HARRIS SL0008 (6436-64-001)

Items: 69

County: HARRIS
Length: N/A
Highway: SL0008
District: HOUSTON
Control Number: 6436-64-001
DBE Goal: N/A
Project: RMC - 643664001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,402,586.49
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,402,586.49
$1,849,109.00
Over/Under Est: -23.04% -$553,477.49
$2,113,450.00
Over/Under Est: -12.03% -$289,136.49
Amt Left: 14.3% $264,341.00

Bid Items & Bid Tabulations

69 Total 0 of 69
HARRIS  |  SL0008  |  HOUSTON  |  6436-64-001  |  06/28/2023  |  $2,402,586.49  |  RMC - 643664001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (CTB)
LF 120.000 $25.550 $13.250 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 500.000 $25.000 $25.000 $10.000
CONC STR REPAIR (STANDARD)
SF 500.000 $135.000 $80.000 $160.000
RIPRAP (MOW STRIP)(5 IN)
CY 50.000 $632.780 $900.000 $400.000
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $1.000 $500.000
MOBILIZATION (EMERGENCY)
EA 30.000 $1,000.000 $750.000 $1,000.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 600.000 $20.000 $2.000 $3.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 60.000 $20.000 $10.000 $20.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 400.000 $20.000 $12.000 $20.000
PORT CTB (ALIGNING)
LF 21,000.000 $6.900 $2.000 $4.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 25.000 $1,600.000 $1,950.000 $3,000.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $17.800 $15.000 $12.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,500.000 $1,150.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $4.810 $20.000 $5.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $1,954.120 $5,000.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $3,500.000 $3,000.000 $500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 3.000 $19,025.000 $17,000.000 $5,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $21,957.000 $3,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 3.000 $7,500.000 $3,000.000 $50,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $40.000 $12.000 $22.000
CHAIN LINK FENCE (REPAIR) (6')
LF 200.000 $20.000 $12.000 $17.000
CHAIN LINK FENCE GATE (INSTALL)(6'X10')
EA 6.000 $500.000 $1,000.000 $600.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 1,000.000 $7.930 $10.000 $10.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 40.000 $79.380 $75.000 $115.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5,800.000 $33.750 $1.000 $18.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $20.000 $13.000 $13.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 10.000 $45.000 $45.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $45.000 $45.000 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,500.000 $28.000 $25.000 $15.000
RAISE RAIL ELEMENT
LF 1,000.000 $12.180 $10.000 $6.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $47.000 $30.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $65.000 $80.000 $50.000
REALIGN POSTS
EA 300.000 $10.000 $8.500 $7.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 6,500.000 $33.410 $35.000 $18.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,000.000 $74.750 $52.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $4,800.000 $3,500.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,125.000 $1,700.000 $800.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $179.000 $90.000 $25.000
REPLACE SGT CABLE ASSEMBLY
EA 150.000 $150.000 $125.000 $125.000
REPLACE SGT CABLE ANCHOR
EA 150.000 $150.000 $100.000 $80.000
REPLACE SGT STRUT
EA 60.000 $100.000 $100.000 $180.000
REPLACE SGT OBJECT MARKER
EA 100.000 $79.330 $100.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $151.950 $100.000 $100.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 500.000 $23.600 $17.500 $22.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 400.000 $231.000 $1.000 $45.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $24,657.000 $3,500.000 $15,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $21,611.270 $3,500.000 $40,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $23,000.000 $3,500.000 $25,000.000
REPAIR (NARROW QUAD)
EA 5.000 $1,675.000 $2,000.000 $2,200.000
REMOVE AND REPLACE (WIDE QUAD)
EA 1.000 $22,500.000 $3,500.000 $25,000.000
REPAIR (WIDE QUAD)
EA 1.000 $2,500.000 $2,000.000 $2,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 30.000 $1,500.000 $1,500.000 $1,100.000
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $3,792.000 $1,500.000 $3,200.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $1,000.000 $1,000.000 $800.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $3,329.000 $3,100.000 $3,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 4.000 $19,307.850 $26,000.000 $32,000.000
REPAIR (SMTC) (N)
EA 10.000 $3,250.000 $2,500.000 $2,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 4.000 $20,000.000 $37,000.000 $45,000.000
REPAIR (SMTC) (W)
EA 10.000 $3,250.000 $2,500.000 $3,000.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 1.000 $5,000.000 $5,000.000 $2,000.000
REPAIR TAU II (N)
LF 50.000 $140.000 $1.000 $100.000
REPAIR TAU II (W)
LF 100.000 $140.000 $1.000 $50.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 1.000 $2,200.000 $5,000.000 $1,500.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 60.000 $106.250 $205.000 $100.000
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
LF 30.000 $65.000 $205.000 $350.000
REPAIR (EXISTING METAL PED. RAIL)
LF 30.000 $145.000 $400.000 $150.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 100.000 $315.010 $500.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $100.000 $1.000 $1,000.000
TMA (STATIONARY)
DAY 200.000 $200.000 $500.000 $300.000
Totals: $2,402,586.490 $1,849,109.000 $2,113,450.000