PREPARING ROW
|
STA
|
47.000
|
$3,750.000
|
$1,615.050
|
$15,825.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
218.000
|
$9.320
|
$13.320
|
$14.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
337.000
|
$15.450
|
$13.320
|
$14.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,643.000
|
$15.500
|
$13.320
|
$19.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
2,117.000
|
$5.600
|
$8.940
|
$7.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
344.000
|
$10.100
|
$9.990
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
532.000
|
$7.350
|
$8.940
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
902.000
|
$4.130
|
$7.710
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
11,000.000
|
$6.000
|
$7.710
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
5,014.000
|
$6.720
|
$12.090
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,867.000
|
$9.100
|
$16.650
|
$17.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
2,296.000
|
$70.000
|
$30.660
|
$26.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
25,626.000
|
$10.500
|
$19.710
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,897.000
|
$1.520
|
$1.750
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
18,572.000
|
$3.500
|
$3.200
|
$5.490
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
16,897.000
|
$0.210
|
$0.240
|
$0.220
|
|
|
FERTILIZER
|
AC
|
4.000
|
$1,200.000
|
$453.430
|
$375.000
|
|
|
VEGETATIVE WATERING
|
MG
|
691.000
|
$17.000
|
$16.650
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,867.000
|
$0.970
|
$0.700
|
$2.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
14,705.000
|
$1.350
|
$1.280
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,296.000
|
$63.000
|
$43.790
|
$53.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
2,013.000
|
$40.000
|
$43.790
|
$68.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,449.000
|
$3.890
|
$4.200
|
$4.250
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
40.000
|
$110.000
|
$99.270
|
$135.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
747.000
|
$150.000
|
$99.270
|
$130.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
48.000
|
$120.000
|
$95.070
|
$115.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
1,005.000
|
$116.480
|
$95.070
|
$115.000
|
|
|
TACK COAT
|
GAL
|
737.000
|
$4.870
|
$3.490
|
$3.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
54,700.000
|
$2.200
|
$0.580
|
$1.450
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
1,307.000
|
$7.000
|
$7.530
|
$4.750
|
|
|
CEM STABIL BKFL
|
CY
|
1,664.000
|
$125.000
|
$124.400
|
$112.000
|
|
|
CUT & RESTORING PAV
|
SY
|
117.000
|
$160.000
|
$232.550
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,673.000
|
$5.000
|
$8.230
|
$4.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
10,926.000
|
$24.700
|
$17.720
|
$30.750
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
660.000
|
$200.000
|
$203.000
|
$193.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$138.500
|
$200.000
|
$220.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
14.000
|
$183.260
|
$270.000
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
36.000
|
$380.370
|
$465.000
|
$520.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
21.000
|
$500.000
|
$695.000
|
$800.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
150.000
|
$220.000
|
$340.000
|
$370.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
286.000
|
$450.000
|
$490.000
|
$450.000
|
|
|
CL F CONC (FOOTING)
|
CY
|
421.000
|
$700.000
|
$550.000
|
$500.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
29,490.000
|
$53.000
|
$47.000
|
$57.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
302.000
|
$475.000
|
$440.990
|
$490.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
48.000
|
$449.450
|
$472.490
|
$570.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
57.000
|
$460.000
|
$472.490
|
$530.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,979.830
|
$65.000
|
$49.500
|
$85.000
|
|
|
RAIL (TY PR11)
|
LF
|
2,054.000
|
$100.000
|
$58.530
|
$65.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
509.000
|
$250.000
|
$243.600
|
$350.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
892.000
|
$245.490
|
$254.720
|
$260.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
217.000
|
$61.240
|
$125.320
|
$145.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,288.000
|
$75.260
|
$107.510
|
$132.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,221.000
|
$105.000
|
$92.310
|
$166.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
660.000
|
$150.000
|
$124.850
|
$135.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
821.000
|
$177.740
|
$166.850
|
$213.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
7.000
|
$4,051.010
|
$4,938.600
|
$5,800.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$5,542.900
|
$5,397.870
|
$6,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
6.000
|
$5,100.000
|
$5,598.240
|
$7,700.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
4.000
|
$5,900.000
|
$6,342.680
|
$7,200.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
10.000
|
$7,855.280
|
$6,928.880
|
$8,000.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
3.000
|
$5,500.000
|
$6,660.210
|
$8,000.000
|
|
|
INLET (COMPL)(PSL)(SL)(4FTX4FT)
|
EA
|
3.000
|
$3,382.900
|
$4,742.090
|
$6,300.000
|
|
|
INLET (COMPL)(PSL)(SL)(6FTX6FT)
|
EA
|
5.000
|
$4,059.480
|
$9,815.890
|
$9,600.000
|
|
|
INLET (COMPL)(PAZD)(SL)(4FTX4FT)
|
EA
|
6.000
|
$3,860.000
|
$5,338.740
|
$4,300.000
|
|
|
INLET (COMPL)(TY MSE2)
|
EA
|
29.000
|
$4,500.000
|
$6,176.200
|
$4,700.000
|
|
|
JUNCT BOX (COMPL)(JB)(3FT X 3FT)(FTW)
|
EA
|
29.000
|
$2,220.960
|
$3,961.980
|
$3,000.000
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
6.000
|
$2,848.000
|
$3,750.170
|
$3,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (P)
|
EA
|
1.000
|
$5,501.210
|
$12,436.320
|
$20,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$793.000
|
$883.160
|
$1,200.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$10,000.000
|
$857.500
|
$350.000
|
|
|
REMOV STR (PIPE)
|
LF
|
164.000
|
$20.920
|
$31.370
|
$13.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
403.000
|
$42.580
|
$59.120
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$989,776.140
|
$1,050,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$8,000.000
|
$7,000.000
|
$17,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
860.000
|
$26.000
|
$23.470
|
$33.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
80.000
|
$53.000
|
$92.480
|
$47.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
940.000
|
$9.290
|
$10.570
|
$17.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
440.000
|
$20.000
|
$26.930
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
440.000
|
$8.200
|
$9.110
|
$10.000
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
2,815.000
|
$25.000
|
$26.370
|
$30.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
3,461.000
|
$15.000
|
$26.370
|
$18.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,894.000
|
$2.400
|
$2.450
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,894.000
|
$1.030
|
$0.580
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,703.000
|
$4.000
|
$4.120
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,703.000
|
$0.920
|
$0.580
|
$1.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,862.000
|
$45.000
|
$39.000
|
$42.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,706.000
|
$9.000
|
$12.370
|
$11.000
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
10,270.000
|
$9.000
|
$52.170
|
$35.000
|
|
|
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
|
LF
|
515.000
|
$10.000
|
$10.160
|
$10.000
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,610.000
|
$12.000
|
$6.820
|
$13.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
2,723.000
|
$22.550
|
$18.370
|
$17.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,353.000
|
$31.180
|
$19.420
|
$18.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,687.000
|
$83.000
|
$54.600
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
61.000
|
$37.880
|
$96.360
|
$110.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
102.000
|
$15.000
|
$48.180
|
$11.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,340.000
|
$54.400
|
$42.000
|
$65.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,462.830
|
$1,574.970
|
$1,650.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
5.000
|
$1,750.000
|
$1,574.970
|
$1,600.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
8,446.000
|
$0.160
|
$0.770
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
966.000
|
$21.570
|
$18.480
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,750.000
|
$1,560.000
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,354.910
|
$1,150.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
893.000
|
$2.790
|
$2.000
|
$1.650
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
20.000
|
$160.000
|
$10.000
|
$135.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$269.580
|
$225.000
|
$215.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$10,500.000
|
$554.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$7,000.000
|
$6,603.000
|
$8,500.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
3,180.000
|
$15.000
|
$12.880
|
$32.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$70.000
|
$175.000
|
$150.000
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
1.000
|
$400.000
|
$475.000
|
$200.000
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
2.000
|
$3,074.480
|
$4,250.000
|
$4,500.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
12.000
|
$3,500.000
|
$3,250.000
|
$3,500.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
1.000
|
$3,827.090
|
$3,500.000
|
$3,750.000
|
|
|
TEMP RD IL (RD IL ASM)
|
MO
|
22.000
|
$4,200.000
|
$4,218.180
|
$850.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,205.000
|
$9.000
|
$14.500
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (2 1/2")
|
LF
|
244.000
|
$12.100
|
$20.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
341.000
|
$30.000
|
$66.000
|
$75.000
|
|
|
CONDT (RM) (3") (BORE)
|
LF
|
55.000
|
$34.000
|
$70.000
|
$75.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
5,209.000
|
$0.990
|
$1.150
|
$1.250
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,666.000
|
$1.300
|
$1.900
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,332.000
|
$1.400
|
$1.850
|
$2.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$900.000
|
$1,200.000
|
$1,300.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,051.990
|
$2,600.000
|
$2,800.000
|
|
|
GROUND BOX TY 1 (364860)W/APRON
|
EA
|
18.000
|
$2,800.000
|
$7,200.000
|
$7,800.000
|
|
|
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
|
EA
|
4.000
|
$5,428.400
|
$9,100.000
|
$10,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
38.000
|
$27.830
|
$36.000
|
$40.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
708.000
|
$23.510
|
$33.000
|
$35.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$500.000
|
$483.000
|
$490.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$550.000
|
$521.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$500.000
|
$567.000
|
$565.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$792.000
|
$720.000
|
$675.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$87.000
|
$83.000
|
$80.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$850.000
|
$960.000
|
$1,000.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
1.000
|
$1,600.000
|
$2,300.000
|
$2,500.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
2.000
|
$21,800.000
|
$19,700.000
|
$21,500.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$21,800.000
|
$23,300.000
|
$25,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$5,500.000
|
$3,200.000
|
$3,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
4.000
|
$56.350
|
$68.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
13.000
|
$65.000
|
$68.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
924.000
|
$8.000
|
$3.120
|
$3.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
6,119.000
|
$1.000
|
$0.570
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
34,006.000
|
$0.850
|
$0.490
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
6,625.000
|
$1.100
|
$1.250
|
$1.350
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
2,760.000
|
$6.000
|
$3.120
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
1,200.000
|
$8.000
|
$3.120
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
27,106.000
|
$0.700
|
$0.490
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,569.000
|
$1.000
|
$1.780
|
$1.400
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
51.000
|
$0.850
|
$1.040
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,655.000
|
$0.700
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
657.000
|
$3.230
|
$3.120
|
$3.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,940.000
|
$3.000
|
$2.220
|
$2.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
80.000
|
$6.350
|
$8.320
|
$9.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$114.170
|
$156.070
|
$165.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$286.040
|
$332.940
|
$360.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$129.210
|
$156.070
|
$160.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
2.000
|
$500.000
|
$780.330
|
$800.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
120.000
|
$0.310
|
$0.520
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
225.000
|
$0.210
|
$0.520
|
$0.550
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
51.000
|
$1.190
|
$2.080
|
$2.250
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
18.000
|
$1.560
|
$2.080
|
$2.250
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
225.000
|
$0.200
|
$0.520
|
$0.550
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
9,646.000
|
$3.000
|
$1.030
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
11,305.000
|
$0.750
|
$1.030
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,710.000
|
$0.410
|
$0.420
|
$0.450
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
4,260.000
|
$0.640
|
$0.540
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
644.000
|
$0.400
|
$0.520
|
$0.550
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
972.000
|
$3.450
|
$3.570
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
37,009.000
|
$0.350
|
$0.310
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
360.000
|
$0.980
|
$1.040
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
570.000
|
$0.050
|
$0.520
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
69.000
|
$1.040
|
$1.040
|
$1.150
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
20.000
|
$2.500
|
$5.200
|
$5.250
|
|
|
REMOVAL OF PEDESTRIAN RAMPS
|
EA
|
5.000
|
$1,400.000
|
$250.000
|
$1,400.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$1,500.000
|
$3,500.000
|
$2,600.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$1,000.000
|
$3,500.000
|
$2,100.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
8.000
|
$500.000
|
$525.000
|
$1,300.000
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
3,000.000
|
$265.000
|
$252.000
|
$265.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
15,206.000
|
$73.180
|
$61.290
|
$78.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
2,882.000
|
$85.000
|
$70.920
|
$105.000
|
|
|
TACK COAT
|
GAL
|
5,130.000
|
$3.120
|
$3.180
|
$3.500
|
|
|
UNDERSEAL COURSE
|
GAL
|
3,399.000
|
$2.860
|
$3.180
|
$3.500
|
|
|
CAST-IN-PLACE NOISE WALL
|
SF
|
8,840.000
|
$80.000
|
$67.220
|
$53.000
|
|
|
NOISE WALL
|
SF
|
6,420.800
|
$40.000
|
$55.000
|
$48.000
|
|
|
WATER TANK AND PUMP
|
MG
|
20.000
|
$100.000
|
$2,628.600
|
$755.000
|
|
|
INSTALL SAFETY SWITCH 60A
|
EA
|
4.000
|
$550.000
|
$670.000
|
$725.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$7,500.000
|
$17,000.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$4,182.880
|
$7,900.000
|
$8,500.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
6,541.000
|
$2.760
|
$6.000
|
$6.500
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
1.000
|
$7,741.520
|
$2,600.000
|
$2,750.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
2,158.000
|
$20.000
|
$38.000
|
$40.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
10,034.000
|
$45.220
|
$40.000
|
$42.000
|
|
|
ITS POLE (20 FT)(90 MPH)
|
EA
|
1.000
|
$7,808.810
|
$8,500.000
|
$9,000.000
|
|
|
ITS POLE (30 FT)(90 MPH)
|
EA
|
5.000
|
$6,100.000
|
$1,100.000
|
$12,000.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
1.000
|
$21,000.000
|
$18,300.000
|
$19,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
1.000
|
$5,597.400
|
$6,700.000
|
$7,000.000
|
|
|
COMMUNICATION CABINET
|
EA
|
3.000
|
$17,333.330
|
$3,000.000
|
$3,200.000
|
|
|
COMMUNICATION CABINET FOUNDATION
|
EA
|
1.000
|
$4,210.000
|
$10,300.000
|
$10,500.000
|
|
|
REMOV EXIST WIRELESS ETHRNET RADIO LNK
|
EA
|
1.000
|
$907.140
|
$670.000
|
$700.000
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
3.000
|
$900.000
|
$5,100.000
|
$5,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
198.000
|
$450.000
|
$225.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
176.000
|
$250.000
|
$100.000
|
$75.000
|
|
|
FUR & INST ROADWAY WEATHER INFO SYSTEM
|
EA
|
2.000
|
$136,248.080
|
$46,400.000
|
$50,000.000
|
|
|
TEMP Q-DETECT (TY1) (1 SYS)
|
DAY
|
10.000
|
$360.000
|
$473.050
|
$450.000
|
|
|
TEMP Q-DETECT (TY2) (1 SYS)
|
DAY
|
15.000
|
$430.000
|
$375.630
|
$360.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
6.000
|
$8,600.000
|
$2,100.000
|
$2,200.000
|
|
|
EMP SPEED MONITOR (1 SYS)
|
DAY
|
1,320.000
|
$120.000
|
$66.030
|
$62.000
|
|
|
LED WRONG WAY DRIVER SYSTEM
|
EA
|
1.000
|
$10,000.000
|
$57,800.000
|
$58,000.000
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYS
|
DAY
|
1,320.000
|
$39.000
|
$56.290
|
$60.000
|
|
|
BORE OR JACK PIPE (STEEL)(30")
|
LF
|
670.000
|
$550.000
|
$748.410
|
$650.000
|
|
|
VALVE (GATE)(8")
|
EA
|
6.000
|
$3,000.000
|
$3,650.740
|
$5,000.000
|
|
|
VALVE (GATE)(16")
|
EA
|
1.000
|
$7,000.000
|
$13,017.950
|
$12,000.000
|
|
|
AUTO COMBO AIR/VAC RELEASE VALVE AM 2"
|
EA
|
1.000
|
$5,000.000
|
$5,203.190
|
$8,000.000
|
|
|
FIRE HYDRANTS
|
EA
|
1.000
|
$7,000.000
|
$10,752.770
|
$7,000.000
|
|
|
ABND/RMV/DISPOSE EXIST LINE (ALL TY/SZ)
|
LF
|
25.000
|
$120.000
|
$55.630
|
$22.000
|
|
|
PIPE (8") PVC C-900 DR-14 (ALL DEPTHS)
|
LF
|
71.000
|
$100.000
|
$893.270
|
$160.000
|
|
|
PIPE (16") PVC C-900 DR-14 (ALL DEPTHS)
|
LF
|
66.000
|
$150.000
|
$276.060
|
$188.000
|
|
|
CARRIER PIP (16") PVC C-905 DR-14
|
LF
|
335.000
|
$150.000
|
$133.310
|
$220.000
|
|
|
WET CONNECTION 12 DIA X 12 DIA
|
EA
|
2.000
|
$4,000.000
|
$5,914.860
|
$4,100.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
1.400
|
$10,000.000
|
$17,035.020
|
$5,500.000
|
|
Totals: |
$14,192,050.440
|
$14,020,542.293
|
$16,507,098.500
|