REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$93.000
|
$50.000
|
$11.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
10.000
|
$35.000
|
$200.000
|
$11.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
20.000
|
$130.000
|
$300.000
|
$165.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
400.000
|
$14.000
|
$15.000
|
$3.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
25.000
|
$69.000
|
$150.000
|
$132.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
300.000
|
$34.000
|
$20.000
|
$35.000
|
|
|
BACKFILL (TY A OR B)
|
CY
|
100.000
|
$390.000
|
$100.000
|
$15.000
|
|
|
BLADING
|
STA
|
800.000
|
$216.000
|
$100.000
|
$150.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
2,000.000
|
$3.750
|
$1.000
|
$4.000
|
|
|
SPOT SODDING
|
SY
|
1,000.000
|
$49.000
|
$20.000
|
$12.690
|
|
|
BLOCK SODDING
|
SY
|
2,000.000
|
$13.720
|
$15.000
|
$25.000
|
|
|
ROLL SODDING
|
SY
|
500.000
|
$5.600
|
$20.000
|
$12.690
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
2,000.000
|
$0.570
|
$2.000
|
$5.840
|
|
|
FERTILIZER
|
AC
|
10.000
|
$1,569.300
|
$500.000
|
$2,105.330
|
|
|
VEGETATIVE WATERING
|
MG
|
1,500.000
|
$175.000
|
$30.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
800.000
|
$149.000
|
$100.000
|
$76.030
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
2,000.000
|
$51.000
|
$70.000
|
$32.750
|
|
|
FULL - DEPTH REPAIR CRCP (15")
|
SY
|
50.000
|
$348.000
|
$805.000
|
$625.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
25.000
|
$510.750
|
$750.000
|
$633.580
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
300.000
|
$360.000
|
$350.000
|
$550.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
100.000
|
$54.020
|
$60.000
|
$34.610
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
100.000
|
$79.000
|
$60.000
|
$34.610
|
|
|
CEM STABIL BKFL
|
CY
|
100.000
|
$78.000
|
$150.000
|
$102.420
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
50.000
|
$103.000
|
$70.000
|
$63.160
|
|
|
FLOWABLE BACKFILL
|
CY
|
50.000
|
$529.260
|
$400.000
|
$388.800
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
100.000
|
$50.000
|
$45.000
|
$13.080
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
100.000
|
$174.000
|
$150.000
|
$214.540
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
100.000
|
$260.000
|
$250.000
|
$214.540
|
|
|
CONCRETE PAINT FINISH
|
SF
|
15,000.000
|
$1.380
|
$6.000
|
$1.090
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
200.000
|
$275.000
|
$110.000
|
$61.380
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
100.000
|
$285.000
|
$160.000
|
$147.490
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
100.000
|
$345.000
|
$160.000
|
$147.490
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
50.000
|
$550.000
|
$260.000
|
$155.180
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
400.000
|
$373.560
|
$160.000
|
$103.540
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
75.000
|
$350.000
|
$160.000
|
$103.540
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
600.000
|
$350.000
|
$150.000
|
$77.760
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
75.000
|
$717.000
|
$500.000
|
$1,250.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
15.000
|
$400.000
|
$750.000
|
$850.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
300.000
|
$201.740
|
$200.000
|
$148.200
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
300.000
|
$352.220
|
$200.000
|
$99.080
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
100.000
|
$783.040
|
$700.000
|
$670.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
100.000
|
$500.000
|
$700.000
|
$406.570
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,500.000
|
$43.310
|
$20.000
|
$16.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
700.000
|
$37.580
|
$90.000
|
$44.640
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
90.000
|
$200.000
|
$200.000
|
$151.690
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
2.000
|
$8,500.000
|
$1,000.000
|
$4,332.570
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
2.000
|
$7,578.670
|
$1,000.000
|
$2,695.090
|
|
|
INLET (STG II)(TY C)
|
EA
|
2.000
|
$6,810.150
|
$3,550.000
|
$2,695.090
|
|
|
GRATE & FRAME
|
EA
|
2.000
|
$3,600.000
|
$2,250.000
|
$1,611.970
|
|
|
FRAME & COVER
|
EA
|
2.000
|
$7,530.000
|
$3,000.000
|
$1,611.970
|
|
|
RING & COVER
|
EA
|
2.000
|
$1,700.000
|
$3,000.000
|
$1,611.970
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
2.000
|
$4,400.000
|
$2,000.000
|
$360.360
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
10.000
|
$2,000.000
|
$1,000.000
|
$1,042.090
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
500.000
|
$800.000
|
$1.000
|
$457.940
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
50.000
|
$1,271.300
|
$1,500.000
|
$915.870
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
500.000
|
$30.000
|
$65.000
|
$100.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
500.000
|
$32.000
|
$65.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$13.630
|
$50.000
|
$12.090
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$20.410
|
$15.000
|
$10.950
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
560.000
|
$24.000
|
$15.000
|
$10.950
|
|
|
LANDSCAPE PAVERS
|
SY
|
150.000
|
$26.000
|
$1.000
|
$153.370
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
400.000
|
$32.000
|
$10.000
|
$73.420
|
|
|
CONC CURB (TY II)
|
LF
|
1,000.000
|
$30.000
|
$40.000
|
$9.740
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
100.000
|
$80.000
|
$185.000
|
$51.860
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
500.000
|
$38.000
|
$165.000
|
$79.130
|
|
|
CONC SIDEWALKS (4")
|
SY
|
50.000
|
$80.000
|
$100.000
|
$99.230
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
2,000.000
|
$8.500
|
$5.000
|
$5.880
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
200.000
|
$30.000
|
$30.000
|
$48.680
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,500.000
|
$2,000.000
|
$2,007.460
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$5.400
|
$10.000
|
$1.820
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
200.000
|
$28.150
|
$1.000
|
$39.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,361.170
|
$4,000.000
|
$3,579.440
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
4.000
|
$4,600.000
|
$5,000.000
|
$4,749.070
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$900.000
|
$1,000.000
|
$795.740
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$900.000
|
$3,000.000
|
$318.310
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$2,000.000
|
$1,000.000
|
$318.300
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
2.000
|
$28,000.000
|
$32,000.000
|
$36,387.870
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(70)
|
EA
|
2.000
|
$38,000.000
|
$42,000.000
|
$25,517.050
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
1,000.000
|
$45.000
|
$17.000
|
$52.630
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
4,000.000
|
$16.600
|
$16.000
|
$17.540
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
3.000
|
$1,500.000
|
$1,500.000
|
$321.640
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
4.000
|
$1,000.000
|
$1,500.000
|
$1,169.620
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
2,000.000
|
$39.000
|
$22.000
|
$27.320
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
400.000
|
$37.000
|
$35.000
|
$79.800
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
100.000
|
$40.000
|
$100.000
|
$52.660
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
500.000
|
$50.000
|
$50.000
|
$27.320
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
500.000
|
$40.000
|
$40.000
|
$79.800
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
200.000
|
$40.000
|
$100.000
|
$23.180
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
120.000
|
$2,859.790
|
$1.000
|
$935.810
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
100.000
|
$3,273.010
|
$1.000
|
$935.810
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1,000.000
|
$18.000
|
$18.000
|
$16.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,000.000
|
$20.000
|
$15.000
|
$21.180
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
3,000.000
|
$34.000
|
$30.000
|
$29.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
2,000.000
|
$34.000
|
$50.000
|
$29.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
400.000
|
$37.000
|
$50.000
|
$29.500
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
200.000
|
$50.000
|
$50.000
|
$29.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
20.000
|
$43.000
|
$55.000
|
$37.680
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,500.000
|
$1.650
|
$2.000
|
$1.820
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
1,000.000
|
$2.060
|
$2.000
|
$2.080
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,000.000
|
$2.060
|
$1.500
|
$0.940
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,500.000
|
$3.470
|
$4.000
|
$4.160
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
9,000.000
|
$365.000
|
$3.520
|
$2.180
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,000.000
|
$8.500
|
$7.100
|
$7.280
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
200.000
|
$123.000
|
$200.000
|
$182.050
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
100.000
|
$220.000
|
$205.000
|
$208.050
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
80.000
|
$250.000
|
$215.000
|
$208.050
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
30.000
|
$283.330
|
$210.000
|
$208.050
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
80.000
|
$180.000
|
$250.000
|
$208.050
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
40.000
|
$635.720
|
$450.000
|
$468.120
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
40.000
|
$722.690
|
$550.000
|
$572.140
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
20,000.000
|
$1.910
|
$0.910
|
$0.940
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
4,000.000
|
$4.480
|
$3.010
|
$3.120
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,000.000
|
$8.800
|
$6.000
|
$6.240
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
30,000.000
|
$1.760
|
$1.050
|
$1.040
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
100.000
|
$2.750
|
$2.000
|
$2.080
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
300.000
|
$2.150
|
$2.000
|
$2.080
|
|
|
PAVEMENT SEALER 4"
|
LF
|
400.000
|
$0.500
|
$0.100
|
$0.100
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,582,500.000
|
$0.400
|
$0.050
|
$0.100
|
|
|
PAVEMENT SEALER 8"
|
LF
|
155,000.000
|
$0.400
|
$0.210
|
$0.220
|
|
|
PAVEMENT SEALER 12"
|
LF
|
41,900.000
|
$0.800
|
$0.230
|
$0.240
|
|
|
PAVEMENT SEALER 24"
|
LF
|
7,000.000
|
$1.600
|
$1.000
|
$0.480
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
200.000
|
$40.000
|
$50.000
|
$10.400
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
80.000
|
$42.000
|
$100.000
|
$10.400
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
100.000
|
$65.000
|
$40.000
|
$20.810
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
80.000
|
$38.000
|
$50.000
|
$26.010
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
30.000
|
$50.000
|
$30.000
|
$26.010
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
40.000
|
$145.000
|
$100.000
|
$104.030
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
40.000
|
$145.000
|
$100.000
|
$104.030
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
200.000
|
$1.150
|
$0.600
|
$0.620
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
30,000.000
|
$0.850
|
$1.100
|
$0.880
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.750
|
$1.800
|
$0.880
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
200.000
|
$1.000
|
$1.000
|
$0.620
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,000.000
|
$0.900
|
$1.800
|
$0.880
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
2,000.000
|
$2.000
|
$2.000
|
$1.040
|
|
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
|
LF
|
2,000.000
|
$2.000
|
$3.500
|
$2.600
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
5,000.000
|
$10.000
|
$16.000
|
$15.600
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
6.000
|
$2,500.000
|
$3,000.000
|
$3,120.790
|
|
REFL PAV MRKR TY I-A
|
EA
|
40.000
|
$6.100
|
$10.000
|
$6.240
|
|
REFL PAV MRKR TY I-C
|
EA
|
40.000
|
$6.750
|
$10.000
|
$6.240
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$9.000
|
$10.000
|
$6.240
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,000.000
|
$9.000
|
$10.000
|
$6.240
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
400.000
|
$0.420
|
$1.000
|
$0.260
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,582,500.000
|
$0.520
|
$0.250
|
$0.420
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
155,000.000
|
$1.250
|
$0.550
|
$0.620
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
14,900.000
|
$2.000
|
$2.050
|
$2.080
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
7,000.000
|
$4.000
|
$4.050
|
$4.160
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
200.000
|
$80.000
|
$75.000
|
$52.010
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
100.000
|
$95.000
|
$70.000
|
$62.420
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
80.000
|
$80.000
|
$150.000
|
$52.010
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
40.000
|
$330.000
|
$250.000
|
$260.070
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
40.000
|
$350.000
|
$250.000
|
$260.070
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
6.000
|
$246.500
|
$250.000
|
$260.070
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
26.000
|
$70.000
|
$100.000
|
$52.010
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
400.000
|
$0.400
|
$1.000
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,582,500.000
|
$0.500
|
$0.050
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
155,000.000
|
$0.400
|
$0.100
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
14,900.000
|
$1.450
|
$0.300
|
$0.260
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
7,000.000
|
$2.600
|
$0.600
|
$0.520
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
200.000
|
$15.000
|
$15.000
|
$5.200
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
100.000
|
$20.000
|
$10.000
|
$5.200
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
26.000
|
$25.000
|
$50.000
|
$5.200
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
200.000
|
$27.020
|
$50.000
|
$5.200
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
40.000
|
$144.170
|
$15.000
|
$10.400
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
40.000
|
$184.170
|
$15.000
|
$10.400
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
6.000
|
$150.000
|
$10.000
|
$10.400
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
4,180.000
|
$4.000
|
$2.000
|
$1.040
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
30.000
|
$280.000
|
$400.000
|
$451.930
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
200.000
|
$150.000
|
$110.000
|
$48.400
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LMI
|
40.000
|
$850.000
|
$1,650.000
|
$957.700
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
50.000
|
$273.000
|
$350.000
|
$81.350
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
200.000
|
$125.000
|
$70.000
|
$176.260
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
3,000.000
|
$30.000
|
$8.000
|
$2.730
|
|
|
SPOT MOWING
|
AC
|
50.000
|
$100.000
|
$150.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
324.000
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
6,944.980
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
7,467.600
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
5,840.100
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
3,430.980
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
8,031.000
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (7)
|
AC
|
3,416.000
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (8)
|
AC
|
742.000
|
$52.000
|
$35.000
|
$38.000
|
|
|
FULL - WIDTH MOWING - TRACT (9)
|
AC
|
828.000
|
$57.000
|
$35.000
|
$38.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
1,014.560
|
$590.000
|
$500.000
|
$120.000
|
|
|
BROADCAST APPLICATION
|
AC
|
600.000
|
$245.000
|
$50.000
|
$36.050
|
|
|
WICK APPLICATION OF HERBICIDE
|
AC
|
75.000
|
$50.000
|
$1.000
|
$285.090
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
30.000
|
$50.000
|
$1,000.000
|
$133.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$255.000
|
$277.920
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
48.000
|
$5,000.000
|
$5,952.840
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
48.000
|
$5,500.000
|
$6,400.800
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (4)
|
CYC
|
48.000
|
$3,400.000
|
$4,028.280
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (5)
|
CYC
|
48.000
|
$820.000
|
$977.520
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (6)
|
CYC
|
48.000
|
$560.000
|
$2,940.840
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (7)
|
CYC
|
48.000
|
$2,500.000
|
$890.040
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (8)
|
CYC
|
48.000
|
$760.000
|
$636.000
|
$2,208.000
|
|
|
LITTER REMOVAL - TRACT (9)
|
CYC
|
48.000
|
$1,100.000
|
$828.000
|
$2,208.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
150.000
|
$55.000
|
$350.000
|
$503.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
48.000
|
$180.000
|
$200.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
48.000
|
$1,750.000
|
$1,650.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
48.000
|
$1,350.000
|
$1,250.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
|
CYC
|
48.000
|
$1,350.000
|
$1,250.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
|
CYC
|
48.000
|
$300.000
|
$250.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
|
CYC
|
48.000
|
$1,300.000
|
$1,250.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
|
CYC
|
48.000
|
$800.000
|
$750.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
|
CYC
|
48.000
|
$250.000
|
$200.000
|
$330.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (9)
|
CYC
|
48.000
|
$250.000
|
$500.000
|
$330.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
48.000
|
$600.000
|
$750.000
|
$330.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
48.000
|
$600.000
|
$750.000
|
$330.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (4)
|
CYC
|
48.000
|
$400.000
|
$500.000
|
$330.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (5)
|
CYC
|
48.000
|
$600.000
|
$500.000
|
$330.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (6)
|
CYC
|
48.000
|
$600.000
|
$500.000
|
$330.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
80.000
|
$150.000
|
$400.000
|
$124.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
50.000
|
$770.000
|
$310.000
|
$124.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
600,000.000
|
$1.500
|
$0.400
|
$0.350
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
48.000
|
$256.000
|
$200.000
|
$198.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
48.000
|
$2,528.000
|
$1,200.000
|
$1,955.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
48.000
|
$1,904.000
|
$900.000
|
$1,473.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
|
CYC
|
48.000
|
$1,905.600
|
$900.000
|
$1,474.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
|
CYC
|
48.000
|
$292.800
|
$200.000
|
$226.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
|
CYC
|
48.000
|
$1,857.600
|
$900.000
|
$1,437.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
|
CYC
|
48.000
|
$1,108.800
|
$500.000
|
$858.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
|
CYC
|
48.000
|
$291.200
|
$200.000
|
$225.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(9)
|
CYC
|
48.000
|
$250.000
|
$200.000
|
$223.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
48.000
|
$256.000
|
$200.000
|
$198.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
48.000
|
$2,528.000
|
$1,200.000
|
$1,955.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
48.000
|
$1,904.000
|
$900.000
|
$1,473.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
|
CYC
|
48.000
|
$1,905.600
|
$900.000
|
$1,474.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
|
CYC
|
48.000
|
$292.800
|
$200.000
|
$226.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
|
CYC
|
48.000
|
$1,857.600
|
$900.000
|
$1,437.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
|
CYC
|
48.000
|
$1,108.800
|
$500.000
|
$858.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
|
CYC
|
48.000
|
$291.200
|
$200.000
|
$225.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(9)
|
CYC
|
48.000
|
$250.000
|
$200.000
|
$223.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
24.000
|
$430.000
|
$200.000
|
$198.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
24.000
|
$2,050.000
|
$1,200.000
|
$1,955.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
24.000
|
$1,590.000
|
$900.000
|
$1,473.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
|
CYC
|
24.000
|
$1,590.000
|
$900.000
|
$1,474.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(5)
|
CYC
|
24.000
|
$245.000
|
$200.000
|
$226.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
|
CYC
|
24.000
|
$1,530.000
|
$900.000
|
$1,437.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
|
CYC
|
24.000
|
$915.000
|
$500.000
|
$858.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
|
CYC
|
24.000
|
$240.000
|
$200.000
|
$225.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(9)
|
CYC
|
24.000
|
$240.000
|
$200.000
|
$223.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
24.000
|
$250.000
|
$200.000
|
$198.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
24.000
|
$2,000.000
|
$1,200.000
|
$1,955.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
24.000
|
$1,570.000
|
$900.000
|
$1,473.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
|
CYC
|
24.000
|
$1,570.000
|
$900.000
|
$1,474.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
|
CYC
|
24.000
|
$250.000
|
$200.000
|
$226.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
|
CYC
|
24.000
|
$1,520.000
|
$900.000
|
$1,437.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
|
CYC
|
24.000
|
$940.000
|
$500.000
|
$858.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
|
CYC
|
24.000
|
$250.000
|
$200.000
|
$225.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 9)
|
CYC
|
24.000
|
$250.000
|
$200.000
|
$223.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
48.000
|
$1,000.000
|
$200.000
|
$202.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
48.000
|
$1,000.000
|
$1,200.000
|
$1,955.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
|
CYC
|
48.000
|
$500.000
|
$900.000
|
$1,474.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
|
CYC
|
48.000
|
$500.000
|
$200.000
|
$226.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
|
CYC
|
48.000
|
$500.000
|
$900.000
|
$1,437.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
1,500.000
|
$3.000
|
$1.000
|
$1.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
100,000.000
|
$7.000
|
$3.250
|
$1.250
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
300.000
|
$15.000
|
$1.000
|
$8.630
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
1,500.000
|
$1.250
|
$1.000
|
$4.340
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
1,500.000
|
$3.540
|
$1.000
|
$4.340
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
40.000
|
$2,000.000
|
$1,500.000
|
$2,511.040
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
75.000
|
$3,500.000
|
$500.000
|
$1,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
500.000
|
$385.000
|
$90.000
|
$125.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
20.000
|
$390.000
|
$175.000
|
$385.840
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
10.000
|
$548.000
|
$225.000
|
$385.840
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$515.000
|
$400.000
|
$608.580
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$710.000
|
$500.000
|
$757.080
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$970.000
|
$500.000
|
$1,499.530
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$950.000
|
$500.000
|
$1,499.530
|
|
|
STUMP REMOVAL
|
EA
|
20.000
|
$362.000
|
$200.000
|
$300.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
10.000
|
$275.000
|
$3,000.000
|
$4,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
10,000.000
|
$12.000
|
$6.000
|
$1.250
|
|
|
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
|
CY
|
500.000
|
$19.000
|
$65.000
|
$23.820
|
|
|
DRAIN INLET CLEANING
|
EA
|
2,000.000
|
$80.000
|
$65.000
|
$68.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
10.000
|
$1,937.000
|
$1,700.000
|
$1,877.700
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
10.000
|
$865.000
|
$350.000
|
$402.400
|
|
|
DOWNSPOUT CLEANING
|
EA
|
50.000
|
$230.000
|
$300.000
|
$160.900
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
100.000
|
$5.000
|
$5.000
|
$3.800
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
2,000.000
|
$7.500
|
$4.550
|
$5.100
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
15,000.000
|
$9.000
|
$5.000
|
$5.400
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
40,000.000
|
$8.500
|
$5.500
|
$5.600
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
50,000.000
|
$10.000
|
$6.500
|
$5.900
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
60,000.000
|
$10.500
|
$7.000
|
$8.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
1,000.000
|
$12.500
|
$8.250
|
$9.700
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
110.000
|
$14.000
|
$15.000
|
$11.800
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$14.530
|
$18.000
|
$15.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
90.000
|
$21.000
|
$21.000
|
$18.200
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
50.000
|
$21.500
|
$24.000
|
$19.900
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,600.000
|
$21.000
|
$20.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
75.000
|
$45.000
|
$100.000
|
$19.490
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
75.000
|
$40.000
|
$100.000
|
$45.100
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
150.000
|
$30.000
|
$40.000
|
$32.050
|
|
|
RAISE RAIL ELEMENT
|
LF
|
100.000
|
$8.000
|
$20.000
|
$3.180
|
|
|
REALIGN EXISTING RAIL
|
LF
|
100.000
|
$15.000
|
$20.000
|
$1.270
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
30.000
|
$55.000
|
$40.000
|
$40.800
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
450.000
|
$75.000
|
$110.000
|
$111.090
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$29.000
|
$356.000
|
$530.280
|
|
|
REALIGN POSTS
|
EA
|
90.000
|
$27.000
|
$50.000
|
$7.940
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,000.000
|
$41.000
|
$32.000
|
$35.610
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
50.000
|
$200.000
|
$400.000
|
$219.920
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
20.000
|
$120.000
|
$400.000
|
$127.030
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
30.000
|
$3,000.000
|
$3,500.000
|
$4,193.150
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$865.000
|
$1,200.000
|
$1,403.960
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$200.000
|
$250.000
|
$264.650
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
40.000
|
$47.920
|
$150.000
|
$163.200
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
24.000
|
$57.270
|
$150.000
|
$109.920
|
|
|
REPLACE SGT STRUT
|
EA
|
12.000
|
$38.100
|
$80.000
|
$103.120
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
20.000
|
$35.630
|
$150.000
|
$29.010
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
6.000
|
$169.530
|
$350.000
|
$530.280
|
|
|
REPLACE SINGLE GDRAIL TERM POST(WOOD)
|
EA
|
125.000
|
$65.000
|
$75.000
|
$173.470
|
|
|
REPLACE SINGLE GDRAIL TERM POST(STEEL)
|
EA
|
200.000
|
$300.000
|
$150.000
|
$334.320
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
3,000.000
|
$150.000
|
$140.000
|
$230.020
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
16.000
|
$246.000
|
$500.000
|
$491.810
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
5.000
|
$136.000
|
$500.000
|
$362.890
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
15.000
|
$1,600.000
|
$1,500.000
|
$362.890
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$7.000
|
$1.000
|
$8.130
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
225.000
|
$375.000
|
$625.000
|
$396.980
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
1,000.000
|
$36.000
|
$10.000
|
$21.940
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
10.000
|
$120.000
|
$500.000
|
$317.580
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
8.000
|
$1,500.000
|
$250.000
|
$493.740
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
4.000
|
$3,000.000
|
$250.000
|
$493.740
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
5.000
|
$1,170.000
|
$250.000
|
$318.300
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
4.000
|
$2,700.000
|
$250.000
|
$493.740
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
2.000
|
$1,800.000
|
$5,000.000
|
$318.310
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
2.000
|
$1,200.000
|
$5,000.000
|
$397.870
|
|
|
REMOVE / REPLACE (QUAD - ELITE) NARROW
|
EA
|
1.000
|
$24,000.000
|
$25,000.000
|
$25,000.000
|
|
|
REMOVE / REPLACE (QUAD - ELITE) WIDE
|
EA
|
1.000
|
$36,000.000
|
$35,000.000
|
$21,600.000
|
|
|
REPAIR (QUADGUARD - ELITE) (CYLINDER)
|
EA
|
2.000
|
$2,400.000
|
$5,000.000
|
$318.310
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
5.000
|
$24,000.000
|
$27,000.000
|
$35,592.130
|
|
|
REPAIR (SMTC) (N)
|
EA
|
5.000
|
$2,500.000
|
$4,000.000
|
$795.740
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
10.000
|
$36,000.000
|
$20,000.000
|
$48,500.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
10.000
|
$3,000.000
|
$3,000.000
|
$795.740
|
|
|
REPAIR REACT (W) (DIAPHRAGM)
|
EA
|
2.000
|
$600.000
|
$800.000
|
$795.770
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
100.000
|
$110.000
|
$100.000
|
$148.800
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
2,000.000
|
$6.000
|
$5.000
|
$9.170
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
10,000.000
|
$5.750
|
$8.000
|
$7.420
|
|
|
SOUND WALL (12 FT)
|
LF
|
48.000
|
$650.000
|
$50.000
|
$96.570
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$150.000
|
$300.000
|
$1,000.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
740,000.000
|
$1.600
|
$0.700
|
$0.730
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
82,000.000
|
$2.000
|
$0.700
|
$0.440
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
5,000.000
|
$2.680
|
$2.500
|
$2.600
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
125,000.000
|
$3.000
|
$1.000
|
$1.040
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
18,000.000
|
$2.250
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
8,000.000
|
$3.750
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
1,000.000
|
$3.100
|
$8.000
|
$8.320
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
680,000.000
|
$1.750
|
$0.700
|
$0.730
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
1,000.000
|
$4.000
|
$4.000
|
$4.160
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
1,000.000
|
$9.000
|
$8.000
|
$8.320
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
100.000
|
$1,000.000
|
$250.000
|
$1,900.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
10.000
|
$750.000
|
$200.000
|
$1,925.000
|
|
|
REPL LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
10.000
|
$1,270.000
|
$200.000
|
$3,145.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
45.000
|
$365.000
|
$200.000
|
$2,930.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
350.000
|
$500.000
|
$575.000
|
$600.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
20.000
|
$230.000
|
$100.000
|
$285.000
|
|
|
REPLACE SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
10.000
|
$900.000
|
$100.000
|
$485.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
12.000
|
$175.000
|
$100.000
|
$135.000
|
|
|
TMA (STATIONARY)
|
DAY
|
156.000
|
$340.000
|
$560.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
5,700.000
|
$75.000
|
$70.000
|
$50.000
|
|
|
TMA (MOBILE OPERATIONS) (SNOW & ICE)
|
HR
|
72.000
|
$120.000
|
$250.000
|
$50.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
40.000
|
$315.000
|
$150.000
|
$196.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
40.000
|
$380.000
|
$100.000
|
$238.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
40.000
|
$500.000
|
$150.000
|
$238.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
20.000
|
$250.000
|
$100.000
|
$196.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
20.000
|
$300.000
|
$100.000
|
$196.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
20.000
|
$300.000
|
$100.000
|
$238.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
40.000
|
$400.000
|
$150.000
|
$196.000
|
|
|
INCIDENT MANAGEMENT (TYPE J)
|
HR
|
40.000
|
$75.000
|
$50.000
|
$18.000
|
|
|
VACUUM CLEANING OF BRIDGE JOINTS
|
CYC
|
4.000
|
$38,000.000
|
$45,000.000
|
$9,000.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
500.000
|
$40.000
|
$120.000
|
$110.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
216.000
|
$60.000
|
$90.000
|
$1.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
72.000
|
$90.000
|
$50.000
|
$125.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$35,000.000
|
$35,000.000
|
$50,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$200.000
|
$100.000
|
$350.000
|
|
Totals: |
$27,205,771.480
|
$14,959,422.620
|
$15,743,842.660
|