 518.000 $1.500 $1.250 $1.288 $1.250 $1.400 $1.500 $1.700 $1.650 $1.540 $1.800
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 15,525.000 $0.400 $0.350 $0.361 $0.350 $0.360 $0.400 $0.500 $0.440 $0.440 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,308.000 $0.400 $0.370 $0.381 $0.370 $0.360 $0.400 $0.500 $0.440 $0.460 $0.500
REFL PAV MRKR TY II-A-A
EA 596.000 $4.000 $3.000 $3.090 $3.000 $4.150 $3.500 $4.600 $4.400 $3.760 $5.000
TRAFFIC BUTTON TY I-C
EA 41.000 $4.000 $5.000 $5.150 $5.000 $4.100 $5.500 $11.500 $11.000 $6.270 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 41,000.000 $0.100 $0.280 $0.288 $0.280 $0.420 $0.330 $0.600 $0.580 $0.350 $0.600
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $3,500.000 $5,500.000 $5,665.000 $7,500.000 $5,200.000 $6,000.000 $8,170.000 $5,632.000 $6,897.440 $5,500.000
D-GR HMA TY-B PG64-22
TON 4,890.000 $70.000 $66.540 $73.659 $85.000 $93.000 $86.000 $110.000 $110.000 $99.070 $125.000
D-GR HMA TY-B PG76-22 (LEVEL-UP)
TON 490.000 $70.000 $71.790 $91.857 $116.000 $114.000 $104.000 $121.000 $121.000 $136.690 $137.000
D-GR HMA TY-D PG76-22
TON 3,916.000 $76.500 $75.990 $75.443 $94.000 $112.000 $93.000 $121.000 $121.000 $109.730 $137.000
UNDERSEAL COURSE
GAL 2,070.000 $2.800 $3.380 $3.793 $4.500 $4.500 $5.100 $3.850 $4.000 $5.640 $4.350
ADJUST OF WTR VLVE COVRS AND VLVE STCKS
EA 3.000 $500.000 $1,200.000 $540.000 $1,500.000 $1,140.000 $3,300.000 $300.000 $600.000 $6,270.400 $1,900.000
ADJUSTMENT OF WASTEWATER MANHOLES
EA 1.000 $2,700.000 $2,000.000 $5,400.000 $3,000.000 $1,150.000 $3,300.000 $950.000 $3,000.000 $6,270.400 $2,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 570.000 $81.000 $150.000 $175.375 $100.000 $85.000 $57.000 $200.000 $220.000 $62.700 $120.000
TMA (MOBILE OPERATION)
DAY 3.000 $240.000 $750.000 $1,571.400 $550.000 $775.000 $169.000 $3,500.000 $550.000 $1,824.690 $900.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,600.000 $8,000.000 $2,575.000 $400.000 $725.000 $3,500.000 $4,000.000 $1,500.000 $5,016.320 $1,940.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 10.000 $1,800.000 $9,000.000 $2,575.000 $1,000.000 $725.000 $3,500.000 $5,000.000 $1,500.000 $5,016.320 $2,900.000
Totals: $3,558,837.450 $2,961,992.446 $3,311,857.967 $3,312,457.320 $3,755,331.740 $3,819,837.120 $4,052,508.840 $4,140,537.120 $4,916,814.754 $5,241,444.100