REMOVING CONC (RIPRAP)
|
CY
|
50.000
|
$114.170
|
$50.000
|
$90.000
|
$200.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$2.000
|
$7.500
|
$2.000
|
$7.500
|
|
|
REMOVING CONC (CTB)
|
LF
|
60.000
|
$15.000
|
$10.000
|
$15.000
|
$25.000
|
|
|
BLADING
|
LF
|
1,500.000
|
$1.000
|
$10.000
|
$4.000
|
$25.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
2,500.000
|
$54.000
|
$10.000
|
$65.000
|
$45.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
2,500.000
|
$52.930
|
$10.000
|
$85.000
|
$60.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
1,500.000
|
$450.000
|
$375.000
|
$325.000
|
$375.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
300.000
|
$500.000
|
$395.000
|
$350.000
|
$425.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
200.000
|
$525.000
|
$415.000
|
$375.000
|
$425.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
250.000
|
$350.000
|
$200.000
|
$375.000
|
$500.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
25.000
|
$81.850
|
$75.000
|
$44.000
|
$100.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
25.000
|
$116.400
|
$90.000
|
$44.000
|
$200.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
200.000
|
$200.000
|
$100.000
|
$180.000
|
$275.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
50.000
|
$263.750
|
$180.000
|
$250.000
|
$250.000
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
200.000
|
$68.000
|
$205.000
|
$180.000
|
$200.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
200.000
|
$64.000
|
$140.000
|
$180.000
|
$225.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
50.000
|
$530.000
|
$425.000
|
$535.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
100.000
|
$562.800
|
$450.000
|
$480.000
|
$525.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
500.000
|
$21.000
|
$30.000
|
$15.000
|
$25.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$250.000
|
$500.000
|
$250.000
|
$1,000.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$550.000
|
$2,000.000
|
$500.000
|
$2,500.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
120.000
|
$15.000
|
$20.000
|
$25.000
|
$125.000
|
|
|
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
|
LF
|
30.000
|
$15.000
|
$20.000
|
$25.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
30.000
|
$11.710
|
$20.000
|
$25.000
|
$50.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
200.000
|
$143.000
|
$35.000
|
$50.000
|
$150.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
100.000
|
$8.300
|
$35.000
|
$12.000
|
$30.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
150.000
|
$129.000
|
$150.000
|
$83.000
|
$150.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,400.000
|
$1,900.000
|
$2,920.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,574.000
|
$1,500.000
|
$1,835.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$2,000.000
|
$2,000.000
|
$10,148.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$100.000
|
$2,000.000
|
$1,359.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$30,000.000
|
$2,000.000
|
$1,359.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
5.000
|
$11,285.710
|
$26,500.000
|
$27,500.000
|
$25,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
6.000
|
$16,000.000
|
$37,000.000
|
$28,000.000
|
$35,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
20.000
|
$25.000
|
$40.000
|
$22.000
|
$50.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
20.000
|
$16.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$772.000
|
$1,500.000
|
$841.000
|
$2,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
400.000
|
$20.000
|
$25.000
|
$25.000
|
$30.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
700.000
|
$20.000
|
$25.000
|
$25.000
|
$40.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
10.000
|
$2,724.000
|
$500.000
|
$3,000.000
|
$3,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
10.000
|
$2,724.000
|
$500.000
|
$3,000.000
|
$3,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
2,000.000
|
$3.950
|
$6.000
|
$9.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
2,000.000
|
$3.950
|
$6.000
|
$9.000
|
$8.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
150.000
|
$26.010
|
$25.000
|
$18.000
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
300.000
|
$1.650
|
$3.090
|
$3.090
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.970
|
$0.876
|
$0.880
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$3.400
|
$3.348
|
$3.350
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
5,000.000
|
$6.790
|
$6.500
|
$6.700
|
$9.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$154.350
|
$128.750
|
$128.790
|
$250.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
20.000
|
$216.090
|
$149.350
|
$149.400
|
$300.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$177.220
|
$206.000
|
$206.070
|
$300.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
20.000
|
$205.800
|
$180.250
|
$180.310
|
$300.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
25.000
|
$154.350
|
$139.050
|
$139.100
|
$300.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$750.000
|
$669.500
|
$669.720
|
$1,000.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
8.000
|
$750.000
|
$669.500
|
$669.720
|
$1,000.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
1.000
|
$2.260
|
$10.300
|
$10.300
|
$2.500
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
10.000
|
$93.240
|
$360.500
|
$360.620
|
$200.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$154.350
|
$103.000
|
$103.030
|
$200.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.000
|
$0.876
|
$0.880
|
$1.250
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
100.000
|
$2.830
|
$4.635
|
$4.640
|
$3.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
50.000
|
$5.400
|
$9.270
|
$9.270
|
$7.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$450.000
|
$515.000
|
$515.170
|
$500.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
12,000.000
|
$2.000
|
$0.670
|
$0.670
|
$1.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
80,300.000
|
$0.130
|
$0.250
|
$0.160
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,000.000
|
$0.140
|
$0.206
|
$0.210
|
$0.250
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,100.000
|
$0.660
|
$0.773
|
$0.770
|
$0.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
5,050.000
|
$1.320
|
$1.545
|
$1.550
|
$1.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
20.000
|
$39.100
|
$41.200
|
$41.210
|
$30.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
25.000
|
$39.100
|
$41.200
|
$41.210
|
$30.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
15.000
|
$12.760
|
$103.000
|
$103.030
|
$15.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
20.000
|
$54.950
|
$77.250
|
$77.280
|
$35.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$43.870
|
$82.400
|
$82.430
|
$50.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
20.000
|
$51.450
|
$82.400
|
$82.430
|
$35.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
8.000
|
$97.760
|
$154.500
|
$154.550
|
$150.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
8.000
|
$97.760
|
$154.500
|
$154.550
|
$150.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$66.890
|
$180.250
|
$180.310
|
$75.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
1.000
|
$1.010
|
$30.900
|
$30.910
|
$25.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,000.000
|
$1.000
|
$1.000
|
$0.610
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.000
|
$1.000
|
$0.610
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.620
|
$1.000
|
$0.610
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.000
|
$1.000
|
$0.610
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$230.580
|
$283.250
|
$283.340
|
$300.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$15.000
|
$5.150
|
$5.150
|
$5.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
100.000
|
$5.150
|
$5.150
|
$5.150
|
$7.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
100.000
|
$5.150
|
$5.150
|
$5.150
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
200.000
|
$5.150
|
$5.150
|
$5.150
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$5.600
|
$10.000
|
$5.150
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
80,300.000
|
$0.360
|
$0.515
|
$0.520
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
6,000.000
|
$0.640
|
$1.030
|
$1.030
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,100.000
|
$1.290
|
$2.060
|
$2.060
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
5,050.000
|
$2.570
|
$4.000
|
$4.120
|
$2.250
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
20.000
|
$56.600
|
$72.100
|
$72.120
|
$60.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
20.000
|
$87.470
|
$72.100
|
$72.120
|
$90.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
1.000
|
$47.820
|
$72.100
|
$72.120
|
$90.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
25.000
|
$226.380
|
$72.100
|
$72.120
|
$130.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
8.000
|
$226.380
|
$654.050
|
$654.270
|
$350.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
8.000
|
$257.250
|
$654.050
|
$654.270
|
$350.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$128.630
|
$72.100
|
$72.120
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
15.000
|
$18.480
|
$283.250
|
$283.340
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
20.000
|
$87.470
|
$72.100
|
$72.120
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
80,300.000
|
$0.020
|
$0.100
|
$0.010
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,000.000
|
$0.020
|
$0.021
|
$0.020
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,100.000
|
$0.260
|
$0.052
|
$0.050
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,050.000
|
$0.510
|
$0.082
|
$0.080
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$10.290
|
$5.150
|
$5.150
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
20.000
|
$10.290
|
$5.150
|
$5.150
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$38.620
|
$5.150
|
$5.150
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$10.290
|
$5.150
|
$5.150
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$10.290
|
$5.150
|
$5.150
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
8.000
|
$10.290
|
$10.300
|
$10.300
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
8.000
|
$10.290
|
$10.300
|
$10.300
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$43.720
|
$5.150
|
$5.150
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
15.000
|
$4.320
|
$5.150
|
$5.150
|
$10.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
500.000
|
$2.500
|
$3.000
|
$2.380
|
$5.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
1,008.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
6.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
4.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
4.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
16.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
80.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (7)
|
AC
|
44.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
FULL - WIDTH MOWING - TRACT (8)
|
AC
|
16.000
|
$94.000
|
$65.000
|
$77.000
|
$100.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
50.000
|
$122.200
|
$350.000
|
$135.000
|
$350.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
4.000
|
$30.000
|
$100.000
|
$90.000
|
$500.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$794.000
|
$5,600.000
|
$6,100.000
|
$5,000.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
36.000
|
$1,730.000
|
$1,500.000
|
$1,082.000
|
$2,500.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
24.000
|
$679.780
|
$1,000.000
|
$841.000
|
$1,500.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
24.000
|
$554.630
|
$750.000
|
$402.000
|
$1,000.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
24.000
|
$229.250
|
$750.000
|
$488.000
|
$1,000.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
100,000.000
|
$0.500
|
$0.500
|
$1.250
|
$1.250
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
36.000
|
$1,264.000
|
$3,500.000
|
$3,426.000
|
$5,000.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
36.000
|
$1,264.000
|
$3,500.000
|
$3,426.000
|
$5,000.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
24.000
|
$1,264.000
|
$4,750.000
|
$4,816.000
|
$7,500.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
36.000
|
$1,264.000
|
$2,650.000
|
$2,662.000
|
$5,000.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
36.000
|
$320.000
|
$1,350.000
|
$1,272.000
|
$2,500.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
36.000
|
$320.000
|
$1,650.000
|
$1,547.000
|
$2,500.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
10,000.000
|
$0.850
|
$2.000
|
$3.000
|
$7.500
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
5.000
|
$1,020.000
|
$2,500.000
|
$1,238.860
|
$3,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
10.000
|
$166.000
|
$80.000
|
$197.070
|
$150.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
5.000
|
$270.000
|
$100.000
|
$327.210
|
$250.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
2.000
|
$270.000
|
$140.000
|
$327.210
|
$500.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
2.000
|
$305.000
|
$175.000
|
$318.980
|
$500.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
500.000
|
$42.000
|
$50.000
|
$81.200
|
$100.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
50.000
|
$115.000
|
$50.000
|
$347.970
|
$500.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
50.000
|
$6.000
|
$3.000
|
$4.640
|
$6.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
4,000.000
|
$4.000
|
$4.000
|
$4.640
|
$8.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
10,000.000
|
$4.500
|
$5.000
|
$6.960
|
$13.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
10,000.000
|
$5.300
|
$8.000
|
$8.120
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
7,000.000
|
$6.400
|
$10.000
|
$9.280
|
$18.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
30.000
|
$7.400
|
$11.500
|
$11.600
|
$12.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
50.000
|
$10.600
|
$15.500
|
$14.500
|
$12.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
1,200.000
|
$12.200
|
$16.500
|
$16.240
|
$17.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
3,000.000
|
$15.400
|
$18.200
|
$19.720
|
$50.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
2,500.000
|
$22.000
|
$15.000
|
$15.730
|
$30.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
19.000
|
$26.900
|
$50.000
|
$23.230
|
$60.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
25.000
|
$41.600
|
$50.000
|
$38.900
|
$45.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
500.000
|
$13.000
|
$6.000
|
$5.180
|
$10.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
100.000
|
$32.700
|
$50.000
|
$37.300
|
$55.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
150.000
|
$89.300
|
$80.000
|
$46.310
|
$100.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$300.000
|
$200.000
|
$180.110
|
$300.000
|
|
|
REALIGN POSTS
|
EA
|
100.000
|
$5.400
|
$10.000
|
$6.470
|
$75.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,000.000
|
$28.900
|
$30.000
|
$30.000
|
$40.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
300.000
|
$35.800
|
$80.000
|
$39.360
|
$65.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
10.000
|
$3,948.000
|
$3,250.000
|
$3,243.560
|
$4,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$1,125.000
|
$1,250.000
|
$1,250.000
|
$1,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
25.000
|
$107.000
|
$500.000
|
$64.710
|
$200.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
50.000
|
$119.000
|
$100.000
|
$118.690
|
$125.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
50.000
|
$91.000
|
$100.000
|
$106.000
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$77.000
|
$100.000
|
$99.000
|
$100.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$22.200
|
$30.000
|
$30.000
|
$30.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$300.000
|
$250.000
|
$180.000
|
$350.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
25.000
|
$941.000
|
$800.000
|
$1,053.000
|
$1,000.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
2.000
|
$3,329.000
|
$3,000.000
|
$3,493.000
|
$4,000.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
10.000
|
$831.000
|
$800.000
|
$950.000
|
$1,000.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
5.000
|
$3,329.000
|
$3,000.000
|
$3,300.000
|
$2,500.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
6.000
|
$2,487.800
|
$2,250.000
|
$1,875.000
|
$5,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
6.000
|
$2,500.000
|
$2,250.000
|
$2,250.000
|
$4,000.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
5.000
|
$800.000
|
$800.000
|
$1,875.000
|
$2,500.000
|
|
|
REPAIR TAU II (N)
|
LF
|
35.000
|
$82.000
|
$350.000
|
$200.000
|
$250.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
15.000
|
$100.000
|
$200.000
|
$20.000
|
$100.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
200.000
|
$221.210
|
$100.000
|
$475.000
|
$750.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
50.000
|
$273.670
|
$1,200.000
|
$500.000
|
$600.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
250.000
|
$97.000
|
$50.000
|
$105.000
|
$110.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$94.000
|
$150.000
|
$125.000
|
$100.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
20,000.000
|
$0.650
|
$0.670
|
$0.670
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
10,000.000
|
$0.650
|
$0.670
|
$0.670
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
2,000.000
|
$3.500
|
$6.650
|
$6.650
|
$3.500
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
20,000.000
|
$0.650
|
$0.670
|
$0.670
|
$0.650
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
4,000.000
|
$0.460
|
$0.800
|
$0.670
|
$0.850
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
10,000.000
|
$0.400
|
$0.700
|
$0.670
|
$0.800
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
25.000
|
$951.000
|
$1,500.000
|
$4,000.000
|
$1,500.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$300.000
|
$750.000
|
$700.000
|
$300.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
2.000
|
$263.000
|
$500.000
|
$375.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$50.000
|
$400.000
|
$2,000.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$10.000
|
$65.000
|
$200.000
|
$125.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
25.000
|
$11.100
|
$100.000
|
$5.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
100.000
|
$59.000
|
$110.000
|
$35.000
|
$100.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
400.000
|
$37.000
|
$100.000
|
$35.000
|
$75.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
25.000
|
$64.000
|
$150.000
|
$35.000
|
$75.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$50,000.000
|
$15,000.000
|
$20,000.000
|
$30,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$34.200
|
$110.000
|
$35.000
|
$100.000
|
|
Totals: |
$3,721,109.530
|
$4,333,798.050
|
$5,339,555.890
|