HARRIS IH0010 (6393-43-001)

Items: 56

County: HARRIS
Length: N/A
Highway: IH0010
District: HOUSTON
Control Number: 6393-43-001
DBE Goal: N/A
Project: RMC - 639343001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,643,299.00
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
HAMOON BAHRAMI
BRETT MCLEOD
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,643,299.00
$1,763,985.00
Over/Under Est: 7.34% $120,686.00
$1,900,047.50
Over/Under Est: 15.62% $256,748.50
Amt Left: 7.71% $136,062.50
$2,241,953.75
Over/Under Est: 36.43% $598,654.75
Amt Left: 27.1% $477,968.75
Delta: -17.99% -$341,906.25

Bid Items & Bid Tabulations

56 Total 0 of 56
HARRIS  |  IH0010  |  HOUSTON  |  6393-43-001  |  02/04/2022  |  $1,643,299.00  |  RMC - 639343001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
RHINO EQUITY, LLC
ISI CONTRACTING, INC.
CONC STR REPAIR (STANDARD)
SF 400.000 $60.000 $135.000 $60.000 $70.000
RIPRAP (MOW STRIP)(4 IN)
CY 150.000 $400.000 $420.000 $500.000 $300.000
MOBILIZATION (CALLOUT)
EA 60.000 $200.000 $500.000 $1.000 $250.000
MOBILIZATION (EMERGENCY)
EA 20.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 500.000 $8.000 $3.000 $10.000 $5.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 100.000 $20.000 $15.000 $50.000 $25.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 50.000 $25.000 $15.000 $50.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,300.000 $1,600.000 $2,000.000 $2,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,200.000 $1,500.000 $1,000.000 $1,000.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $1,000.000 $250.000 $500.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $3,200.000 $3,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $250.000 $500.000 $320.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $15.000 $16.850 $100.000 $24.000
CHAIN LINK FENCE GATE (INSTALL)(6'X16')
EA 1.000 $1,500.000 $1,000.000 $500.000 $1,256.000
CHAIN LINK FENCE GATE (INSTALL)(6'X10')
EA 1.000 $1,300.000 $500.000 $500.000 $1,000.000
CHAIN LINK FENCE GATE (INSTALL)(6'X18')
EA 1.000 $2,000.000 $500.000 $500.000 $1,340.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 7,000.000 $7.000 $4.500 $3.500 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 7,000.000 $7.000 $4.500 $3.500 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 5,000.000 $5.000 $5.000 $3.500 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 1,000.000 $15.000 $20.000 $10.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 300.000 $20.000 $20.000 $6.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $15.000 $18.000 $59.000 $19.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $20.000 $20.000 $30.000 $24.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 31.250 $20.000 $20.000 $30.000 $39.000
RAISE RAIL ELEMENT
LF 1,000.000 $5.000 $9.000 $10.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 900.000 $40.000 $47.000 $40.000 $35.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 900.000 $42.000 $53.000 $40.000 $44.000
REALIGN POSTS
EA 50.000 $8.000 $10.000 $7.000 $6.000
REMOVE & REPLACE BLOCKOUT
EA 400.000 $8.000 $18.000 $100.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,000.000 $20.000 $35.000 $59.000 $24.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $50.000 $58.000 $50.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 1.000 $24.000 $1.000 $500.000 $8.000
REPLACE TERMINAL ANCHOR POSTS
EA 30.000 $20.000 $1.000 $100.000 $8.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 3.000 $2,000.000 $4,400.000 $5,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $900.000 $1,050.000 $600.000 $1,050.000
REM & RESET SGT IMPACT HEAD
EA 60.000 $60.000 $250.000 $1,200.000 $128.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $55.000 $80.000 $1.000 $109.000
REPLACE SGT CABLE ANCHOR
EA 100.000 $45.000 $80.000 $1.000 $102.000
REPLACE SGT STRUT
EA 100.000 $45.000 $75.000 $1.000 $165.000
REPLACE SGT OBJECT MARKER
EA 100.000 $24.000 $25.000 $1.000 $29.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $22,000.000 $10,000.000 $22,000.000 $1.000
REPAIR (WIDE QUAD)
EA 1.000 $2,000.000 $2,500.000 $1,000.000 $5,215.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $650.000 $800.000 $1,000.000 $900.000
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $2,000.000 $3,200.000 $2,000.000 $3,337.000
REMOVE AND REPLACE (SMTC) (N)
EA 20.000 $14,000.000 $26,500.000 $16,000.000 $26,000.000
REPAIR (SMTC) (N)
EA 20.000 $900.000 $3,000.000 $1,000.000 $1,193.000
REMOVE AND REPLACE (SMTC) (W)
EA 2.000 $26,000.000 $20,000.000 $25,000.000 $34,000.000
REPAIR (SMTC) (W)
EA 2.000 $5,000.000 $3,000.000 $1,000.000 $1,470.000
REMOVE AND REPLACE TAU II (W)
EA 8.000 $20,000.000 $10,000.000 $25,000.000 $23,500.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 1.000 $1,200.000 $1,500.000 $1,000.000 $1,800.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 20.000 $12,000.000 $5,000.000 $1,000.000 $25,000.000
REPAIR (TAU)(MASH)(N)
EA 12.000 $1,500.000 $2,300.000 $1,000.000 $1,915.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 35.000 $500.000 $900.000 $2,000.000 $1,654.000
REPAIR (EXISTING METAL PED. RAIL)
LF 300.000 $50.000 $80.000 $100.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 4.000 $100.000 $1.000 $1,000.000 $100.000
TMA (STATIONARY)
DAY 500.000 $200.000 $1.000 $1.000 $200.000
Totals: $1,643,299.000 $1,763,985.000 $1,900,047.500 $2,241,953.750