HARRIS SH0099 (6467-71-001)

Items: 372

County: HARRIS
Length: N/A
Highway: SH0099
District: HOUSTON
Control Number: 6467-71-001
DBE Goal: 0.0%
Project: RMC - 646771001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $27,205,771.48
Date: 08/02/2024 (1 year ago) Changed
Contract Number: N/A
Type: BUNDLED BID
Mail/Deliver Bids To: N/A
PHILLIP GARLIN
REGINALD PHIPPS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$27,205,771.48
$14,959,422.62
Over/Under Est: -45.01% -$12,246,348.86
$15,743,842.66
Over/Under Est: -42.13% -$11,461,928.82
Amt Left: 5.24% $784,420.04
Subcontractor Percentage Amount
BOEN LANDSCAPING & IRRIGATION, LLC 0.00% $0.00
WAYNE YANCEY, INC. 0.00% $0.00
XTREME PRO CLEANING LLC 0.00% $0.00
YES AMERICA NOW, INC. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

372 Total 0 of 372
HARRIS  |  SH0099  |  HOUSTON  |  6467-71-001  |  08/02/2024  |  $27,205,771.48  |  RMC - 646771001  |  BUNDLED BID  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 100.000 $93.000 $50.000 $11.000
REMOVING CONC (MEDIANS)
SY 10.000 $35.000 $200.000 $11.000
REMOVING CONC (FOUNDATIONS)
CY 20.000 $130.000 $300.000 $165.000
REMOVING CONC (CURB)
LF 400.000 $14.000 $15.000 $3.000
REMOVING CONC (MISC)
SY 25.000 $69.000 $150.000 $132.000
EXCAVATION (CHANNEL)
CY 300.000 $34.000 $20.000 $35.000
BACKFILL (TY A OR B)
CY 100.000 $390.000 $100.000 $15.000
BLADING
STA 800.000 $216.000 $100.000 $150.000
COMPOST MANUF TOPSOIL (4")
SY 2,000.000 $3.750 $1.000 $4.000
SPOT SODDING
SY 1,000.000 $49.000 $20.000 $12.690
BLOCK SODDING
SY 2,000.000 $13.720 $15.000 $25.000
ROLL SODDING
SY 500.000 $5.600 $20.000 $12.690
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 2,000.000 $0.570 $2.000 $5.840
FERTILIZER
AC 10.000 $1,569.300 $500.000 $2,105.330
VEGETATIVE WATERING
MG 1,500.000 $175.000 $30.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 800.000 $149.000 $100.000 $76.030
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 2,000.000 $51.000 $70.000 $32.750
FULL - DEPTH REPAIR CRCP (15")
SY 50.000 $348.000 $805.000 $625.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 25.000 $510.750 $750.000 $633.580
FULL - DEPTH REPAIR CRCP (8"-14")
SY 300.000 $360.000 $350.000 $550.000
STRUCT EXCAV (BOX)
CY 100.000 $54.020 $60.000 $34.610
STRUCT EXCAV (PIPE)
CY 100.000 $79.000 $60.000 $34.610
CEM STABIL BKFL
CY 100.000 $78.000 $150.000 $102.420
CEMENT STAB BACKFILL (INLET OR MH)
CY 50.000 $103.000 $70.000 $63.160
FLOWABLE BACKFILL
CY 50.000 $529.260 $400.000 $388.800
TRENCH EXCAVATION PROTECTION
LF 100.000 $50.000 $45.000 $13.080
DRILL SHAFT (SIGN MTS) (12 IN)
LF 100.000 $174.000 $150.000 $214.540
DRILL SHAFT (SIGN MTS) (24 IN)
LF 100.000 $260.000 $250.000 $214.540
CONCRETE PAINT FINISH
SF 15,000.000 $1.380 $6.000 $1.090
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 200.000 $275.000 $110.000 $61.380
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 100.000 $285.000 $160.000 $147.490
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 100.000 $345.000 $160.000 $147.490
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 50.000 $550.000 $260.000 $155.180
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 400.000 $373.560 $160.000 $103.540
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 75.000 $350.000 $160.000 $103.540
CONC STR REPAIR (STANDARD)
SF 600.000 $350.000 $150.000 $77.760
RIPRAP (CONC)(6 IN)
CY 75.000 $717.000 $500.000 $1,250.000
RIPRAP (CONC)(CL B)
CY 15.000 $400.000 $750.000 $850.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 300.000 $201.740 $200.000 $148.200
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 300.000 $352.220 $200.000 $99.080
RIPRAP (CONC)(FLUME)
CY 100.000 $783.040 $700.000 $670.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $500.000 $700.000 $406.570
CLEANING AND SEALING EXISTING JOINTS
LF 1,500.000 $43.310 $20.000 $16.000
CLEANING AND SEALING JOINTS (CL 7)
LF 700.000 $37.580 $90.000 $44.640
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 90.000 $200.000 $200.000 $151.690
INLET (COMPL)(TY AAD)
EA 2.000 $8,500.000 $1,000.000 $4,332.570
INLET (COMPL)(CURB)(TY C1)
EA 2.000 $7,578.670 $1,000.000 $2,695.090
INLET (STG II)(TY C)
EA 2.000 $6,810.150 $3,550.000 $2,695.090
GRATE & FRAME
EA 2.000 $3,600.000 $2,250.000 $1,611.970
FRAME & COVER
EA 2.000 $7,530.000 $3,000.000 $1,611.970
RING & COVER
EA 2.000 $1,700.000 $3,000.000 $1,611.970
GRATE AND FRAME (BRIDGE DRAIN)
EA 2.000 $4,400.000 $2,000.000 $360.360
ADJUSTING MANHOLES & INLETS
EA 10.000 $2,000.000 $1,000.000 $1,042.090
MOBILIZATION (CALLOUT)
EA 500.000 $800.000 $1.000 $457.940
MOBILIZATION (EMERGENCY)
EA 50.000 $1,271.300 $1,500.000 $915.870
EMBANK (EROSN & SEDMT CONT, IN PLACE)
CY 500.000 $30.000 $65.000 $100.000
EXCAV (EROSN & SEDMT CONT, IN VEH)
CY 500.000 $32.000 $65.000 $100.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $13.630 $50.000 $12.090
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $20.410 $15.000 $10.950
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 560.000 $24.000 $15.000 $10.950
LANDSCAPE PAVERS
SY 150.000 $26.000 $1.000 $153.370
REMOVE AND RELAY PAVERS
SY 400.000 $32.000 $10.000 $73.420
CONC CURB (TY II)
LF 1,000.000 $30.000 $40.000 $9.740
CONC CURB & GUTTER (SLOTTED)
LF 100.000 $80.000 $185.000 $51.860
CONC CURB & GUTTER(VALLEY GUTTER)(36")
LF 500.000 $38.000 $165.000 $79.130
CONC SIDEWALKS (4")
SY 50.000 $80.000 $100.000 $99.230
RUMBLE STRIPS (SHOULDER)
LF 2,000.000 $8.500 $5.000 $5.880
MTL W-BEAM GD FEN (STEEL POST)
LF 200.000 $30.000 $30.000 $48.680
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,500.000 $2,000.000 $2,007.460
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $5.400 $10.000 $1.820
CABLE BARRIER SYSTEM (TL-3)
LF 200.000 $28.150 $1.000 $39.300
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,361.170 $4,000.000 $3,579.440
GDRAIL END TRT(INSTALL)(HBA POST)
EA 4.000 $4,600.000 $5,000.000 $4,749.070
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $900.000 $1,000.000 $795.740
CRASH CUSH ATTEN (STKPL)
EA 2.000 $900.000 $3,000.000 $318.310
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $2,000.000 $1,000.000 $318.300
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 2.000 $28,000.000 $32,000.000 $36,387.870
CRASH CUSH ATTEN (INSTL)(L)(W)(70)
EA 2.000 $38,000.000 $42,000.000 $25,517.050
CHAIN LINK FENCE (INSTALL) (6')
LF 1,000.000 $45.000 $17.000 $52.630
CHAIN LINK FENCE (REPAIR) (6')
LF 4,000.000 $16.600 $16.000 $17.540
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 3.000 $1,500.000 $1,500.000 $321.640
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 4.000 $1,000.000 $1,500.000 $1,169.620
ALUMINUM SIGNS (TY A)
SF 2,000.000 $39.000 $22.000 $27.320
ALUMINUM SIGNS (TY G)
SF 400.000 $37.000 $35.000 $79.800
ALUMINUM SIGNS (TY O)
SF 100.000 $40.000 $100.000 $52.660
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 500.000 $50.000 $50.000 $27.320
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 500.000 $40.000 $40.000 $79.800
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 200.000 $40.000 $100.000 $23.180
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 120.000 $2,859.790 $1.000 $935.810
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 100.000 $3,273.010 $1.000 $935.810
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,000.000 $18.000 $18.000 $16.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $20.000 $15.000 $21.180
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3,000.000 $34.000 $30.000 $29.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 2,000.000 $34.000 $50.000 $29.500
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 400.000 $37.000 $50.000 $29.500
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $50.000 $50.000 $29.500
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 20.000 $43.000 $55.000 $37.680
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,500.000 $1.650 $2.000 $1.820
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 1,000.000 $2.060 $2.000 $2.080
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,000.000 $2.060 $1.500 $0.940
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,500.000 $3.470 $4.000 $4.160
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 9,000.000 $365.000 $3.520 $2.180
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,000.000 $8.500 $7.100 $7.280
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 200.000 $123.000 $200.000 $182.050
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 100.000 $220.000 $205.000 $208.050
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 80.000 $250.000 $215.000 $208.050
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 30.000 $283.330 $210.000 $208.050
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 80.000 $180.000 $250.000 $208.050
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 40.000 $635.720 $450.000 $468.120
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 40.000 $722.690 $550.000 $572.140
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 20,000.000 $1.910 $0.910 $0.940
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 4,000.000 $4.480 $3.010 $3.120
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 2,000.000 $8.800 $6.000 $6.240
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 30,000.000 $1.760 $1.050 $1.040
REFL PAV MRK TY II (W) 12" (SLD)
LF 100.000 $2.750 $2.000 $2.080
REFL PAV MRK TY II (Y) 12" (SLD)
LF 300.000 $2.150 $2.000 $2.080
PAVEMENT SEALER 4"
LF 400.000 $0.500 $0.100 $0.100
PAVEMENT SEALER 6"
LF 1,582,500.000 $0.400 $0.050 $0.100
PAVEMENT SEALER 8"
LF 155,000.000 $0.400 $0.210 $0.220
PAVEMENT SEALER 12"
LF 41,900.000 $0.800 $0.230 $0.240
PAVEMENT SEALER 24"
LF 7,000.000 $1.600 $1.000 $0.480
PAVEMENT SEALER (ARROW)
EA 200.000 $40.000 $50.000 $10.400
PAVEMENT SEALER (WORD)
EA 80.000 $42.000 $100.000 $10.400
PAVEMENT SEALER (DBL ARROW)
EA 100.000 $65.000 $40.000 $20.810
PAVEMENT SEALER (UTURN ARROW)
EA 80.000 $38.000 $50.000 $26.010
PAVEMENT SEALER (LNDP ARROW)
EA 30.000 $50.000 $30.000 $26.010
PAVEMENT SEALER (ENTR GORE)
EA 40.000 $145.000 $100.000 $104.030
PAVEMENT SEALER (EXIT GORE)
EA 40.000 $145.000 $100.000 $104.030
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 200.000 $1.150 $0.600 $0.620
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 30,000.000 $0.850 $1.100 $0.880
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,000.000 $0.750 $1.800 $0.880
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 200.000 $1.000 $1.000 $0.620
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,000.000 $0.900 $1.800 $0.880
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 2,000.000 $2.000 $2.000 $1.040
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 2,000.000 $2.000 $3.500 $2.600
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 5,000.000 $10.000 $16.000 $15.600
PREFAB PAV MRK TY B (MULTI)(SHIELD)
EA 6.000 $2,500.000 $3,000.000 $3,120.790
REFL PAV MRKR TY I-A
EA 40.000 $6.100 $10.000 $6.240
REFL PAV MRKR TY I-C
EA 40.000 $6.750 $10.000 $6.240
REFL PAV MRKR TY II-A-A
EA 100.000 $9.000 $10.000 $6.240
REFL PAV MRKR TY II-C-R
EA 4,000.000 $9.000 $10.000 $6.240
ELIM EXT PAV MRK & MRKS (4")
LF 400.000 $0.420 $1.000 $0.260
ELIM EXT PAV MRK & MRKS (6")
LF 1,582,500.000 $0.520 $0.250 $0.420
ELIM EXT PAV MRK & MRKS (8")
LF 155,000.000 $1.250 $0.550 $0.620
ELIM EXT PAV MRK & MRKS (12")
LF 14,900.000 $2.000 $2.050 $2.080
ELIM EXT PAV MRK & MRKS (24")
LF 7,000.000 $4.000 $4.050 $4.160
ELIM EXT PAV MRK & MRKS (ARROW)
EA 200.000 $80.000 $75.000 $52.010
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 100.000 $95.000 $70.000 $62.420
ELIM EXT PAV MRK & MRKS (WORD)
EA 80.000 $80.000 $150.000 $52.010
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 40.000 $330.000 $250.000 $260.070
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 40.000 $350.000 $250.000 $260.070
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 6.000 $246.500 $250.000 $260.070
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 26.000 $70.000 $100.000 $52.010
PAV SURF PREP FOR MRK (4")
LF 400.000 $0.400 $1.000 $0.050
PAV SURF PREP FOR MRK (6")
LF 1,582,500.000 $0.500 $0.050 $0.010
PAV SURF PREP FOR MRK (8")
LF 155,000.000 $0.400 $0.100 $0.020
PAV SURF PREP FOR MRK (12")
LF 14,900.000 $1.450 $0.300 $0.260
PAV SURF PREP FOR MRK (24")
LF 7,000.000 $2.600 $0.600 $0.520
PAV SURF PREP FOR MRK (ARROW)
EA 200.000 $15.000 $15.000 $5.200
PAV SURF PREP FOR MRK (DBL ARROW)
EA 100.000 $20.000 $10.000 $5.200
PAV SURF PREP FOR MRK (UTURN ARR)
EA 26.000 $25.000 $50.000 $5.200
PAV SURF PREP FOR MRK (WORD)
EA 200.000 $27.020 $50.000 $5.200
PAV SURF PREP FOR MRK (ENTR GORE)
EA 40.000 $144.170 $15.000 $10.400
PAV SURF PREP FOR MRK (EXIT GORE)
EA 40.000 $184.170 $15.000 $10.400
PAV SURF PREP FOR MRKS (SHIELD)
EA 6.000 $150.000 $10.000 $10.400
PAV SURF PREP FOR MRK (RPM)
EA 4,180.000 $4.000 $2.000 $1.040
POTHOLE REPAIR (STANDARD)
SY 30.000 $280.000 $400.000 $451.930
POTHOLE REPAIR (SAW - CUT)
SY 200.000 $150.000 $110.000 $48.400
JT / CRCK SEAL (RUBBER - ASPHALT)
LMI 40.000 $850.000 $1,650.000 $957.700
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 50.000 $273.000 $350.000 $81.350
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 200.000 $125.000 $70.000 $176.260
FIBER REINFORCED POLYMER PATCHING MATLS
LB 3,000.000 $30.000 $8.000 $2.730
SPOT MOWING
AC 50.000 $100.000 $150.000 $38.000
FULL - WIDTH MOWING - TRACT (1)
AC 324.000 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (2)
AC 6,944.980 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (3)
AC 7,467.600 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (4)
AC 5,840.100 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (5)
AC 3,430.980 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (6)
AC 8,031.000 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (7)
AC 3,416.000 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (8)
AC 742.000 $52.000 $35.000 $38.000
FULL - WIDTH MOWING - TRACT (9)
AC 828.000 $57.000 $35.000 $38.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 1,014.560 $590.000 $500.000 $120.000
BROADCAST APPLICATION
AC 600.000 $245.000 $50.000 $36.050
WICK APPLICATION OF HERBICIDE
AC 75.000 $50.000 $1.000 $285.090
LITTER REMOVAL (SPOT)
AC 30.000 $50.000 $1,000.000 $133.000
LITTER REMOVAL - TRACT (1)
CYC 48.000 $255.000 $277.920 $2,208.000
LITTER REMOVAL - TRACT (2)
CYC 48.000 $5,000.000 $5,952.840 $2,208.000
LITTER REMOVAL - TRACT (3)
CYC 48.000 $5,500.000 $6,400.800 $2,208.000
LITTER REMOVAL - TRACT (4)
CYC 48.000 $3,400.000 $4,028.280 $2,208.000
LITTER REMOVAL - TRACT (5)
CYC 48.000 $820.000 $977.520 $2,208.000
LITTER REMOVAL - TRACT (6)
CYC 48.000 $560.000 $2,940.840 $2,208.000
LITTER REMOVAL - TRACT (7)
CYC 48.000 $2,500.000 $890.040 $2,208.000
LITTER REMOVAL - TRACT (8)
CYC 48.000 $760.000 $636.000 $2,208.000
LITTER REMOVAL - TRACT (9)
CYC 48.000 $1,100.000 $828.000 $2,208.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 150.000 $55.000 $350.000 $503.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 48.000 $180.000 $200.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 48.000 $1,750.000 $1,650.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 48.000 $1,350.000 $1,250.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
CYC 48.000 $1,350.000 $1,250.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
CYC 48.000 $300.000 $250.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
CYC 48.000 $1,300.000 $1,250.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
CYC 48.000 $800.000 $750.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
CYC 48.000 $250.000 $200.000 $330.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (9)
CYC 48.000 $250.000 $500.000 $330.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 48.000 $600.000 $750.000 $330.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 48.000 $600.000 $750.000 $330.000
DEBRIS-DIRECT CONNECTOR - AREA (4)
CYC 48.000 $400.000 $500.000 $330.000
DEBRIS-DIRECT CONNECTOR - AREA (5)
CYC 48.000 $600.000 $500.000 $330.000
DEBRIS-DIRECT CONNECTOR - AREA (6)
CYC 48.000 $600.000 $500.000 $330.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 80.000 $150.000 $400.000 $124.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $770.000 $310.000 $124.000
CLEANING / SWEEPING (HANDWORK)
SY 600,000.000 $1.500 $0.400 $0.350
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 48.000 $256.000 $200.000 $198.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 48.000 $2,528.000 $1,200.000 $1,955.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 48.000 $1,904.000 $900.000 $1,473.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
CYC 48.000 $1,905.600 $900.000 $1,474.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
CYC 48.000 $292.800 $200.000 $226.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
CYC 48.000 $1,857.600 $900.000 $1,437.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
CYC 48.000 $1,108.800 $500.000 $858.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
CYC 48.000 $291.200 $200.000 $225.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(9)
CYC 48.000 $250.000 $200.000 $223.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 48.000 $256.000 $200.000 $198.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 48.000 $2,528.000 $1,200.000 $1,955.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 48.000 $1,904.000 $900.000 $1,473.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
CYC 48.000 $1,905.600 $900.000 $1,474.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
CYC 48.000 $292.800 $200.000 $226.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
CYC 48.000 $1,857.600 $900.000 $1,437.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
CYC 48.000 $1,108.800 $500.000 $858.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
CYC 48.000 $291.200 $200.000 $225.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(9)
CYC 48.000 $250.000 $200.000 $223.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 24.000 $430.000 $200.000 $198.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 24.000 $2,050.000 $1,200.000 $1,955.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 24.000 $1,590.000 $900.000 $1,473.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
CYC 24.000 $1,590.000 $900.000 $1,474.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(5)
CYC 24.000 $245.000 $200.000 $226.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
CYC 24.000 $1,530.000 $900.000 $1,437.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
CYC 24.000 $915.000 $500.000 $858.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
CYC 24.000 $240.000 $200.000 $225.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(9)
CYC 24.000 $240.000 $200.000 $223.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 24.000 $250.000 $200.000 $198.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 24.000 $2,000.000 $1,200.000 $1,955.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 24.000 $1,570.000 $900.000 $1,473.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
CYC 24.000 $1,570.000 $900.000 $1,474.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
CYC 24.000 $250.000 $200.000 $226.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
CYC 24.000 $1,520.000 $900.000 $1,437.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
CYC 24.000 $940.000 $500.000 $858.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
CYC 24.000 $250.000 $200.000 $225.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 9)
CYC 24.000 $250.000 $200.000 $223.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 48.000 $1,000.000 $200.000 $202.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 48.000 $1,000.000 $1,200.000 $1,955.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
CYC 48.000 $500.000 $900.000 $1,474.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
CYC 48.000 $500.000 $200.000 $226.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
CYC 48.000 $500.000 $900.000 $1,437.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 1,500.000 $3.000 $1.000 $1.000
GRAFFITI REMOVAL (PAINTING)
SF 100,000.000 $7.000 $3.250 $1.250
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 300.000 $15.000 $1.000 $8.630
ANTI - GRAFFITI COATING(PERMNENT-TY II)
SF 1,500.000 $1.250 $1.000 $4.340
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 1,500.000 $3.540 $1.000 $4.340
TREE TRIMMING / BRUSH REMOVAL
MI 40.000 $2,000.000 $1,500.000 $2,511.040
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 75.000 $3,500.000 $500.000 $1,500.000
TREE REMOVAL (4" - 12" DIA)
EA 500.000 $385.000 $90.000 $125.000
TREE REMOVAL (12" - 18" DIA)
EA 20.000 $390.000 $175.000 $385.840
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $548.000 $225.000 $385.840
TREE REMOVAL (24" - 30" DIA)
EA 15.000 $515.000 $400.000 $608.580
TREE REMOVAL (30" - 36" DIA)
EA 6.000 $710.000 $500.000 $757.080
TREE REMOVAL (36" - 42" DIA)
EA 6.000 $970.000 $500.000 $1,499.530
TREE REMOVAL (42" - 48" DIA)
EA 6.000 $950.000 $500.000 $1,499.530
STUMP REMOVAL
EA 20.000 $362.000 $200.000 $300.000
TREE AND BRUSH REMOVAL
AC 10.000 $275.000 $3,000.000 $4,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 10,000.000 $12.000 $6.000 $1.250
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
CY 500.000 $19.000 $65.000 $23.820
DRAIN INLET CLEANING
EA 2,000.000 $80.000 $65.000 $68.000
PUMP STATION WELL CLEANING
EA 10.000 $1,937.000 $1,700.000 $1,877.700
BASKET AND INLET PIPE CLEANING
EA 10.000 $865.000 $350.000 $402.400
DOWNSPOUT CLEANING
EA 50.000 $230.000 $300.000 $160.900
STORM SEWER CLEANING (PIPE) (<12" DIA)
LF 100.000 $5.000 $5.000 $3.800
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 2,000.000 $7.500 $4.550 $5.100
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 15,000.000 $9.000 $5.000 $5.400
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 40,000.000 $8.500 $5.500 $5.600
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 50,000.000 $10.000 $6.500 $5.900
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 60,000.000 $10.500 $7.000 $8.000
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 1,000.000 $12.500 $8.250 $9.700
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 110.000 $14.000 $15.000 $11.800
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $14.530 $18.000 $15.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 90.000 $21.000 $21.000 $18.200
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 50.000 $21.500 $24.000 $19.900
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,600.000 $21.000 $20.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $45.000 $100.000 $19.490
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 75.000 $40.000 $100.000 $45.100
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 150.000 $30.000 $40.000 $32.050
RAISE RAIL ELEMENT
LF 100.000 $8.000 $20.000 $3.180
REALIGN EXISTING RAIL
LF 100.000 $15.000 $20.000 $1.270
REM / REPL TIMBER/STL POST W/O CONC FND
EA 30.000 $55.000 $40.000 $40.800
REM / REPL TIMBER / STL POST W/CONC FND
EA 450.000 $75.000 $110.000 $111.090
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $29.000 $356.000 $530.280
REALIGN POSTS
EA 90.000 $27.000 $50.000 $7.940
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,000.000 $41.000 $32.000 $35.610
REPLACE HINGED TOP SGT STEEL POST
EA 50.000 $200.000 $400.000 $219.920
RESET HINGED TOP SGT STL POST
EA 20.000 $120.000 $400.000 $127.030
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $3,000.000 $3,500.000 $4,193.150
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $865.000 $1,200.000 $1,403.960
REM & RESET SGT IMPACT HEAD
EA 30.000 $200.000 $250.000 $264.650
REPLACE SGT CABLE ASSEMBLY
EA 40.000 $47.920 $150.000 $163.200
REPLACE SGT CABLE ANCHOR
EA 24.000 $57.270 $150.000 $109.920
REPLACE SGT STRUT
EA 12.000 $38.100 $80.000 $103.120
REPLACE SGT OBJECT MARKER
EA 20.000 $35.630 $150.000 $29.010
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $169.530 $350.000 $530.280
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 125.000 $65.000 $75.000 $173.470
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 200.000 $300.000 $150.000 $334.320
REPLACE POSTS (TL-3)
EA 3,000.000 $150.000 $140.000 $230.020
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 16.000 $246.000 $500.000 $491.810
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $136.000 $500.000 $362.890
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $1,600.000 $1,500.000 $362.890
REPLACE CABLE (TL-3)
LF 1,000.000 $7.000 $1.000 $8.130
CHECK / RE-TENSION CABLE
EA 225.000 $375.000 $625.000 $396.980
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,000.000 $36.000 $10.000 $21.940
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 10.000 $120.000 $500.000 $317.580
REPAIR REACT (N) (MISC HARDWARE)
EA 8.000 $1,500.000 $250.000 $493.740
REPAIR REACT (N) (CYLINDERS)
EA 4.000 $3,000.000 $250.000 $493.740
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $1,170.000 $250.000 $318.300
REPAIR REACT (W) (CYLINDERS)
EA 4.000 $2,700.000 $250.000 $493.740
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 2.000 $1,800.000 $5,000.000 $318.310
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 2.000 $1,200.000 $5,000.000 $397.870
REMOVE / REPLACE (QUAD - ELITE) NARROW
EA 1.000 $24,000.000 $25,000.000 $25,000.000
REMOVE / REPLACE (QUAD - ELITE) WIDE
EA 1.000 $36,000.000 $35,000.000 $21,600.000
REPAIR (QUADGUARD - ELITE) (CYLINDER)
EA 2.000 $2,400.000 $5,000.000 $318.310
REMOVE AND REPLACE (SMTC) (N)
EA 5.000 $24,000.000 $27,000.000 $35,592.130
REPAIR (SMTC) (N)
EA 5.000 $2,500.000 $4,000.000 $795.740
REMOVE AND REPLACE (SMTC) (W)
EA 10.000 $36,000.000 $20,000.000 $48,500.000
REPAIR (SMTC) (W)
EA 10.000 $3,000.000 $3,000.000 $795.740
REPAIR REACT (W) (DIAPHRAGM)
EA 2.000 $600.000 $800.000 $795.770
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 100.000 $110.000 $100.000 $148.800
INSTL TIED CONCRETE EROSN CONTROL MATS
SF 2,000.000 $6.000 $5.000 $9.170
RAISING AND UNDERSEALING CONCRETE SLAB
LB 10,000.000 $5.750 $8.000 $7.420
SOUND WALL (12 FT)
LF 48.000 $650.000 $50.000 $96.570
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $150.000 $300.000 $1,000.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 740,000.000 $1.600 $0.700 $0.730
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 82,000.000 $2.000 $0.700 $0.440
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 5,000.000 $2.680 $2.500 $2.600
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 125,000.000 $3.000 $1.000 $1.040
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 18,000.000 $2.250 $3.000 $2.500
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 8,000.000 $3.750 $3.000 $2.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,000.000 $3.100 $8.000 $8.320
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 680,000.000 $1.750 $0.700 $0.730
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 1,000.000 $4.000 $4.000 $4.160
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 1,000.000 $9.000 $8.000 $8.320
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 100.000 $1,000.000 $250.000 $1,900.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 10.000 $750.000 $200.000 $1,925.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 10.000 $1,270.000 $200.000 $3,145.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 45.000 $365.000 $200.000 $2,930.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 350.000 $500.000 $575.000 $600.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 20.000 $230.000 $100.000 $285.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 10.000 $900.000 $100.000 $485.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 12.000 $175.000 $100.000 $135.000
TMA (STATIONARY)
DAY 156.000 $340.000 $560.000 $300.000
TMA (MOBILE OPERATION)
HR 5,700.000 $75.000 $70.000 $50.000
TMA (MOBILE OPERATIONS) (SNOW & ICE)
HR 72.000 $120.000 $250.000 $50.000
INCIDENT MANAGEMENT (TYPE A)
HR 40.000 $315.000 $150.000 $196.000
INCIDENT MANAGEMENT (TYPE B)
HR 40.000 $380.000 $100.000 $238.000
INCIDENT MANAGEMENT (TYPE E)
HR 40.000 $500.000 $150.000 $238.000
INCIDENT MANAGEMENT (TYPE F)
HR 20.000 $250.000 $100.000 $196.000
INCIDENT MANAGEMENT (TYPE G)
HR 20.000 $300.000 $100.000 $196.000
INCIDENT MANAGEMENT (TYPE H)
HR 20.000 $300.000 $100.000 $238.000
INCIDENT MANAGEMENT (TYPE I)
HR 40.000 $400.000 $150.000 $196.000
INCIDENT MANAGEMENT (TYPE J)
HR 40.000 $75.000 $50.000 $18.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 4.000 $38,000.000 $45,000.000 $9,000.000
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $40.000 $120.000 $110.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 216.000 $60.000 $90.000 $1.000
SNOW AND ICE CONTROL (LOADER)
HR 72.000 $90.000 $50.000 $125.000
SNOW AND ICE CONTROL (SEASON)
MO 6.000 $35,000.000 $35,000.000 $50,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $200.000 $100.000 $350.000
Totals: $27,205,771.480 $14,959,422.620 $15,743,842.660