Show Job Controls
Bid Cobra

HASKELL SH 6 (0106-07-030)

Items: 47

County: HASKELL
Length: N/A
Highway: SH 6
District: ABILENE
Control Number: 0106-07-030
DBE Goal: N/A
Project: BR 2022(761)
Guaranty: N/A
Time: 124 WORKING DAYS
Engineer's Estimate: $1,754,558.57
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,754,558.57
Over/Under Est: -1.42% -$24,941.88
Over/Under Est: 19.73% $346,135.78
Amt Left: 21.45% $371,077.66
Over/Under Est: 109.1% $1,914,153.43
Amt Left: 112.11% $1,939,095.31
Delta: -74.64% -$1,568,017.65
Over/Under Est: 178.78% $3,136,885.48
Amt Left: 182.81% $3,161,827.36
Delta: -33.33% -$1,222,732.05
Subcontractor Percentage Amount
HJC FARMS, INC. 16.55% $335,514.00
S & S BRIDGE PAINTING, INC. 14.26% $289,089.40
TRP CONSTRUCTION GROUP, LLC 1.85% $37,504.59
Total: 32.66% $662,107.99

Bid Items & Bid Tabulations

47 Total 0 of 47
HASKELL  |  SH 6  |  ABILENE  |  0106-07-030  |  08/03/2022  |  $1,754,558.57  |  BR 2022(761)  |  BRIDGE MAINT  |  124 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
SCR CIVIL CONSTRUCTION, LLC
SOUTHERN ROAD & BRIDGE, LLC
OLYMPUS PAINTING CONTRACTORS, INC.
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 3.000 $500.000 $763.940 $550.000 $650.000 $3,000.000
FLOWABLE BACKFILL
CY 40.000 $500.000 $402.120 $800.000 $500.000 $400.000
CL B CONC (FLUME)
CY 60.000 $575.000 $956.230 $1,765.000 $1,500.000 $1,800.000
EPOXY WATERPROOF FINISH (TY X)
SF 2,860.000 $10.000 $9.490 $10.000 $12.000 $13.800
PENETRATING CONCRETE SURFACE TREATMENT
SY 3,462.000 $53.000 $10.140 $12.000 $20.000 $20.400
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 130.000 $190.000 $128.300 $225.000 $450.000 $470.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,535.000 $125.000 $104.710 $175.000 $300.000 $276.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 530.000 $100.000 $192.430 $340.000 $350.000 $290.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $610.000 $899.780 $760.000 $750.000 $700.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,026.000 $30.000 $24.590 $35.000 $45.000 $50.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 84.000 $60.000 $125.580 $70.000 $70.000 $82.000
RETROFIT RAIL (TY SSTR)
LF 450.000 $200.000 $318.480 $275.000 $500.000 $280.000
HEADER TYPE EXPANSION JOINT
CF 40.000 $500.000 $412.680 $650.000 $500.000 $545.000
JOINT SEALANT
LF 140.000 $16.000 $59.530 $15.000 $45.000 $49.200
RAISING EXIST STRUCT
LS 1.000 $100,000.000 $58,370.720 $90,000.000 $105,000.000 $250,000.000
MOBILIZATION
LS 1.000 $155,387.140 $172,904.460 $190,000.000 $350,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $12,500.000 $12,267.040 $13,000.000 $10,000.000 $30,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,500.000 $25.000 $28.350 $15.000 $4.000 $30.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 540.000 $25.000 $24.020 $15.000 $8.000 $35.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,500.000 $25.000 $28.350 $15.000 $15.000 $37.000
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $23.000 $39.330 $34.000 $30.000 $34.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $3,230.220 $3,025.000 $3,500.000 $3,500.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $2.500 $6.160 $4.000 $6.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $220.000 $655.220 $340.000 $400.000 $360.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,855.220 $3,910.000 $5,000.000 $3,660.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $3,210.450 $2,500.000 $125.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,500.000 $1,355.220 $1,000.000 $10,000.000 $900.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 4.000 $11,000.000 $7,355.220 $7,000.000 $9,000.000 $9,000.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 270.000 $7.000 $10.260 $5.000 $50.000 $8.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 11,856.000 $0.700 $0.970 $0.850 $4.000 $1.100
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 72.000 $15.000 $39.730 $20.000 $22.000 $60.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 21,600.000 $0.600 $0.920 $0.850 $1.000 $1.100
PAVEMENT SEALER 4"
LF 215.000 $0.350 $7.610 $1.150 $3.000 $1.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,588.000 $0.500 $1.130 $1.000 $3.000 $1.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,751.000 $0.480 $1.380 $1.000 $3.000 $1.350
ELIM EXT PAV MRK & MRKS (4")
LF 14,339.000 $0.750 $0.850 $0.750 $3.000 $1.000
PAV SURF PREP FOR MRK (4")
LF 215.000 $1.150 $7.610 $1.150 $3.000 $2.500
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 600.000 $50.000 $30.250 $70.000 $115.000 $89.000
REPAIR STEEL (CORROSION MITIGATION)
EA 4.000 $300.000 $1,506.010 $1,650.000 $25,000.000 $8,000.000
REPLACE ELASTOMERIC BEARING PADS
EA 4.000 $3,000.000 $14,267.680 $8,000.000 $6,500.000 $10,000.000
STEEL BRIDGE ZONE PAINTING (REF NO. 1)
EA 1.000 $81,000.000 $70,420.900 $81,100.000 $200,000.000 $765,000.000
STEEL BRIDGE ZONE PAINTING (REF NO. 2)
EA 1.000 $74,000.000 $85,420.900 $99,000.000 $300,000.000 $425,000.000
STEEL BRIDGE ZONE PAINTING (REF. NO. 3)
EA 1.000 $75,000.000 $46,420.900 $61,000.000 $250,000.000 $500,000.000
STEEL BRIDGE ZONE PAINTING (REF. NO. 4)
EA 1.000 $6,000.000 $14,920.900 $25,300.000 $50,000.000 $160,000.000
STEEL BRIDGE ZONE PAINTING (REF. NO. 5)
EA 1.000 $60,000.000 $63,920.900 $76,600.000 $250,000.000 $360,000.000
TMA (STATIONARY)
DAY 15.000 $325.000 $489.450 $550.000 $50.000 $4,500.000
TMA (MOBILE OPERATION)
DAY 6.000 $600.000 $950.000 $900.000 $50.000 $4,700.000
Totals: $1,754,558.570 $1,729,616.690 $2,100,694.350 $3,668,712.000 $4,891,444.050