BLADING
|
STA
|
2,700.000
|
$300.000
|
$100.000
|
$7.000
|
$5.000
|
$100.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
10,000.000
|
$0.410
|
$4.000
|
$0.600
|
$10.000
|
$4.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
10,000.000
|
$27.740
|
$45.000
|
$5.000
|
$20.000
|
$13.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
800.000
|
$18.000
|
$40.000
|
$2.000
|
$5.000
|
$13.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
104.000
|
$1,390.140
|
$100.000
|
$450.000
|
$100.000
|
$10.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
15.000
|
$500.000
|
$2,000.000
|
$850.000
|
$2,000.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
30.000
|
$130.960
|
$250.000
|
$175.000
|
$150.000
|
$2,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$262.840
|
$500.000
|
$5,500.000
|
$1,600.000
|
$5,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
700.000
|
$65.000
|
$100.000
|
$400.000
|
$200.000
|
$400.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$15.000
|
$35.000
|
$13.000
|
$30.000
|
$16.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
200.000
|
$39.830
|
$40.000
|
$17.700
|
$32.000
|
$25.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$60.000
|
$50.000
|
$45.000
|
$30.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,500.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,400.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
10.000
|
$300.000
|
$1,000.000
|
$1,450.000
|
$1,000.000
|
$946.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$885.410
|
$1,200.000
|
$1,625.000
|
$1,300.000
|
$1,131.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
5.000
|
$384.130
|
$500.000
|
$665.000
|
$800.000
|
$870.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
5.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1.500
|
$19,812.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
75.000
|
$8.000
|
$50.000
|
$50.000
|
$5.000
|
$50.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$165.000
|
$100.000
|
$500.000
|
$225.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,249.780
|
$2,500.000
|
$2,500.000
|
$4,000.000
|
$2,880.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$1,370.000
|
$5,000.000
|
$405.000
|
$1,200.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,256.570
|
$12,000.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
3.000
|
$20,000.000
|
$22,000.000
|
$23,400.000
|
$27,800.000
|
$22,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL2)
|
EA
|
2.000
|
$28,095.750
|
$19,000.000
|
$38,400.000
|
$20,000.000
|
$37,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
3.000
|
$32,872.340
|
$32,000.000
|
$33,400.000
|
$35,300.000
|
$32,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
700.000
|
$61.620
|
$25.000
|
$28.000
|
$50.000
|
$30.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
100.000
|
$33.500
|
$40.000
|
$78.000
|
$75.000
|
$30.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
25.000
|
$30.330
|
$100.000
|
$51.000
|
$100.000
|
$70.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$35.840
|
$50.000
|
$35.000
|
$50.000
|
$30.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
50.000
|
$37.850
|
$60.000
|
$30.000
|
$75.000
|
$30.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
25.000
|
$38.270
|
$100.000
|
$33.000
|
$100.000
|
$70.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
5.000
|
$861.000
|
$1,100.000
|
$647.000
|
$880.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
5.000
|
$900.000
|
$1,200.000
|
$725.000
|
$1,230.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
1.000
|
$139.000
|
$1,000.000
|
$440.000
|
$620.000
|
$600.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
10.000
|
$2,504.000
|
$1,500.000
|
$3,900.000
|
$1,500.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
2.000
|
$4,242.470
|
$4,000.000
|
$1,725.000
|
$3,500.000
|
$3,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$3,417.320
|
$5,000.000
|
$7,347.000
|
$15,000.000
|
$10,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
20.000
|
$75.950
|
$15.000
|
$10.000
|
$50.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
|
EA
|
20.000
|
$30.090
|
$20.000
|
$11.900
|
$30.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
200.000
|
$46.000
|
$65.000
|
$12.200
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
100.000
|
$21.050
|
$15.000
|
$7.700
|
$15.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
75.000
|
$46.000
|
$65.000
|
$12.200
|
$22.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
|
EA
|
50.000
|
$46.000
|
$65.000
|
$12.200
|
$22.000
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$113.070
|
$100.000
|
$24.300
|
$70.000
|
$44.000
|
|
|
POTHOLE REPAIR(STANDARD)(0"-5" DEEP)
|
SY
|
40.000
|
$150.000
|
$150.000
|
$91.000
|
$1,395.000
|
$100.000
|
|
|
POTHOLE REPAIR(STANDARD)(5"-10" DEEP)
|
SY
|
20.000
|
$175.000
|
$200.000
|
$91.000
|
$2,000.000
|
$200.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
TON
|
50.000
|
$237.500
|
$350.000
|
$70.000
|
$2,000.000
|
$300.000
|
|
|
SPOT MOWING
|
AC
|
100.000
|
$250.000
|
$125.000
|
$52.000
|
$100.000
|
$300.000
|
|
|
LITTER REMOVAL
|
AC
|
23,400.000
|
$86.000
|
$15.500
|
$27.000
|
$45.000
|
$25.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
50.000
|
$2,000.000
|
$300.000
|
$250.000
|
$100.000
|
$200.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
1,008.000
|
$46.000
|
$225.000
|
$72.000
|
$110.000
|
$100.000
|
|
|
DEBRIS REMOVAL (DIRECT CONNECTOR)
|
MI
|
384.000
|
$33.000
|
$225.000
|
$72.000
|
$115.000
|
$100.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
20.000
|
$475.000
|
$500.000
|
$250.000
|
$125.000
|
$500.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
1,008.000
|
$82.000
|
$175.000
|
$146.000
|
$220.000
|
$100.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
1,008.000
|
$195.000
|
$175.000
|
$146.000
|
$220.000
|
$100.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
1,008.000
|
$225.000
|
$175.000
|
$146.000
|
$275.000
|
$100.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
1,728.000
|
$200.000
|
$175.000
|
$146.000
|
$220.000
|
$100.000
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
MI
|
768.000
|
$116.000
|
$175.000
|
$146.000
|
$220.000
|
$200.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
60.000
|
$320.000
|
$175.000
|
$146.000
|
$445.000
|
$400.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
40.000
|
$210.000
|
$175.000
|
$200.000
|
$450.000
|
$500.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
30,000.000
|
$1.720
|
$1.000
|
$0.750
|
$2.000
|
$1.000
|
|
|
GRAFFITI REMOVAL (WATER BLAST CLEAN)
|
SF
|
1,000.000
|
$0.750
|
$5.000
|
$1.100
|
$10.000
|
$8.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
2,000.000
|
$1.590
|
$6.000
|
$1.000
|
$10.000
|
$8.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
500.000
|
$3.630
|
$7.000
|
$9.000
|
$10.000
|
$8.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
15.000
|
$2,000.000
|
$2,000.000
|
$770.000
|
$4,000.000
|
$2,500.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
8.000
|
$5,200.000
|
$3,000.000
|
$3,000.000
|
$4,000.000
|
$10,000.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
300.000
|
$142.000
|
$90.000
|
$70.000
|
$100.000
|
$400.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
2,000.000
|
$38.000
|
$12.000
|
$10.000
|
$20.000
|
$10.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
2,100.000
|
$20.590
|
$18.000
|
$8.000
|
$20.000
|
$10.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
30.000
|
$24.700
|
$50.000
|
$15.000
|
$25.000
|
$32.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
30.000
|
$35.720
|
$175.000
|
$745.000
|
$350.000
|
$200.000
|
|
|
REPLACE SHORT RADIUS SYS (TL-2)
|
EA
|
75.000
|
$23.400
|
$100.000
|
$100.000
|
$1.000
|
$14,590.000
|
|
|
REPLACE STEEL POST W/O CONC FND
|
EA
|
130.000
|
$63.870
|
$100.000
|
$59.000
|
$80.000
|
$69.000
|
|
|
REPLACE TIMBER POST W/ CONC FND
|
EA
|
175.000
|
$126.570
|
$125.000
|
$34.000
|
$60.000
|
$30.000
|
|
|
REALIGN POSTS
|
EA
|
50.000
|
$26.330
|
$50.000
|
$25.000
|
$20.000
|
$100.000
|
|
|
REM OBSOLETE GET & REPL W/ SGT
|
EA
|
10.000
|
$42.000
|
$3,500.000
|
$2,225.000
|
$3,000.000
|
$2,880.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
80.000
|
$1,192.580
|
$1,000.000
|
$915.000
|
$1,500.000
|
$1,200.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
4,000.000
|
$29.220
|
$35.000
|
$24.700
|
$55.000
|
$26.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
370.000
|
$119.210
|
$100.000
|
$26.800
|
$140.000
|
$30.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
40.000
|
$182.000
|
$100.000
|
$326.000
|
$25.000
|
$410.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$178.790
|
$300.000
|
$12.900
|
$1,000.000
|
$50.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$23.850
|
$50.000
|
$21.000
|
$40.000
|
$26.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
80.000
|
$56.440
|
$100.000
|
$74.000
|
$160.000
|
$75.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
80.000
|
$73.800
|
$100.000
|
$94.000
|
$180.000
|
$94.000
|
|
|
REPLACE SGT STRUT
|
EA
|
10.000
|
$59.800
|
$200.000
|
$68.000
|
$160.000
|
$67.000
|
|
|
RAISE RAIL
|
LF
|
200.000
|
$7.500
|
$30.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
10.000
|
$210.330
|
$500.000
|
$57.000
|
$200.000
|
$50.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
200.000
|
$32.270
|
$30.000
|
$16.900
|
$25.000
|
$12.000
|
|
|
REPAIR (SMTC) NARROW
|
LF
|
10.000
|
$1,783.330
|
$600.000
|
$300.000
|
$3,000.000
|
$500.000
|
|
|
REMOVE (SMTC) WIDE
|
EA
|
5.000
|
$19,025.250
|
$1,000.000
|
$72.000
|
$500.000
|
$3,000.000
|
|
|
REPAIR (SMTC) WIDE
|
LF
|
20.000
|
$1,025.000
|
$650.000
|
$300.000
|
$3,000.000
|
$500.000
|
|
|
REMOVE (QUAD - ELITE) NARROW
|
EA
|
20.000
|
$1,025.000
|
$500.000
|
$72.000
|
$500.000
|
$3,000.000
|
|
|
REPAIR (STL PIPE PED RAIL)(PR1)
|
LF
|
100.000
|
$117.000
|
$200.000
|
$109.000
|
$180.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
240.000
|
$20.000
|
$150.000
|
$110.000
|
$50.000
|
$125.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
240.000
|
$39.310
|
$150.000
|
$10.000
|
$50.000
|
$125.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
120.000
|
$75.000
|
$100.000
|
$125.000
|
$1.000
|
$125.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$75,000.000
|
$40,000.000
|
$48,000.000
|
$75,000.000
|
$35,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
240.000
|
$750.000
|
$150.000
|
$225.000
|
$100.000
|
$350.000
|
|
|
REPAIR LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
10.000
|
$1,500.000
|
$3,000.000
|
$1,340.000
|
$2,500.000
|
$1,000.000
|
|
Totals: |
$6,402,371.230
|
$4,149,300.000
|
$4,354,105.000
|
$5,445,102.500
|
$5,987,000.000
|