HARRISON SH 43 (0208-02-045)

Items: 87

County: HARRISON
Length: N/A
Highway: SH 43
District: ATLANTA
Control Number: 0208-02-045
DBE Goal: N/A
Project: STP 2019(845)
Guaranty: N/A
Time: 193 WORKING DAYS
Engineer's Estimate: $4,890,559.20
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: GRADING,CEM TRT BASE,ACP & PV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$4,890,559.20
$4,592,940.44
Over/Under Est: -6.09% -$297,618.76
Over/Under Est: -3.97% -$194,337.17
Amt Left: 2.25% $103,281.59
Over/Under Est: -0.09% -$4,556.07
Amt Left: 6.38% $293,062.69
Delta: -4.04% -$189,781.10
Over/Under Est: 1.59% $77,705.27
Amt Left: 8.17% $375,324.03
Delta: -1.68% -$82,261.34

Bid Items & Bid Tabulations

87 Total 0 of 87
HARRISON  |  SH 43  |  ATLANTA  |  0208-02-045  |  05/08/2019  |  $4,890,559.20  |  STP 2019(845)  |  GRADING,CEM TRT BASE,ACP & PV MRKS  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. V. CAVER, INC.
EAST TEXAS BRIDGE, INC.
L. S. EQUIPMENT CO., INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 18.500 $4,000.000 $1,200.000 $3,000.000 $1,000.000 $1,800.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 6.000 $400.000 $300.000 $300.000 $300.000 $850.000
PREPARING ROW (TREE)(20" TO 42" DIA)
EA 18.000 $1,500.000 $970.000 $1,000.000 $800.000 $3,500.000
REMOVING CONC (DRIVEWAYS)
SY 121.000 $20.000 $12.000 $20.000 $10.000 $22.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,623.000 $20.000 $7.000 $8.000 $10.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 1,963.000 $8.500 $8.000 $8.000 $10.000 $10.000
SUBGRADE WIDENING (ORD COMP)
STA 146.000 $250.000 $200.000 $400.000 $200.000 $385.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 2,140.000 $30.000 $20.000 $14.000 $10.000 $13.750
BACKFILL (TY A)
STA 150.000 $300.000 $239.040 $400.000 $250.000 $280.000
BLADING
STA 23.000 $250.000 $110.000 $300.000 $100.000 $225.000
FURNISHING AND PLACING TOPSOIL (4")
STA 149.000 $600.000 $450.000 $500.000 $400.000 $575.000
BLOCK SODDING
SY 1,120.000 $5.000 $4.400 $5.000 $8.000 $4.850
BROADCAST SEED (TEMP) (WARM)
SY 35,186.000 $0.200 $0.070 $0.110 $0.100 $0.080
BROADCAST SEED (TEMP) (COOL)
SY 35,186.000 $0.200 $0.070 $0.110 $0.100 $0.080
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 70,372.000 $0.750 $0.710 $0.700 $0.600 $0.780
VEGETATIVE WATERING
MG 1,608.000 $10.000 $0.010 $7.000 $0.010 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 2,340.000 $2.250 $1.700 $1.450 $2.000 $1.850
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,120.000 $2.500 $2.540 $1.750 $2.000 $2.800
FL BS (CMP IN PLC)(TY A GR 4)(10")
SY 15,543.000 $15.000 $14.620 $16.000 $15.000 $15.250
REWRKING BS MATL (TY C)(10")(ORD COMP)
SY 42,724.000 $2.500 $2.350 $3.000 $2.750 $1.750
CEMENT
TON 1,195.000 $160.000 $150.000 $155.000 $160.000 $190.000
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
SY 58,267.000 $3.000 $2.500 $2.150 $2.750 $1.750
PRIME COAT & BLOTTER (MC-30)
GAL 14,567.000 $5.000 $4.500 $4.750 $3.250 $6.000
ASPH (TIER II)
GAL 26,220.000 $3.750 $3.930 $4.250 $3.900 $4.300
AGGR(TY-PB GR-3 SAC-B)
CY 583.000 $118.000 $123.140 $170.000 $175.000 $175.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 6,504.000 $110.000 $106.500 $110.000 $115.000 $115.000
SUPERPAVE MIXTURES SP-C PG76-22
TON 13,010.000 $105.000 $107.000 $110.000 $115.000 $115.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,079.000 $2.000 $5.950 $3.000 $5.000 $10.250
PLANE ASPH CONC PAV (0" TO 5")
SY 1,224.000 $2.500 $6.650 $3.000 $5.000 $10.000
TEMPORARY SPL SHORING
SF 1,172.000 $40.000 $60.000 $35.000 $35.000 $34.000
CL A CONC (CURB OUTLET)(TY I)
EA 1.000 $1,500.000 $5,000.000 $1,500.000 $900.000 $2,400.000
CL C CONC (MISC)
CY 3.400 $2,000.000 $4,500.000 $800.000 $800.000 $2,000.000
RIPRAP (CONC)(5 IN)
CY 1.600 $800.000 $800.000 $800.000 $500.000 $1,500.000
RIPRAP (CONC)(CL B)
CY 138.000 $600.000 $475.000 $525.000 $600.000 $480.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 282.000 $140.000 $175.000 $135.000 $150.000 $185.000
BEDDING MATERIAL (6 IN)
CY 94.000 $130.000 $200.000 $135.000 $225.000 $195.000
RIPRAP (MOW STRIP)(4 IN)
CY 81.000 $450.000 $450.000 $420.000 $500.000 $540.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 55.000 $500.000 $350.000 $350.000 $400.000 $500.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 8.000 $500.000 $375.000 $500.000 $600.000 $800.000
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
LF 24.000 $1,500.000 $1,175.000 $700.000 $1,200.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 116.000 $50.000 $41.840 $52.000 $30.000 $60.000
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $35,000.000 $31,750.000 $19,000.000 $50,000.000 $20,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 7.000 $3,000.000 $5,795.000 $3,500.000 $3,500.000 $5,000.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $4,000.000 $6,575.000 $4,500.000 $5,000.000 $7,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $700.000 $715.000 $750.000 $750.000 $700.000
SET (REMOV & REINSTALL)
EA 10.000 $400.000 $510.000 $300.000 $450.000 $350.000
REMOV STR (SET)
EA 3.000 $300.000 $300.000 $200.000 $100.000 $125.000
REMOV STR (PIPE)
LF 54.000 $20.000 $10.000 $10.000 $15.000 $20.000
REMOVE STR (RAIL)
LF 42.000 $25.000 $50.000 $50.000 $50.000 $30.000
MOBILIZATION
LS 1.000 $460,000.000 $300,000.000 $250,000.000 $450,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $3,500.000 $2,100.000 $4,000.000 $2,000.000 $2,200.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 60.000 $75.000 $40.000 $45.000 $150.000 $70.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $30.000 $9.750 $10.000 $25.000 $38.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,675.000 $4.250 $2.550 $2.800 $3.000 $2.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,675.000 $3.000 $0.500 $0.500 $1.000 $1.100
CONC CURB & GUTTER (TY II)
LF 1,623.000 $35.000 $45.500 $30.000 $28.000 $35.000
DRIVEWAYS (CONC)
SY 121.000 $125.000 $95.000 $110.000 $80.000 $95.000
DRIVEWAYS (ACP)
SY 3,693.000 $35.000 $55.000 $50.000 $50.000 $48.000
TURNOUTS (ACP)
SY 430.000 $40.000 $55.000 $50.000 $50.000 $54.000
RUMBLE STRIPS (SHOULDER)
LF 29,663.000 $0.250 $0.320 $0.300 $0.150 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,075.000 $21.000 $17.000 $23.000 $25.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,000.000 $1,500.000 $1,400.000 $1,550.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,200.000 $725.000 $1,100.000 $1,000.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $2.500 $2.000 $2.750 $3.000 $2.750
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $250.000 $165.000 $150.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,800.000 $2,525.000 $2,800.000 $2,800.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $250.000 $215.000 $250.000 $220.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 18.000 $350.000 $252.420 $260.000 $275.000 $260.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $400.000 $299.750 $300.000 $300.000 $305.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $750.000 $573.000 $650.000 $600.000 $660.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 10.000 $600.000 $506.850 $445.000 $450.000 $450.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 10.000 $400.000 $408.930 $510.000 $450.000 $520.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 15.000 $80.000 $61.500 $80.000 $75.000 $82.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 28.000 $40.000 $34.000 $35.000 $30.000 $33.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 45,120.000 $0.200 $0.200 $0.270 $0.260 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,000.000 $1.500 $1.200 $1.350 $1.000 $1.200
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 13,536.000 $1.300 $1.500 $1.350 $2.000 $1.400
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 119.000 $22.000 $13.250 $16.000 $15.000 $16.500
REFL PAV MRKR TY I-C
EA 20.000 $5.000 $4.550 $5.350 $6.000 $5.500
REFL PAV MRKR TY II-A-A
EA 392.000 $5.000 $4.550 $4.300 $5.000 $4.400
PREFORMED CENTERLINE RUMBLE STRIP
LF 3,775.000 $4.250 $3.500 $5.350 $5.000 $5.500
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 29,723.000 $0.500 $0.520 $0.520 $0.500 $0.550
REFL PAV MRK AWT (W) 4" (BRK) (100MIL)
LF 380.000 $1.250 $0.730 $2.150 $2.000 $3.300
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 24,335.000 $0.750 $0.520 $0.520 $0.500 $0.550
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 1,370.000 $1.250 $0.730 $2.150 $2.000 $2.200
TMA (STATIONARY)
EA 2.000 $10,000.000 $15,000.000 $30,000.000 $5,000.000 $16,500.000
TMA (MOBILE OPERATION)
HR 72.000 $40.000 $20.000 $25.000 $20.000 $22.000
Totals: $4,890,559.200 $4,592,940.440 $4,696,222.030 $4,886,003.130 $4,968,264.470