Show Job Controls
Bid Cobra

HARRISON IH 20 (0495-08-098)

Items: 20

County: HARRISON
Length: N/A
Highway: IH 20
District: ATLANTA
Control Number: 0495-08-098
DBE Goal: N/A
Project: STP 1702(695)HESG
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $708,318.35
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: INSTALL SAFETY LIGHTING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$708,318.35
$689,736.00
Over/Under Est: -2.62% -$18,582.35
Over/Under Est: 2.54% $18,006.85
Amt Left: 5.3% $36,589.20

Bid Items & Bid Tabulations

20 Total 0 of 20
HARRISON  |  IH 20  |  ATLANTA  |  0495-08-098  |  08/08/2017  |  $708,318.35  |  STP 1702(695)HESG  |  INSTL SAFETY LIGHTING  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTH TEXAS ILLUMINATION, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
PREPARING ROW
AC 0.750 $6,185.000 $7,500.000 $4,909.980
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 175.000 $546.000 $495.000 $624.570
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $189.000 $176.000 $186.430
RIPRAP (CONC)(CL B)
CY 19.000 $382.000 $400.000 $960.560
MOBILIZATION
LS 1.000 $40,093.000 $60,000.000 $67,676.480
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $2,250.000 $3,000.000 $2,497.540
REMOVE RD IL ASM (TRANS-BASE)
EA 26.000 $400.000 $550.000 $871.180
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 4.000 $3,300.000 $3,300.000 $2,780.750
HI MST IL POLE (100 FT)( 80 MPH)
EA 2.000 $15,000.000 $17,500.000 $14,113.460
HI MST IL POLE (150 FT)( 80 MPH)
EA 5.000 $22,234.000 $23,515.000 $23,228.450
CONDT (PVC) (SCH 40) (2")
LF 9,300.000 $6.000 $5.400 $6.080
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,130.000 $19.500 $10.000 $19.190
ELEC CONDR (NO.6) BARE
LF 11,100.000 $1.260 $1.200 $1.040
ELEC CONDR (NO.6) INSULATED
LF 23,580.000 $1.370 $1.200 $1.100
GROUND BOX TY A (122311)
EA 7.000 $722.000 $540.000 $745.480
GROUND BOX TY A (122311)W/APRON
EA 20.000 $838.000 $540.000 $933.820
REMOVE GROUND BOX
EA 1.000 $170.000 $400.000 $850.820
REMOVE ELECTRICAL SERVICES
EA 3.000 $455.000 $550.000 $881.690
ELC SRV TY A 240/480 060(NS)AL(E)SP(O)
EA 3.000 $4,825.000 $5,000.000 $5,750.940
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 7.000 $30,107.000 $26,715.000 $23,425.550
Totals: $708,318.350 $689,736.000 $726,325.205