Show Job Controls
Bid Cobra

HARRIS SH0249 (6430-73-001)

Items: 70

County: HARRIS
Length: N/A
Highway: SH0249
District: HOUSTON
Control Number: 6430-73-001
DBE Goal: N/A
Project: RMC - 643073001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $1,306,003.85
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
PHILLIP GARLIN
ROGER LOPEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,306,003.85
$1,070,515.00
Over/Under Est: -18.03% -$235,488.85
Over/Under Est: -5.43% -$70,888.85
Amt Left: 15.38% $164,600.00
$1,321,080.00
Over/Under Est: 1.15% $15,076.15
Amt Left: 23.41% $250,565.00
Delta: -6.96% -$85,965.00

Bid Items & Bid Tabulations

70 Total 0 of 70
HARRIS  |  SH0249  |  HOUSTON  |  6430-73-001  |  05/05/2023  |  $1,306,003.85  |  RMC - 643073001  |  METAL BEAM GUARDRAIL REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 100.000 $20.000 $1.000 $10.000 $6.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $150.000 $75.000 $100.000 $100.000
CONC STR REPAIR (STANDARD)
SF 100.000 $110.000 $65.000 $100.000 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $500.000 $200.000 $400.000 $400.000
MOBILIZATION (CALLOUT)
EA 35.000 $500.000 $1.000 $1.000 $100.000
MOBILIZATION (EMERGENCY)
EA 12.000 $5,000.000 $500.000 $750.000 $500.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $10.000 $10.000 $25.000 $10.000
PORT CTB (ALIGNING)
LF 3,000.000 $9.000 $5.000 $3.000 $4.000
CONC CURB (TY II)
LF 40.000 $25.000 $5.000 $25.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $25.000 $20.000 $18.000 $17.000
MTL W-BEAM GD FEN (STEEL POST)
LF 600.000 $30.000 $20.000 $22.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $1,700.000 $1,500.000 $1,500.000
SHORT RADIUS
LF 80.000 $80.000 $15.000 $35.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,240.160 $1,600.000 $1,500.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $10.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $500.000 $1.000 $200.000 $1.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,000.000 $120.000 $3,000.000 $500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 100.000 $22.000 $26.000 $10.000 $30.000
CHAIN LINK FENCE (REPAIR) (6')
LF 300.000 $14.000 $18.000 $25.000 $15.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $2.500 $10.000 $2.000 $5.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,000.000 $800.000 $2,000.000 $800.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $400.000 $650.000 $500.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 3,000.000 $4.850 $1.000 $2.000 $6.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 80.000 $20.000 $2.000 $20.000 $32.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3,000.000 $6.370 $1.000 $6.000 $6.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 30.000 $10.000 $2.000 $20.000 $15.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $0.750 $0.500 $1.250 $0.250
GRAFFITI REMOVAL (BLAST CLEANING)
SF 2,000.000 $2.000 $1.000 $1.000 $0.250
GRAFFITI REMOVAL (PAINTING)
SF 10,000.000 $1.520 $0.250 $2.500 $1.000
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 100.000 $4.000 $3.000 $3.000 $0.500
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $20.000 $28.000 $15.000 $17.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 70.000 $15.000 $15.000 $20.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 75.000 $31.000 $15.000 $20.000 $25.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $21.000 $40.000 $30.000 $60.000
RAISE RAIL ELEMENT
LF 300.000 $12.000 $2.000 $10.000 $4.000
REALIGN EXISTING RAIL
LF 300.000 $7.150 $2.000 $10.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $38.740 $90.000 $40.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 200.000 $40.550 $90.000 $60.000 $100.000
REALIGN POSTS
EA 100.000 $9.590 $5.000 $8.000 $5.000
REMOVE & REPLACE BLOCKOUT
EA 200.000 $40.000 $30.000 $5.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,000.000 $20.000 $35.000 $25.000 $22.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 400.000 $55.850 $125.000 $45.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $20.000 $100.000 $50.000 $300.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 15.000 $3,300.000 $3,200.000 $3,100.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 55.000 $822.350 $1,300.000 $1,500.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $100.000 $85.000 $100.000 $80.000
REPLACE SGT CABLE ASSEMBLY
EA 55.000 $76.820 $80.000 $90.000 $125.000
REPLACE SGT CABLE ANCHOR
EA 55.000 $75.000 $80.000 $75.000 $125.000
REPLACE SGT STRUT
EA 20.000 $68.600 $80.000 $65.000 $250.000
REPLACE SGT OBJECT MARKER
EA 75.000 $27.000 $30.000 $22.000 $35.000
REPAIR STEEL POST WITH BASE PLATE
EA 30.000 $78.130 $300.000 $350.000 $500.000
REPAIR REACT (N) (MISC HARDWARE)
EA 2.000 $1,040.000 $1,200.000 $1,500.000 $1,100.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 2.000 $700.000 $1,200.000 $1,500.000 $500.000
REMOVE AND REPLACE (SMTC) (N)
EA 8.000 $19,975.000 $5,000.000 $19,750.000 $29,000.000
REPAIR (SMTC) (N)
EA 10.000 $3,000.000 $1,200.000 $1,900.000 $1,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 10.000 $28,000.000 $20,000.000 $35,000.000 $36,000.000
REPAIR (SMTC) (W)
EA 15.000 $3,300.000 $1,400.000 $4,000.000 $1,400.000
REMOVE AND REPLACE TAU II (W)
EA 2.000 $13,000.000 $3,000.000 $1.000 $18,000.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 2.000 $1,500.000 $1,575.000 $1,650.000 $1,400.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 1.000 $2,000.000 $2,100.000 $3,000.000 $2,000.000
REPAIR (TAU)(II)(W)(BAY)
EA 2.000 $700.000 $1,620.000 $1,000.000 $1,500.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 3.000 $10,500.000 $3,000.000 $10,000.000 $6,500.000
REPAIR (TAU)(MASH)(N)
EA 2.000 $2,400.000 $1,825.000 $2,000.000 $1,700.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 2.000 $1,000.000 $1,620.000 $1,500.000 $1,500.000
REPAIR (TAU)(MASH)(N)
LF 50.000 $360.000 $240.000 $50.000 $240.000
REPAIR (EXISTING METAL PED. RAIL)
LF 100.000 $80.000 $100.000 $185.000 $50.000
CONCRETE RAIL REPAIR (MISC)
LF 100.000 $200.000 $60.000 $180.000 $50.000
PEDESTRIAN BARRIER (INSTALL)
LF 1,000.000 $36.570 $150.000 $24.000 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $10.000 $1.000 $95.000
TMA (STATIONARY)
DAY 125.000 $237.360 $1.000 $1.000 $200.000
Totals: $1,306,003.850 $1,070,515.000 $1,235,115.000 $1,321,080.000