HARRISON IH 20 (0495-08-116)

Items: 54

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-116
DBE Goal: N/A
Project: NH 2019(847)
Guaranty: N/A
Time: 55 WORKING DAYS
Engineer's Estimate: $2,526,186.95
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: CEMENT TREAT BASE, ACP AND PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,526,186.95
$2,388,393.75
Over/Under Est: -5.45% -$137,793.20
Over/Under Est: -0.05% -$1,169.11
Amt Left: 5.72% $136,624.09
$2,650,268.35
Over/Under Est: 4.91% $124,081.40
Amt Left: 10.96% $261,874.60
Delta: -4.96% -$125,250.51
$3,026,098.35
Over/Under Est: 19.79% $499,911.40
Amt Left: 26.7% $637,704.60
Delta: -14.18% -$375,830.00

Bid Items & Bid Tabulations

54 Total 0 of 54
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-116  |  05/07/2019  |  $2,526,186.95  |  NH 2019(847)  |  CEMENT TREAT BASE, ACP AND PAV MRKS  |  55 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
H. V. CAVER, INC.
REYNOLDS & KAY, LTD.
REMOVING CONC (DRIVEWAYS)
SY 401.000 $16.000 $12.000 $12.000 $22.000 $18.000
REMOVING STAB BASE & ASPH PAV (8")
SY 25,529.000 $4.200 $4.000 $5.000 $5.000 $7.000
SUBGRADE WIDENING (ORD COMP)
STA 11.600 $200.000 $375.000 $465.000 $500.000 $900.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 10.000 $40.000 $50.000 $65.000 $40.000 $55.000
BACKFILL (TY A)
STA 131.500 $200.000 $300.000 $220.000 $300.000 $375.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 6,405.000 $0.680 $0.800 $0.800 $0.770 $0.850
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 6,405.000 $0.600 $0.660 $0.660 $0.750 $0.700
VEGETATIVE WATERING
MG 80.000 $20.000 $12.000 $10.000 $50.000 $1.000
CEMENT
TON 376.000 $200.000 $155.000 $195.000 $151.000 $190.000
CEMENT TREAT(EXIST MATL)(8")
SY 27,873.000 $3.000 $2.200 $1.750 $3.600 $3.750
PRIME COAT & BLOTTER (MC-30)
GAL 6,969.000 $6.000 $7.500 $5.500 $5.250 $3.000
ASPH (TIER II)
GAL 7,180.000 $3.400 $4.000 $4.500 $4.270 $6.000
AGGR(TY-PB GR-4 SAC-B)
CY 257.000 $180.000 $130.000 $170.000 $128.130 $165.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 5,243.000 $110.000 $100.000 $108.000 $108.000 $123.000
SUPERPAVE MIXTURES SP-C PG76-22
TON 8,822.000 $110.000 $100.000 $108.000 $108.000 $120.000
PLANE ASPH CONC PAV (2")
SY 21,627.000 $1.400 $1.750 $2.100 $1.650 $3.000
RIPRAP (MOW STRIP)(4 IN)
CY 77.800 $500.000 $450.000 $490.000 $450.000 $525.000
RC PIPE (CL III)(30 IN)
LF 4.000 $125.000 $400.000 $340.000 $325.000 $550.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $1,500.000 $1,800.000 $2,000.000 $1,560.000 $2,000.000
REMOV STR (HEADWALL)
EA 1.000 $1,100.000 $1,000.000 $650.000 $850.000 $800.000
REMOV STR (PIPE)
LF 4.000 $20.000 $50.000 $160.000 $25.000 $150.000
MOBILIZATION
LS 1.000 $225,000.000 $230,000.000 $235,000.000 $321,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $6,000.000 $3,000.000 $3,125.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $29.000 $40.000 $42.000 $35.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $12.000 $8.000 $33.000 $10.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,200.000 $3.000 $4.000 $3.000 $2.850 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,200.000 $1.500 $0.500 $1.100 $0.900 $0.500
CONC CURB (MONO) (TY II)
LF 80.000 $30.000 $20.000 $30.000 $52.000 $32.000
DRIVEWAYS (CONC)
SY 401.000 $110.000 $90.000 $90.000 $96.000 $100.000
DRIVEWAYS (ACP)
SY 312.000 $30.000 $55.000 $40.000 $72.580 $55.000
TURNOUTS (ACP)
SY 376.000 $50.000 $55.000 $75.000 $72.650 $95.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 6,576.000 $3.050 $1.100 $1.000 $1.000 $1.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,125.000 $25.000 $22.000 $22.000 $20.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $60.000 $80.000 $77.000 $79.000 $80.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,575.000 $1,800.000 $1,500.000 $2,000.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 925.000 $3.000 $3.000 $2.750 $3.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $2,800.000 $2,800.000 $2,675.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $275.000 $300.000 $220.000 $350.000 $230.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $360.000 $350.000 $600.000 $312.420 $400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $35.000 $25.000 $22.000 $53.500 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 1.000 $65.000 $100.000 $70.000 $96.980 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $30.000 $40.000 $38.000 $34.000 $40.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 16,463.000 $0.200 $0.130 $0.330 $0.110 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 126.000 $0.680 $2.000 $1.200 $1.500 $1.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 13,447.000 $1.500 $1.750 $1.400 $1.500 $1.150
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $400.000 $350.000 $220.000 $320.000 $233.000
PREFAB PAV MRK TY B (W)(WORD)
EA 1.000 $600.000 $1,100.000 $330.000 $1,000.000 $350.000
REFL PAV MRKR TY II-A-A
EA 333.000 $2.800 $4.000 $4.950 $3.450 $5.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 3,289.000 $3.150 $4.000 $5.500 $3.650 $5.500
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 26,291.000 $0.380 $0.580 $0.600 $0.530 $0.650
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 20,966.000 $0.440 $0.580 $0.600 $0.530 $0.650
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 1,570.000 $0.700 $0.700 $0.600 $0.630 $0.650
TMA (STATIONARY)
EA 1.000 $12,200.000 $20,000.000 $15,000.000 $25,000.000 $7,000.000
TMA (MOBILE OPERATION)
HR 140.000 $45.000 $20.000 $22.000 $55.000 $20.000
Totals: $2,526,186.950 $2,388,393.750 $2,525,017.840 $2,650,268.350 $3,026,098.350