HAYS RM 967 (0016-16-028)

Items: 123

County: HAYS
Length: N/A
Highway: RM 967
District: AUSTIN
Control Number: 0016-16-028
DBE Goal: N/A
Project: F 2022(466)
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $8,491,533.15
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
MARK BAUMANN
SHANE SWIMM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,491,533.15
$8,474,686.36
Over/Under Est: -0.2% -$16,846.79
Over/Under Est: 1.12% $95,142.52
Amt Left: 1.32% $111,989.31
Over/Under Est: 4.74% $402,876.85
Amt Left: 4.95% $419,723.64
Delta: -3.58% -$307,734.33
Over/Under Est: 8.54% $725,304.70
Amt Left: 8.76% $742,151.49
Delta: -3.63% -$322,427.85
Over/Under Est: 31.53% $2,677,575.35
Amt Left: 31.79% $2,694,422.14
Delta: -21.18% -$1,952,270.65
Subcontractor Percentage Amount
RUCOBA & MAYA CONSTRUCTION, LLC 19.90% $1,779,900.24
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 3.84% $343,458.14
A K FUQUAY CONSTRUCTION 1.54% $137,741.02
D. I. J. CONSTRUCTION, INC. 1.32% $118,063.73
ROADWAY SPECIALTIES, INC. 0.96% $85,864.53
FLASHER EQUIPMENT COMPANY 0.68% $60,820.71
MURRAY CONSTRUCTION 0.24% $21,466.13
BEAVER BOYS SERVICES LLC 0.15% $13,416.33
Total: 28.63% $2,560,730.83

Bid Items & Bid Tabulations

123 Total 0 of 123
HAYS  |  RM 967  |  AUSTIN  |  0016-16-028  |  04/04/2023  |  $8,491,533.15  |  F 2022(466)  |  REHAB EXIST ROADWAY  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
JOE BLAND CONSTRUCTION, L.P.
JORDAN FOSTER CONSTRUCTION, LLC
ACME BRIDGE COMPANY, INC.
AUSTIN UNDERGROUND INCORPORATED
PREPARING ROW
STA 119.810 $1,500.000 $1,431.910 $1,100.000 $6,440.000 $2,210.000 $400.000
REMOVING CONC (SIDEWALKS)
SY 84.000 $25.000 $21.100 $25.220 $23.000 $30.000 $44.000
REMOVING CONC (DRIVEWAYS)
SY 1,174.000 $20.000 $21.100 $25.220 $23.000 $15.300 $22.000
REMOVING CONC (CURB AND GUTTER)
LF 140.000 $16.000 $21.100 $7.900 $15.000 $7.890 $26.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 42,801.000 $6.700 $11.440 $5.150 $9.500 $6.300 $13.000
EXCAVATION (ROADWAY)
CY 16,469.000 $19.000 $28.000 $28.300 $20.000 $18.100 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,683.000 $25.000 $24.500 $12.900 $16.000 $16.900 $28.000
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
CY 12,441.000 $50.000 $22.300 $48.630 $20.000 $25.600 $14.000
FURNISHING AND PLACING TOPSOIL (4")
SY 42,050.000 $4.000 $1.600 $1.500 $2.600 $2.400 $3.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 42,050.000 $0.230 $0.390 $0.310 $0.310 $0.370 $0.400
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 21,027.000 $0.350 $0.340 $0.310 $0.190 $0.260 $0.300
VEGETATIVE WATERING
MG 707.800 $65.000 $21.000 $33.140 $33.000 $43.400 $23.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 42,050.000 $2.900 $1.850 $4.970 $2.350 $2.050 $2.500
SPRINKLING (DUST CONTROL)
MG 400.000 $7.000 $21.000 $33.140 $23.000 $43.400 $31.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 12,256.000 $75.000 $60.460 $58.000 $55.000 $71.120 $83.000
ASPH (RC-250)
GAL 17,383.000 $12.000 $5.480 $7.970 $6.250 $7.600 $9.500
AGGR (TY-D GR-5)
CY 360.000 $150.000 $95.810 $1,024.520 $590.000 $982.000 $180.000
CEM STABIL BKFL
CY 396.000 $200.000 $284.840 $224.260 $180.000 $329.000 $320.000
CUT & RESTORE ASPH PAVING
SY 246.000 $150.000 $207.590 $130.910 $58.000 $108.000 $160.000
TRENCH EXCAVATION PROTECTION
LF 223.000 $12.000 $174.370 $6.270 $200.000 $13.500 $13.000
TEMPORARY SPL SHORING
SF 952.000 $45.000 $59.850 $35.150 $23.000 $25.700 $6.500
CL C CONC (CAP)
CY 3.000 $2,000.000 $2,935.980 $666.970 $1,128.000 $1,420.000 $1,700.000
RIPRAP (CONC)(5 IN)
CY 486.000 $600.000 $659.460 $600.000 $615.000 $672.000 $510.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 76.000 $190.000 $214.260 $204.370 $370.000 $300.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 130.000 $570.000 $713.200 $635.210 $635.000 $582.000 $660.000
CMP (GAL STL 18 IN)
LF 61.000 $110.000 $111.740 $176.570 $87.000 $100.000 $180.000
CMP (GAL STL 24 IN)
LF 22.000 $150.000 $178.960 $377.300 $110.000 $114.000 $330.000
CMP AR (GAL STL DES 7)
LF 32.000 $400.000 $443.360 $511.360 $360.000 $287.000 $500.000
CONC BOX CULV (3 FT X 3 FT)
LF 128.000 $400.000 $586.930 $433.860 $390.000 $508.000 $1,500.000
CONC BOX CULV (5 FT X 5 FT)
LF 124.000 $500.000 $916.700 $633.990 $625.000 $749.000 $1,700.000
CONC BOX CULV (7 FT X 4 FT)
LF 64.000 $730.000 $1,168.990 $849.180 $890.000 $1,020.000 $2,000.000
CONC BOX CULV (8 FT X 5 FT)
LF 126.000 $1,100.000 $1,348.130 $1,004.480 $1,060.000 $1,150.000 $2,400.000
CONC BOX CULV (7 FT X 2 FT)(EXTEND)
LF 24.000 $800.000 $1,545.040 $777.240 $970.000 $1,020.000 $2,000.000
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
LF 8.000 $625.000 $2,723.010 $1,299.390 $2,700.000 $1,620.000 $4,000.000
RC PIPE (CL III)(18 IN)
LF 1,593.000 $110.000 $100.050 $95.450 $74.000 $77.500 $160.000
RC PIPE (CL III)(24 IN)
LF 1,222.000 $110.000 $126.060 $102.540 $92.000 $93.800 $200.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 68.000 $290.000 $278.110 $281.150 $240.000 $305.000 $460.000
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,000.000 $9,194.990 $22,301.540 $16,000.000 $8,660.000 $16,000.000
HEADWALL (CH - PW - A - 0) (DES= 7)
EA 1.000 $15,000.000 $17,395.520 $14,914.640 $29,000.000 $18,100.000 $15,000.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $7,500.000 $8,251.580 $14,914.640 $17,239.430 $15,700.000 $8,500.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $50,000.000 $34,141.060 $32,022.710 $56,000.000 $37,900.000 $47,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $17,000.000 $11,005.780 $23,050.830 $26,000.000 $20,500.000 $19,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 5.000 $26,000.000 $12,107.460 $23,052.050 $34,000.000 $20,300.000 $37,000.000
SET (TY I)(S= 7 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $14,000.000 $9,904.100 $12,425.080 $17,000.000 $18,600.000 $7,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 45.000 $1,300.000 $1,541.250 $1,923.660 $1,550.000 $2,230.000 $3,300.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,700.000 $1,751.670 $3,756.190 $1,800.000 $2,360.000 $5,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 31.000 $2,000.000 $2,202.260 $2,905.430 $2,100.000 $2,630.000 $3,300.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 2.000 $4,000.000 $3,854.780 $8,337.670 $4,000.000 $9,660.000 $3,000.000
REMOV STR (RET WALL)
LF 7.000 $40.000 $141.020 $655.750 $2,200.000 $434.000 $300.000
REMOV STR (SMALL)
EA 37.000 $900.000 $1,727.240 $1,057.660 $1,400.000 $999.000 $350.000
MOBILIZATION
LS 1.000 $600,000.000 $838,831.260 $72,130.430 $860,000.000 $790,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $3,500.000 $7,500.000 $3,586.640 $3,800.000 $2,690.000 $7,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 136.000 $36.000 $150.970 $48.770 $42.000 $39.200 $46.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 50.000 $40.000 $90.220 $55.240 $58.000 $47.600 $56.000
ROCK FILTER DAMS (REMOVE)
LF 186.000 $19.000 $42.860 $22.090 $7.000 $10.600 $13.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $23.000 $54.030 $55.240 $27.000 $31.800 $38.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $12.000 $18.340 $22.090 $6.350 $10.600 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,556.000 $4.500 $4.490 $3.870 $3.750 $3.750 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,556.000 $2.000 $1.010 $0.840 $0.300 $0.530 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 353.000 $7.000 $9.900 $3.870 $7.350 $6.900 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 353.000 $2.000 $2.520 $0.840 $0.950 $1.050 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 17.000 $4,000.000 $19,669.090 $2,131.460 $0.010 $15,000.000 $7,100.000
CONC CURB & GUTTER (TY II)
LF 217.000 $35.000 $33.050 $26.910 $31.000 $28.200 $55.000
INTERSECTIONS (ACP)
SY 1,137.000 $60.000 $62.700 $67.160 $110.000 $113.000 $170.000
DRIVEWAYS (CONC)
SY 1,193.000 $100.000 $104.990 $92.170 $92.000 $89.200 $110.000
DRIVEWAYS (ACP)
SY 2,225.000 $60.000 $62.700 $66.020 $93.000 $111.000 $100.000
TURNOUTS (ACP)
SY 65.000 $110.000 $101.200 $133.190 $200.000 $176.000 $360.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,362.500 $30.000 $25.350 $32.150 $25.000 $26.800 $29.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,550.000 $1,378.170 $1,903.430 $1,400.000 $1,460.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $5.000 $4.000 $5.580 $4.250 $4.250 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,400.000 $3,347.190 $4,026.710 $3,500.000 $3,540.000 $3,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $340.000 $355.470 $281.700 $375.000 $376.000 $440.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 9.000 $290.000 $267.690 $458.460 $380.000 $439.000 $630.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $350.000 $321.230 $469.510 $440.000 $450.000 $600.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 4.000 $600.000 $535.390 $774.410 $530.000 $742.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $790.000 $556.800 $897.030 $830.000 $859.000 $940.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $800.000 $637.110 $953.370 $910.000 $913.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $663.880 $901.450 $990.000 $864.000 $1,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $829.850 $1,187.570 $1,050.000 $1,140.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 25.000 $850.000 $449.720 $734.640 $700.000 $704.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 1.000 $900.000 $530.030 $884.380 $780.000 $847.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 33.000 $180.000 $53.540 $119.310 $124.000 $114.000 $130.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 35,095.000 $0.400 $0.250 $0.270 $0.270 $0.250 $0.800
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,635.000 $0.900 $0.340 $0.750 $0.370 $0.720 $1.200
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 498.000 $6.500 $4.300 $5.520 $4.700 $5.300 $7.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 16.000 $85.000 $151.000 $82.850 $165.000 $79.400 $260.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 1.000 $300.000 $250.000 $193.330 $272.000 $185.000 $430.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 12.000 $110.000 $151.000 $93.900 $165.000 $90.000 $260.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 438.000 $0.500 $0.250 $0.280 $0.270 $0.260 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 85,220.000 $0.500 $0.250 $0.270 $0.270 $0.250 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 664.000 $1.500 $1.600 $1.100 $1.500 $1.950 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,796.000 $1.400 $1.600 $1.100 $1.500 $1.950 $0.700
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 52.000 $1.500 $1.060 $2.210 $1.150 $2.100 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,880.000 $1.500 $1.060 $1.930 $1.150 $1.850 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 30.000 $10.000 $10.000 $10.830 $11.000 $10.400 $17.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 24.000 $200.000 $250.000 $160.180 $270.000 $153.000 $430.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $210.000 $250.000 $193.330 $270.000 $185.000 $430.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $650.000 $777.000 $546.840 $850.000 $524.000 $1,300.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 22,917.000 $0.400 $0.250 $0.270 $0.270 $0.250 $0.400
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,880.000 $0.700 $0.430 $0.610 $0.470 $0.580 $0.700
REFL PAV MRK TY II (W) 24" (SLD)
LF 30.000 $5.000 $4.300 $3.540 $4.700 $3.400 $7.500
REFL PAV MRK TY II (W) (ARROW)
EA 24.000 $70.000 $77.000 $66.280 $84.000 $63.500 $130.000
REFL PAV MRK TY II (W) (WORD)
EA 14.000 $90.000 $77.000 $71.810 $84.000 $68.800 $130.000
REFL PAV MRK TY II (W) (RR XING)
EA 1.000 $300.000 $250.000 $165.710 $274.000 $159.000 $430.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,703.000 $0.200 $0.340 $0.280 $0.370 $0.260 $0.600
REFL PAV MRK TY II (Y) 6" (SLD)
LF 27,348.000 $0.400 $0.250 $0.270 $0.270 $0.250 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,378.000 $0.700 $0.770 $0.710 $0.850 $0.680 $1.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,703.000 $0.700 $0.770 $0.840 $0.850 $0.800 $1.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,348.000 $0.700 $0.770 $0.700 $0.850 $0.670 $1.500
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 19,539.000 $1.300 $1.600 $1.220 $1.750 $1.150 $3.000
REFL PAV MRKR TY I-C
EA 112.000 $6.500 $5.200 $7.460 $5.700 $7.100 $9.000
REFL PAV MRKR TY II-A-A
EA 1,902.000 $6.000 $5.200 $6.240 $5.700 $6.000 $9.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 2,700.000 $110.000 $93.700 $125.220 $115.000 $119.990 $150.000
D-GR HMA TY-C PG76-22
TON 9,622.000 $90.000 $104.700 $161.650 $130.000 $155.000 $170.000
TOM-C PG76-22 SAC-B
TON 3,572.000 $175.000 $130.000 $168.480 $148.000 $161.000 $250.000
BONDING COURSE
GAL 4,984.000 $4.500 $4.090 $4.720 $4.400 $4.550 $7.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 55,990.000 $1.600 $1.750 $5.610 $1.550 $2.780 $3.700
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $10,000.000 $4,971.240 $9,400.000 $11,100.000 $27,000.000
TMA (STATIONARY)
DAY 15.000 $250.000 $500.000 $662.830 $850.000 $142.000 $1,200.000
TMA (MOBILE OPERATION)
DAY 10.000 $260.000 $1,000.000 $204.370 $850.000 $550.360 $1,800.000
PORTABLE ROADWAY ILLUMINATION
DAY 275.000 $1,300.000 $75.000 $204.370 $150.000 $79.350 $500.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,800.000 $1,500.000 $1,215.190 $1,130.000 $2,120.000 $1,500.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 5.000 $4,000.000 $3,500.000 $6,075.960 $1,130.000 $3,030.000 $2,800.000
Totals: $8,491,533.150 $8,474,686.372 $8,586,675.677 $8,894,410.000 $9,216,837.850 $11,169,108.500