Show Job Controls
Bid Cobra

HARTLEY US 385 (0041-02-016)

Items: 98

County: HARTLEY
Length: N/A
Highway: US 385
District: AMARILLO
Control Number: 0041-02-016
DBE Goal: N/A
Project: F 2021(441)
Guaranty: N/A
Time: 327 WORKING DAYS
Engineer's Estimate: $8,784,107.11
Date: 04/08/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$8,784,107.11
$9,656,579.22
Over/Under Est: 9.93% $872,472.11
Over/Under Est: 14.78% $1,298,516.97
Amt Left: 4.41% $426,044.86
$10,110,536.74
Over/Under Est: 15.1% $1,326,429.63
Amt Left: 4.7% $453,957.52
Delta: -0.28% -$27,912.66
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 14.84% $1,433,036.36
HJC FARMS, INC. 7.32% $706,861.60
TRP CONSTRUCTION GROUP, LLC 2.72% $262,658.95
BARRICADES UNLIMITED 2.44% $235,620.53
SURFACE PREPARATION TECHNOLOGIES, LLC 0.20% $19,313.16
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.17% $16,416.18
Total: 27.69% $2,673,906.78

Bid Items & Bid Tabulations

98 Total 0 of 98
HARTLEY  |  US 385  |  AMARILLO  |  0041-02-016  |  04/08/2021  |  $8,784,107.11  |  F 2021(441)  |  REHAB EXIST ROADWAY  |  327 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 28.000 $300.000 $225.000 $850.000 $560.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 14.000 $500.000 $1,000.000 $1,700.000 $784.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $3,500.000 $3,000.000 $2,800.000 $1,680.000
REMOVING CONC (CURB)
LF 983.000 $6.500 $5.800 $11.450 $5.600
REMOVING CONC (FLUME)
SY 96.000 $12.500 $18.000 $28.610 $16.800
REMOVING STAB BASE AND ASPH PAV (2")
SY 4,183.000 $3.000 $4.750 $5.000 $6.160
EXCAVATION (ROADWAY)
CY 18,622.000 $12.000 $16.000 $11.060 $10.640
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 25,749.000 $17.000 $16.000 $14.380 $13.440
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 19.680 $600.000 $490.000 $515.040 $515.200
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 19.680 $550.000 $370.000 $515.040 $386.400
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 317.000 $4.000 $3.750 $5.720 $3.920
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 96,740.000 $13.000 $11.000 $15.160 $10.260
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
SY 8,199.000 $16.500 $12.000 $18.380 $14.000
REWORK BS MTL (TY B)(18")(DENS CONT)
SY 20,023.000 $8.000 $5.250 $11.710 $7.840
REWORK BS MTL (TY B) (14") (DENS CONT)
SY 38,571.000 $8.000 $5.550 $10.580 $7.280
PRIME COAT (MC-30)
GAL 24,496.000 $4.000 $3.950 $4.600 $4.160
EMULS ASPH (EROSN CONT)(MS-2)
GAL 9,525.000 $4.500 $3.850 $4.510 $3.610
ASPH (MULTI OPTION)
GAL 37,232.000 $4.000 $3.250 $3.740 $3.700
AGGR(TY-B GR-4 SAC-B)
CY 892.000 $150.000 $104.000 $184.720 $209.700
PLANE ASPH CONC PAV (2")
SY 22,112.000 $2.700 $2.000 $1.500 $1.960
DRILL SHAFT (24 IN)
LF 22.000 $180.000 $165.000 $239.210 $234.080
RIPRAP (CONC)(FLUME)
CY 24.000 $500.000 $585.000 $677.190 $728.000
RIPRAP (MOW STRIP)(4 IN)
CY 334.000 $550.000 $710.000 $632.920 $744.800
CONC BOX CULV (3 FT X 2 FT)
LF 4.000 $219.120 $560.000 $600.880 $924.000
CONC BOX CULV (5 FT X 3 FT)
LF 6.000 $318.170 $855.000 $915.630 $1,103.200
CONC BOX CULV (8 FT X 5 FT)
LF 13.000 $551.110 $1,280.000 $1,373.440 $1,344.000
CONC BOX CULV (9 FT X 6 FT)
LF 16.000 $691.120 $1,490.000 $1,602.350 $1,680.000
RC PIPE (CL III)(18 IN)
LF 72.000 $60.000 $80.000 $85.840 $112.000
RC PIPE (CL III)(24 IN)
LF 96.000 $106.720 $120.000 $128.190 $196.000
RC PIPE (CL III)(30 IN)
LF 2.000 $162.790 $160.000 $171.680 $560.000
RC PIPE (CL III)(48 IN)
LF 5.000 $382.750 $395.000 $423.480 $728.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $5,000.000 $10,660.000 $11,445.360 $5,600.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $10,000.000 $90,625.000 $97,285.560 $64,960.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $7,000.000 $27,700.000 $29,757.940 $20,160.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $9,000.000 $27,700.000 $29,757.940 $22,400.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $10,000.000 $37,500.000 $40,058.760 $29,120.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $12,000.000 $59,700.000 $64,094.020 $44,800.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $9,000.000 $90,625.000 $97,285.560 $61,600.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 13.000 $7,000.000 $12,260.000 $13,162.160 $6,720.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 4.000 $5,000.000 $16,000.000 $17,168.040 $7,840.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $7,917.920 $13,325.000 $14,306.700 $10,080.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $6,724.100 $15,000.000 $16,023.500 $11,200.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $9,014.030 $18,000.000 $19,285.430 $13,440.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 14.000 $8,500.000 $9,800.000 $10,529.730 $14,560.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,065.000 $1,144.540 $1,680.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $850.000 $1,120.000 $1,201.760 $2,016.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,400.000 $1,175.000 $1,367.260 $2,240.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 26.000 $1,500.000 $1,335.000 $1,553.700 $2,800.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 3.000 $1,500.000 $2,665.000 $2,861.340 $3,920.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 3.000 $3,500.000 $4,800.000 $5,150.410 $7,280.000
CLEAN EXIST CULVERTS
EA 38.000 $1,722.830 $2,100.000 $2,861.340 $2,240.000
REMOV STR (SET)
EA 61.000 $900.000 $270.000 $286.130 $952.000
REMOV STR (HEADWALL)
EA 23.000 $900.000 $1,100.000 $1,144.540 $2,800.000
REMOV STR (PIPE)
LF 102.000 $20.000 $21.350 $22.890 $33.600
MOBILIZATION
LS 1.000 $600,000.000 $964,000.000 $868,541.440 $869,170.540
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $17,000.000 $25,500.000 $20,000.000 $7,397.830
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 5,800.000 $4.000 $7.600 $3.720 $4.480
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,800.000 $1.100 $2.250 $1.140 $1.120
CONSTRUCTING DETOURS
SY 450.000 $50.000 $140.000 $150.000 $117.090
CONC CURB (TY I)
LF 300.000 $10.000 $32.000 $38.150 $44.800
CONC CURB & GUTTER (TY I)
LF 579.000 $25.000 $42.000 $47.760 $72.800
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 61,065.000 $0.250 $0.400 $0.210 $0.260
MTL W-BEAM GD FEN (STEEL POST)
LF 4,500.000 $30.000 $33.600 $30.900 $35.280
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $2.500 $3.450 $5.720 $3.640
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $2,800.000 $3,465.000 $3,261.930 $3,640.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $350.000 $345.000 $515.040 $364.000
ALUMINUM SIGNS (TY G)
SF 216.000 $40.000 $32.000 $40.060 $39.200
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 58.000 $775.000 $845.000 $835.510 $817.600
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 35.000 $950.000 $955.000 $938.520 $918.400
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 14.000 $920.000 $1,150.000 $1,041.530 $1,019.200
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $1,200.000 $1,280.000 $1,258.990 $1,232.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $1,270.000 $1,415.000 $1,258.990 $1,232.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 11.000 $1,396.000 $1,415.000 $1,373.440 $1,344.000
REMOVE SM RD SN SUP&AM
EA 87.000 $125.000 $107.000 $125.900 $123.200
INSTALL LRSS (STRUCT STEEL)
LB 1,110.000 $9.000 $6.650 $7.240 $7.090
REMOVE LRSA
EA 2.000 $1,450.000 $1,335.000 $1,522.230 $1,489.600
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 79.000 $30.000 $34.650 $48.070 $36.400
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
EA 28.000 $65.000 $155.000 $103.010 $100.800
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 160.000 $225.000 $155.000 $125.900 $123.200
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 4.000 $225.000 $640.000 $400.590 $392.000
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 4.000 $225.000 $640.000 $400.590 $392.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 739.000 $4.000 $3.200 $3.430 $3.360
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 14,800.000 $0.800 $0.850 $0.920 $0.900
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 59,137.000 $0.700 $0.480 $0.520 $0.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,592.000 $1.250 $0.460 $0.490 $0.480
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,030.000 $0.400 $0.460 $0.490 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 205,897.000 $0.400 $0.460 $0.490 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,800.000 $0.400 $0.460 $0.490 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 147,782.000 $0.400 $0.460 $0.490 $0.480
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $300.000 $790.000 $846.960 $828.800
REFL PAV MRKR TY I-C
EA 516.000 $4.500 $3.450 $3.720 $3.640
REFL PAV MRKR TY II-A-A
EA 2,376.000 $4.500 $3.450 $3.720 $3.640
D-GR HMA TY-B PG64-22
TON 16,493.000 $100.000 $94.000 $83.000 $126.040
SP MIXES SP-D SAC-A PG70-28
TON 11,548.000 $112.000 $98.000 $99.000 $138.530
TACK COAT
GAL 13,647.000 $2.500 $3.400 $3.220 $4.480
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,500.000 $22,330.000 $11,808.120 $14,804.220
TMA (STATIONARY)
DAY 322.000 $400.000 $455.000 $409.930 $375.050
TMA (MOBILE OPERATION)
HR 80.000 $80.000 $75.000 $84.480 $80.160
Totals: $8,784,107.110 $9,656,579.220 $10,082,624.094 $10,110,536.748