Show Job Controls
Bid Cobra

HARRISON IH 20 (0495-08-136)

Items: 73

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-136
DBE Goal: N/A
Project: STP 2022(221)HES
Guaranty: N/A
Time: 131 WORKING DAYS
Engineer's Estimate: $10,866,753.83
Date: 11/03/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$10,866,753.83
$11,381,826.00
Over/Under Est: 4.74% $515,072.17
$12,982,343.45
Over/Under Est: 19.47% $2,115,589.62
Amt Left: 14.06% $1,600,517.45
Over/Under Est: 21.97% $2,386,991.44
Amt Left: 16.45% $1,871,919.27
Delta: -2.09% -$271,401.82
$15,153,029.74
Over/Under Est: 39.44% $4,286,275.91
Amt Left: 33.13% $3,771,203.74
Delta: -14.33% -$1,899,284.47

Bid Items & Bid Tabulations

73 Total 0 of 73
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-136  |  11/03/2021  |  $10,866,753.83  |  STP 2022(221)HES  |  HAZARD ELIM & SAFETY  |  131 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
ALTUS CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
CY 16.000 $165.000 $125.000 $152.570 $350.000 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 650.000 $9.750 $13.500 $12.910 $25.000 $15.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 1,964.000 $25.000 $22.000 $29.020 $18.000 $30.000
BACKFILL (TY A)
STA 1,158.530 $222.600 $200.000 $171.540 $240.000 $250.000
BACKFILL (TY B)
STA 992.000 $175.000 $100.000 $161.690 $240.000 $200.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 37,000.000 $0.250 $0.120 $0.100 $0.100 $0.140
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 66,989.000 $0.600 $0.570 $0.690 $0.650 $0.620
VEGETATIVE WATERING
MG 1,061.000 $10.000 $10.000 $1.170 $1.000 $15.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 43,136.000 $125.000 $141.500 $165.520 $165.000 $170.000
TACK COAT
GAL 39,219.000 $3.600 $3.250 $3.520 $3.500 $6.000
TBPFC (MEMBRANE)
GAL 35,250.000 $2.770 $3.250 $3.940 $4.350 $4.000
TBPFC (ASPHALT)(PG 76-22)
TON 503.000 $118.000 $185.500 $126.890 $180.000 $180.000
TBPFC (AGGREGATE) (SAC-A)
TON 7,109.000 $118.000 $185.500 $158.380 $180.000 $180.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 369.000 $160.000 $125.000 $55.130 $90.000 $60.000
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 600.000 $35.380 $92.500 $64.590 $98.000 $80.000
PLAN & TEXT ASPH CONC PAV(2" TO 4")
SY 2,536.000 $4.000 $4.850 $3.240 $3.700 $6.000
PLANE ASPH CONC PAV (2")
SY 392,144.000 $1.500 $1.350 $1.620 $1.250 $2.250
PLANE ASPH CONC PAV (10")
SY 1,778.000 $10.000 $14.750 $8.620 $5.250 $20.000
PLAN & TEXT ASPH CONC PAV(0" TO 1 1/2")
SY 29,560.000 $3.000 $4.850 $2.410 $1.600 $4.000
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
SY 23,259.000 $5.000 $4.000 $1.850 $1.650 $4.000
FULL - DEPTH REPAIR CRCP (8")
SY 678.900 $400.000 $470.000 $194.450 $300.000 $448.000
FLOWABLE BACKFILL
CY 150.000 $210.000 $485.000 $230.510 $300.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 58.000 $35.000 $50.000 $3.370 $50.000 $30.000
TEMPORARY SPL SHORING
SF 360.000 $40.000 $20.000 $17.580 $74.000 $50.000
CL C CONC (COLLAR)
EA 1.000 $500.000 $2,600.000 $2,089.610 $2,500.000 $2,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 103.000 $450.000 $530.000 $404.090 $525.000 $600.000
RC PIPE (CL III)(42 IN)
LF 56.000 $175.000 $300.000 $242.340 $165.000 $200.000
SET (TY I) (42 IN) (6: 1) (C)
EA 1.000 $4,500.000 $4,400.000 $6,519.740 $8,600.000 $15,000.000
REMOV STR (PIPE)
LF 56.000 $15.000 $100.000 $17.540 $48.000 $25.000
MOBILIZATION
LS 1.000 $1,076,000.000 $147,000.000 $1,274,253.400 $1,100,000.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,500.000 $13,250.000 $17,535.600 $7,500.000 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $5.000 $3.000 $4.510 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.250 $0.500 $1.400 $3.000 $1.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 960.000 $80.000 $124.500 $86.050 $95.000 $100.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 480.000 $10.000 $27.000 $11.280 $14.000 $20.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 960.000 $10.000 $52.000 $9.730 $20.000 $20.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 225,640.000 $0.370 $0.250 $0.070 $0.120 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 1,913.000 $20.000 $25.500 $12.200 $28.100 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 113.000 $50.000 $85.000 $43.850 $94.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,250.000 $1,375.000 $1,260.220 $1,515.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 1,850.000 $2.500 $2.250 $2.520 $2.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $220.000 $150.000 $212.140 $165.000 $200.000
CABLE BARRIER SYSTEM (TL-3)
LF 150.000 $20.000 $35.000 $29.880 $45.000 $20.000
REMOVE CABLE BARRIER
LF 150.000 $10.000 $20.000 $7.200 $8.500 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,500.000 $3,225.000 $2,364.060 $3,550.000 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $220.000 $200.000 $285.820 $220.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $3,500.000 $2,000.000 $1,352.050 $1,650.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,750.000 $1,000.000 $732.020 $880.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $15,000.000 $10,250.000 $2,817.380 $10,800.000 $12,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 4.000 $50.000 $50.000 $116.900 $17.000 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 4.000 $20.000 $50.000 $116.900 $17.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 45.000 $25.000 $35.000 $28.260 $39.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 28.000 $22.000 $35.000 $29.330 $39.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 24,435.000 $0.200 $0.150 $0.180 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 9,904.000 $0.250 $0.220 $0.260 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 33,300.000 $0.220 $0.220 $0.260 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,880.000 $0.550 $0.300 $0.380 $0.350 $0.330
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 17,395.000 $0.500 $0.150 $0.180 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 33,300.000 $0.220 $0.220 $0.260 $0.250 $0.240
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 25,344.000 $0.420 $0.010 $2.130 $1.400 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,295.000 $1.120 $1.000 $1.170 $1.100 $1.100
PREFAB PAV MRK TY C (W) (NUMBER)
EA 24.000 $233.330 $125.000 $146.130 $137.500 $140.000
REFL PAV MRKR TY II-C-R
EA 1,727.000 $2.910 $3.700 $4.330 $4.100 $4.000
ELIM EXT PAV MRK & MRKS (6")
LF 10,905.000 $1.250 $0.750 $0.880 $0.830 $0.800
SP MIXES SP-D SAC-A PG76-22
TON 4,782.000 $121.940 $146.750 $133.820 $145.000 $150.000
TACK COAT
GAL 18,965.000 $3.670 $0.010 $4.240 $3.500 $4.000
SP MIXES SP-C OR SP-D PG 70-22
TON 1,059.000 $135.000 $109.500 $126.890 $138.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $6,436.100 $15,000.000 $3,507.120 $18,000.000 $40,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 109,880.000 $0.520 $0.550 $0.640 $0.610 $0.600
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 29,076.000 $0.620 $0.650 $0.640 $0.720 $0.700
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 116,300.000 $0.580 $0.550 $0.640 $0.610 $0.600
TMA (STATIONARY)
DAY 157.000 $104.800 $150.000 $175.360 $200.000 $200.000
TMA (MOBILE OPERATION)
DAY 82.000 $31.690 $1.000 $292.260 $200.000 $200.000
Totals: $10,866,753.828 $11,381,826.000 $12,982,343.461 $13,253,745.270 $15,153,029.740