Show Job Controls
Bid Cobra

HAYS CS (0914-33-079)

Items: 56

County: HAYS
Length: N/A
Highway: CS
District: AUSTIN
Control Number: 0914-33-079
DBE Goal: N/A
Project: STP 2019(349)TAPS
Guaranty: N/A
Time: 30 WORKING DAYS
Engineer's Estimate: $423,347.00
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: PEDESTRIAN SIDEWALKS AND CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$423,347.00
Over/Under Est: -6.27% -$26,543.85
$407,559.00
Over/Under Est: -3.73% -$15,788.00
Amt Left: 2.71% $10,755.85
Over/Under Est: 1.12% $4,743.90
Amt Left: 7.88% $31,287.75
Delta: -5.04% -$20,531.90
$455,044.35
Over/Under Est: 7.49% $31,697.35
Amt Left: 14.68% $58,241.20
Delta: -6.30% -$26,953.45
Over/Under Est: 17.64% $74,658.00
Amt Left: 25.5% $101,201.85
Delta: -9.44% -$42,960.65
Over/Under Est: 35.57% $150,565.50
Amt Left: 44.63% $177,109.35
Delta: -15.24% -$75,907.50
Over/Under Est: 40.05% $169,571.00
Amt Left: 49.42% $196,114.85
Delta: -3.31% -$19,005.50

Bid Items & Bid Tabulations

56 Total 0 of 56
HAYS  |  CS  |  AUSTIN  |  0914-33-079  |  07/09/2020  |  $423,347.00  |  STP 2019(349)TAPS  |  PEDESTRIAN SIDEWALKS AND CURB RAMPS  |  30 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A GREATER AUSTIN DEVELOPMENT COMPANY, INC.
MAC, INC.
ENCINO LANDSCAPE, INC.
SB CONTRACTORS LLC
SJ&J CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 15.000 $1,500.000 $847.000 $800.000 $3,852.000 $2,500.000 $1,000.000 $2,500.000 $692.000
REMOVING CONC (CURB AND GUTTER)
LF 12.000 $10.000 $42.000 $10.000 $20.000 $38.110 $25.000 $20.000 $27.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 30.000 $30.000 $17.000 $27.000 $20.000 $76.220 $25.000 $20.000 $35.400
EXCAVATION (SPECIAL)
CY 65.000 $40.000 $43.000 $40.000 $65.000 $70.360 $70.000 $20.000 $88.700
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 67.000 $30.000 $34.000 $25.000 $20.000 $62.750 $35.000 $30.000 $107.000
FURNISHING AND PLACING TOPSOIL (4")
SY 940.000 $3.000 $5.000 $3.000 $1.000 $5.600 $8.000 $10.000 $6.500
BLOCK SODDING
SY 248.000 $6.000 $6.000 $10.000 $3.000 $5.770 $6.000 $6.000 $9.100
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 692.000 $0.500 $1.000 $2.000 $0.100 $0.830 $1.000 $2.000 $0.270
BROADCAST SEED (TEMP) (WARM)
SY 347.000 $0.500 $2.000 $2.000 $0.100 $2.160 $1.000 $2.000 $2.900
VEGETATIVE WATERING
MG 17.000 $35.000 $56.000 $50.000 $10.000 $57.680 $10.000 $100.000 $101.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 692.000 $1.750 $1.000 $3.000 $2.000 $1.380 $6.000 $10.000 $3.350
PRIME COAT (MULTI OPTION)
GAL 38.000 $10.000 $80.000 $10.000 $5.000 $13.850 $40.000 $8.000 $13.300
D-GR HMA(SQ) TY-B PG64-22
TON 70.000 $145.000 $245.000 $200.000 $120.000 $115.350 $150.000 $140.000 $229.000
TACK COAT
GAL 13.000 $10.000 $80.000 $20.000 $4.000 $23.070 $40.000 $8.000 $25.000
CEM STABIL BKFL
CY 16.000 $175.000 $176.000 $100.000 $150.000 $129.770 $210.000 $350.000 $250.000
DRILL SHAFT (30 IN)
LF 60.000 $285.000 $400.000 $450.000 $300.000 $405.870 $350.000 $325.000 $481.000
CL C CONC (ABUT)
CY 15.500 $1,000.000 $1,300.000 $950.000 $800.000 $1,015.880 $1,500.000 $1,500.000 $1,870.000
CL C CONC (RAIL FOUNDATION)
CY 7.000 $700.000 $995.000 $900.000 $500.000 $1,009.420 $1,000.000 $1,500.000 $720.000
REINF CONC SLAB
SF 720.000 $25.000 $11.000 $15.000 $20.000 $20.070 $25.000 $20.000 $33.400
RIPRAP (CONC)(5 IN)
CY 2.000 $560.000 $625.000 $500.000 $500.000 $1,004.150 $1,000.000 $650.000 $1,000.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 56.000 $175.000 $175.000 $150.000 $150.000 $190.490 $180.000 $185.000 $181.000
STR STEEL (MISC NON - BRIDGE)
LB 210.000 $11.000 $25.000 $18.000 $25.000 $13.690 $25.000 $20.000 $22.700
RAIL (HANDRAIL)(TY F)
LF 23.000 $140.000 $179.000 $200.000 $130.000 $203.020 $190.000 $185.000 $268.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 48.000 $60.000 $194.000 $150.000 $80.000 $187.340 $250.000 $200.000 $224.000
RAIL (TY PR11)
LF 28.900 $155.000 $141.000 $135.000 $130.000 $149.960 $150.000 $185.000 $189.000
ARMOR JOINT (SEALED)
LF 16.000 $155.000 $316.000 $100.000 $100.000 $242.880 $200.000 $1,000.000 $303.000
CONC BOX CULV (6.33 FT X 2 FT)(CIP)
LF 2.000 $700.000 $758.000 $1,000.000 $2,000.000 $1,600.000 $1,000.000 $1,000.000 $1,850.000
MOBILIZATION
LS 1.000 $34,500.000 $40,000.000 $25,000.000 $40,000.000 $45,000.000 $70,000.000 $50,000.000 $43,400.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,000.000 $2,500.000 $2,500.000 $7,999.000 $4,000.000 $5,000.000 $8,500.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 85.000 $35.000 $25.000 $50.000 $50.000 $25.950 $18.000 $30.000 $39.300
ROCK FILTER DAMS (REMOVE)
LF 85.000 $10.000 $17.000 $10.000 $10.000 $17.020 $9.000 $15.000 $8.400
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,178.000 $5.000 $4.000 $7.000 $5.000 $4.040 $8.000 $9.000 $6.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,178.000 $1.000 $1.000 $1.000 $1.000 $1.160 $4.000 $5.000 $0.670
CONC CURB (MONO) (TY II)
LF 32.000 $40.000 $19.000 $25.000 $20.000 $71.570 $35.000 $30.000 $45.000
CONC CURB & GUTTER (TY II)
LF 744.000 $35.000 $21.000 $20.000 $25.000 $27.010 $40.000 $35.000 $51.300
CONC SIDEWALKS (5")
SY 713.000 $60.000 $60.000 $54.000 $60.000 $67.750 $70.000 $55.000 $98.600
CURB RAMPS (TY 7)
EA 3.000 $2,000.000 $1,576.000 $1,500.000 $1,500.000 $1,488.300 $1,700.000 $2,500.000 $2,400.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $1,794.000 $2,000.000 $2,000.000 $2,076.310 $1,700.000 $1,850.000 $2,130.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,400.000 $1,267.000 $1,500.000 $1,200.000 $1,303.470 $1,200.000 $1,850.000 $1,510.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,100.000 $1,206.000 $1,500.000 $1,000.000 $50.750 $1,500.000 $1,850.000 $1,430.000
REMOVE METAL BEAM GUARD FENCE
LF 40.000 $3.000 $11.000 $10.000 $3.000 $11.530 $6.000 $3.000 $13.300
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $280.000 $500.000 $250.000 $230.700 $900.000 $1,500.000 $333.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,800.000 $3,045.000 $3,300.000 $2,700.000 $3,709.680 $2,900.000 $2,850.000 $3,620.000
ALUMINUM SIGNS (TY A)
SF 12.500 $50.000 $45.000 $15.000 $30.000 $83.050 $30.000 $30.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $650.000 $662.000 $600.000 $500.000 $680.570 $500.000 $850.000 $967.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $20.000 $15.000 $25.000 $30.000 $15.000 $40.000 $100.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $38.000 $30.000 $30.000 $30.000 $31.140 $90.000 $100.000 $31.100
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 48.000 $20.000 $22.000 $24.000 $7.000 $23.070 $40.000 $20.000 $24.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 48.000 $20.000 $17.000 $16.000 $4.000 $17.300 $40.000 $20.000 $8.000
PAV SURF PREP FOR MRK (24")
LF 48.000 $10.000 $11.000 $10.000 $1.000 $11.530 $5.000 $20.000 $2.650
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,250.000 $3,925.000 $8,000.000 $9,999.000 $11,362.050 $7,000.000 $12,500.000 $9,560.000
LANDSCAPE AMENITY (TY 1)
EA 3.000 $3,500.000 $693.000 $2,000.000 $1,200.000 $1,614.910 $3,000.000 $3,000.000 $2,080.000
LANDSCAPE AMENITY (BENCH)
EA 3.000 $5,000.000 $919.250 $2,000.000 $1,200.000 $1,384.210 $1,500.000 $3,000.000 $2,980.000
PREFAB PED STL TRUSS BRG SPAN (90 FT)
EA 1.000 $100,000.000 $85,000.000 $116,000.000 $90,000.000 $88,253.770 $100,000.000 $135,000.000 $152,200.000
ADJUSTMENT OF WASTEWATER MANHOLES
EA 3.000 $1,000.000 $2,804.000 $1,000.000 $1,000.000 $865.130 $500.000 $2,500.000 $2,610.000
TMA (MOBILE OPERATION)
DAY 10.000 $275.000 $380.000 $400.000 $200.000 $403.730 $150.000 $550.000 $133.000
Totals: $423,347.000 $396,803.150 $407,559.000 $428,090.900 $455,044.359 $498,005.000 $573,912.500 $592,918.000