Show Job Controls
Bid Cobra

HARRIS SH0099 (6391-55-001)

Items: 331

County: HARRIS
Length: N/A
Highway: SH0099
District: HOUSTON
Control Number: 6391-55-001
DBE Goal: N/A
Project: RMC - 639155001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $9,886,983.08
Date: 05/04/2022 (4 years ago)
Contract Number: N/A
Type: BUNDLED BID
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$9,886,983.08
$9,152,121.61
Over/Under Est: -7.43% -$734,861.47
$9,766,815.54
Over/Under Est: -1.22% -$120,167.54
Amt Left: 6.72% $614,693.93

Bid Items & Bid Tabulations

331 Total 0 of 331
HARRIS  |  SH0099  |  HOUSTON  |  6391-55-001  |  05/04/2022  |  $9,886,983.08  |  RMC - 639155001  |  BUNDLED BID  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 10.000 $43.000 $10.000 $19.000
REMOVING CONC (MEDIANS)
SY 10.000 $20.000 $10.000 $11.100
REMOVING CONC (CURB)
LF 10.000 $6.670 $10.000 $2.290
BACKFILL (TY A OR B)
CY 100.000 $30.000 $35.000 $178.000
BLADING
STA 800.000 $100.000 $120.000 $88.000
SPOT SODDING
SY 1,000.000 $2.630 $11.000 $14.800
BLOCK SODDING
SY 2,000.000 $4.740 $11.000 $15.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 2,000.000 $0.150 $1.000 $0.150
FERTILIZER
AC 10.000 $636.200 $650.000 $779.000
VEGETATIVE WATERING
MG 2,500.000 $11.470 $1.000 $15.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 200.000 $70.050 $145.000 $306.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 2,000.000 $36.850 $57.000 $52.000
FULL - DEPTH REPAIR CRCP (15")
SY 50.000 $348.000 $370.000 $396.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 25.000 $280.000 $350.000 $385.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 50.000 $324.000 $335.000 $355.000
FLOWABLE BACKFILL
CY 25.000 $215.000 $175.000 $813.000
CONCRETE PAINT FINISH
SF 15,000.000 $0.820 $3.000 $1.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $82.000 $200.000 $64.000
CONC STR REPAIR (STANDARD)
SF 300.000 $97.000 $125.000 $64.000
RIPRAP (CONC)(6 IN)
CY 75.000 $237.000 $325.000 $523.000
RIPRAP (CONC)(CL B)
CY 15.000 $400.000 $325.000 $523.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 100.000 $135.010 $150.000 $27.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 100.000 $111.000 $180.000 $81.100
RIPRAP (MOW STRIP)(6 IN)
CY 30.000 $400.000 $475.000 $500.000
CLEANING AND SEALING EXISTING JOINTS
LF 700.000 $15.000 $35.000 $22.400
MOBILIZATION (CALLOUT)
EA 104.000 $500.000 $500.000 $500.000
MOBILIZATION (EMERGENCY)
EA 24.000 $700.000 $650.000 $2,500.000
EMBANK (EROSN & SEDMT CONT, IN PLACE)
CY 500.000 $30.000 $40.000 $75.000
EXCAV (EROSN & SEDMT CONT, IN VEH)
CY 500.000 $32.000 $35.000 $60.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $42.000 $1.000 $5.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $8.000 $3.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 560.000 $24.000 $10.000 $5.000
LANDSCAPE PAVERS
SY 150.000 $126.000 $20.000 $143.000
REMOVE AND RELAY PAVERS
SY 400.000 $20.000 $25.000 $50.000
CONC CURB (TY II)
LF 500.000 $10.000 $20.000 $5.500
CONC SIDEWALKS (4")
SY 50.000 $53.000 $60.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $30.000 $30.000 $75.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,053.000 $1,500.000 $958.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $3.320 $3.000 $2.000
CABLE BARRIER SYSTEM (TL-3)
LF 500.000 $11.700 $30.000 $21.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,178.000 $5,000.000 $2,066.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 3.000 $2,557.720 $6,000.000 $1,376.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $1,500.000 $2,000.000 $1,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,683.260 $100.000 $1,300.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,500.000 $100.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $531.290 $30,000.000 $1.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $26,131.550 $2,500.000 $1.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 1.000 $17,000.000 $2,500.000 $1.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $36,692.440 $10,000.000 $1.000
CRASH CUSH ATTEN (INSTL)(L)(W)(70)
EA 1.000 $30,000.000 $10,000.000 $1.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $17.500 $15.000 $14.800
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 3.000 $1,147.000 $2,000.000 $550.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $1,133.330 $750.000 $725.000
ALUMINUM SIGNS (TY A)
SF 600.000 $35.000 $37.000 $50.000
ALUMINUM SIGNS (TY G)
SF 400.000 $35.000 $37.000 $65.000
ALUMINUM SIGNS (TY O)
SF 100.000 $40.000 $35.000 $68.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 500.000 $50.000 $37.000 $50.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 500.000 $50.000 $37.000 $65.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 200.000 $50.000 $25.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,000.000 $4.850 $8.000 $6.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 200.000 $105.790 $3.000 $38.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $4.940 $8.000 $6.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 1,000.000 $9.490 $3.000 $13.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 400.000 $8.000 $30.000 $15.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $8.000 $30.000 $15.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 40.000 $85.000 $30.000 $15.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,500.000 $1.500 $1.650 $1.900
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 1,000.000 $0.720 $1.650 $2.110
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,000.000 $0.900 $0.935 $1.060
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,500.000 $2.070 $3.300 $3.960
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 9,000.000 $2.620 $3.850 $3.430
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,000.000 $6.560 $7.700 $6.860
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 48.000 $118.830 $165.000 $132.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 32.000 $176.700 $220.000 $211.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 26.000 $142.090 $220.000 $190.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 8.000 $283.330 $220.000 $190.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 48.000 $139.810 $165.000 $137.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 7.000 $635.720 $550.000 $728.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 7.000 $722.690 $550.000 $728.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 1,000.000 $2.580 $0.935 $1.320
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,000.000 $2.560 $3.850 $3.430
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 200.000 $5.180 $7.700 $6.860
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 2,000.000 $0.550 $0.715 $0.790
REFL PAV MRK TY II (W) 12" (SLD)
LF 100.000 $1.260 $1.600 $2.640
REFL PAV MRK TY II (Y) 12" (SLD)
LF 200.000 $1.350 $1.600 $2.640
PAVEMENT SEALER 4"
LF 400.000 $0.170 $0.080 $0.110
PAVEMENT SEALER 6"
LF 1,535,500.000 $0.170 $0.010 $0.160
PAVEMENT SEALER 8"
LF 127,000.000 $0.290 $0.120 $0.210
PAVEMENT SEALER 12"
LF 38,800.000 $0.800 $0.480 $0.530
PAVEMENT SEALER 24"
LF 5,200.000 $0.980 $0.960 $1.060
PAVEMENT SEALER (ARROW)
EA 48.000 $35.650 $36.000 $31.000
PAVEMENT SEALER (WORD)
EA 48.000 $37.890 $36.000 $31.000
PAVEMENT SEALER (DBL ARROW)
EA 32.000 $92.500 $36.000 $31.000
PAVEMENT SEALER (UTURN ARROW)
EA 26.000 $30.000 $36.000 $31.000
PAVEMENT SEALER (LNDP ARROW)
EA 8.000 $30.000 $36.000 $31.000
PAVEMENT SEALER (ENTR GORE)
EA 7.000 $15.000 $150.000 $211.000
PAVEMENT SEALER (EXIT GORE)
EA 7.000 $15.000 $150.000 $211.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 200.000 $0.260 $0.360 $0.530
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 15,000.000 $0.370 $0.520 $0.690
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,000.000 $0.350 $0.520 $0.690
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 200.000 $0.260 $0.360 $0.530
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,000.000 $0.320 $0.520 $0.690
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 1,000.000 $6.790 $11.200 $15.800
PREFAB PAV MRK TY B (MULTI)(SHIELD)
EA 6.000 $1,750.360 $2,000.000 $2,954.000
REFL PAV MRKR TY I-A
EA 40.000 $3.950 $15.000 $4.750
REFL PAV MRKR TY I-C
EA 40.000 $3.290 $15.000 $4.750
REFL PAV MRKR TY II-A-A
EA 100.000 $2.370 $10.000 $4.750
REFL PAV MRKR TY II-C-R
EA 1,400.000 $3.710 $10.000 $4.750
ELIM EXT PAV MRK & MRKS (4")
LF 400.000 $0.420 $0.200 $0.370
ELIM EXT PAV MRK & MRKS (6")
LF 1,535,500.000 $0.520 $0.150 $0.300
ELIM EXT PAV MRK & MRKS (8")
LF 127,000.000 $0.690 $0.500 $0.740
ELIM EXT PAV MRK & MRKS (12")
LF 38,800.000 $1.830 $1.200 $1.530
ELIM EXT PAV MRK & MRKS (24")
LF 5,200.000 $3.280 $2.420 $3.060
ELIM EXT PAV MRK & MRKS (ARROW)
EA 48.000 $38.190 $48.000 $68.600
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 32.000 $47.430 $60.000 $94.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 48.000 $43.300 $48.000 $68.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 7.000 $285.000 $300.000 $275.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 7.000 $550.000 $300.000 $275.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 6.000 $246.500 $200.000 $315.000
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 26.000 $60.670 $72.000 $93.000
PAV SURF PREP FOR MRK (4")
LF 400.000 $0.100 $0.024 $21.000
PAV SURF PREP FOR MRK (6")
LF 1,535,500.000 $0.100 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 127,000.000 $0.210 $0.016 $0.020
PAV SURF PREP FOR MRK (12")
LF 38,800.000 $0.960 $0.200 $0.260
PAV SURF PREP FOR MRK (24")
LF 5,200.000 $2.430 $0.400 $0.530
PAV SURF PREP FOR MRK (ARROW)
EA 48.000 $23.660 $8.000 $21.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 32.000 $13.470 $8.000 $21.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 26.000 $15.020 $8.000 $21.000
PAV SURF PREP FOR MRK (WORD)
EA 48.000 $27.020 $8.000 $21.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 7.000 $144.170 $300.000 $100.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 7.000 $184.170 $300.000 $100.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 6.000 $25.000 $20.000 $100.000
PAV SURF PREP FOR MRK (RPM)
EA 1,580.000 $1.810 $2.000 $1.060
POTHOLE REPAIR (STANDARD)
SY 30.000 $89.300 $75.000 $100.000
POTHOLE REPAIR (SAW - CUT)
SY 200.000 $18.750 $100.000 $150.000
JT / CRCK SEAL (RUBBER - ASPHALT)
LMI 40.000 $522.460 $850.000 $835.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 50.000 $94.450 $150.000 $362.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 200.000 $55.000 $50.000 $116.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 3,000.000 $2.300 $2.800 $2.750
SPOT MOWING
AC 10.000 $40.000 $100.000 $250.000
FULL - WIDTH MOWING - TRACT (1)
AC 324.240 $40.000 $38.000 $40.000
FULL - WIDTH MOWING - TRACT (2)
AC 6,944.980 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (3)
AC 7,467.600 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (4)
AC 5,840.100 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (5)
AC 3,430.980 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (6)
AC 8,031.000 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (7)
AC 3,416.000 $40.000 $38.000 $39.000
FULL - WIDTH MOWING - TRACT (8)
AC 742.000 $40.000 $38.000 $40.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 253.640 $210.000 $250.000 $130.000
BROADCAST APPLICATION
AC 600.000 $70.000 $50.000 $50.000
WICK APPLICATION OF HERBICIDE
AC 75.000 $25.320 $50.000 $50.000
LITTER REMOVAL (SPOT)
AC 30.000 $50.000 $50.000 $28.000
LITTER REMOVAL - TRACT (1)
CYC 48.000 $277.920 $230.000 $200.000
LITTER REMOVAL - TRACT (2)
CYC 48.000 $5,952.860 $4,960.000 $1,875.000
LITTER REMOVAL - TRACT (3)
CYC 48.000 $6,400.800 $5,330.000 $1,875.000
LITTER REMOVAL - TRACT (4)
CYC 48.000 $4,028.280 $3,360.000 $1,875.000
LITTER REMOVAL - TRACT (5)
CYC 48.000 $977.520 $810.000 $500.000
LITTER REMOVAL - TRACT (6)
CYC 48.000 $2,940.840 $530.000 $1,875.000
LITTER REMOVAL - TRACT (7)
CYC 48.000 $2,928.000 $2,450.000 $1,875.000
LITTER REMOVAL - TRACT (8)
CYC 48.000 $636.000 $740.000 $1,875.000
LITTER REMOVAL - TRACT (9)
CYC 48.000 $828.000 $1,000.000 $1,875.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 72.000 $128.000 $174.778 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 72.000 $1,264.000 $1,730.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 72.000 $952.000 $1,300.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
CYC 72.000 $952.800 $1,300.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
CYC 72.000 $146.400 $200.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
CYC 72.000 $928.800 $1,270.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
CYC 72.000 $554.400 $760.000 $650.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
CYC 72.000 $145.600 $200.000 $650.000
DEBRIS-DIRECT CONNECTOR - AREA (1)
CYC 24.000 $600.000 $170.000 $459.000
DEBRIS-DIRECT CONNECTOR - AREA (2)
CYC 24.000 $600.000 $440.000 $459.000
DEBRIS-DIRECT CONNECTOR - AREA (4)
CYC 24.000 $110.000 $290.000 $459.000
DEBRIS-DIRECT CONNECTOR - AREA (5)
CYC 24.000 $600.000 $200.000 $459.000
DEBRIS-DIRECT CONNECTOR - AREA (6)
CYC 24.000 $600.000 $220.000 $459.000
CLEANING / SWEEPING (HANDWORK)
SY 50,000.000 $0.390 $0.250 $0.500
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 24.000 $256.000 $128.000 $142.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 24.000 $2,528.000 $1,264.000 $1,408.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 24.000 $1,904.000 $952.000 $1,059.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
CYC 24.000 $1,905.600 $952.800 $1,060.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
CYC 24.000 $292.800 $146.400 $163.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
CYC 24.000 $1,857.600 $928.800 $1,034.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
CYC 24.000 $1,108.800 $554.400 $617.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
CYC 24.000 $291.200 $145.600 $162.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 24.000 $256.000 $128.000 $142.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 24.000 $2,528.000 $1,264.000 $1,407.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 24.000 $1,904.000 $952.000 $1,059.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
CYC 24.000 $1,905.600 $952.800 $1,060.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
CYC 24.000 $292.800 $146.400 $163.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
CYC 24.000 $1,857.600 $928.000 $1,034.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
CYC 24.000 $1,108.800 $554.400 $617.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
CYC 24.000 $291.200 $145.600 $162.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 12.000 $430.000 $128.000 $142.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 12.000 $1,264.000 $1,264.000 $1,407.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 12.000 $952.000 $952.000 $1,059.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
CYC 12.000 $952.800 $952.800 $1,060.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(5)
CYC 12.000 $430.000 $146.400 $163.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
CYC 12.000 $928.800 $928.800 $1,034.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
CYC 12.000 $554.400 $554.400 $617.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
CYC 12.000 $430.000 $145.600 $162.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 12.000 $500.000 $128.000 $142.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 12.000 $1,000.000 $1,264.000 $1,407.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 12.000 $1,000.000 $952.000 $1,059.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
CYC 12.000 $1,000.000 $952.800 $1,060.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
CYC 12.000 $500.000 $146.400 $163.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
CYC 12.000 $900.000 $928.800 $1,034.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
CYC 12.000 $100.000 $554.400 $617.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
CYC 12.000 $500.000 $145.600 $162.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
CYC 24.000 $1,500.000 $320.000 $356.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
CYC 24.000 $1,500.000 $320.000 $356.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
CYC 24.000 $205.000 $209.600 $233.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
CYC 24.000 $1,000.000 $146.400 $163.000
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
CYC 24.000 $1,000.000 $160.000 $178.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 1,500.000 $1.010 $1.500 $1.200
GRAFFITI REMOVAL (PAINTING)
SF 10,000.000 $0.820 $3.000 $2.000
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 300.000 $3.810 $5.000 $1.100
ANTI - GRAFFITI COATING(PERMNENT-TY II)
SF 1,500.000 $0.750 $2.000 $0.300
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 1,500.000 $2.600 $2.000 $0.300
TREE TRIMMING / BRUSH REMOVAL
MI 24.000 $1,650.000 $1,400.000 $500.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 50.000 $916.000 $1,500.000 $2,500.000
TREE REMOVAL (4" - 12" DIA)
EA 500.000 $119.000 $80.000 $10.000
TREE REMOVAL (12" - 18" DIA)
EA 80.000 $155.000 $100.000 $50.000
TREE REMOVAL (18" - 24" DIA)
EA 15.000 $146.000 $120.000 $100.000
TREE REMOVAL (24" - 30" DIA)
EA 15.000 $200.000 $220.000 $100.000
TREE REMOVAL (30" - 36" DIA)
EA 6.000 $250.000 $350.000 $100.000
TREE REMOVAL (36" - 42" DIA)
EA 6.000 $377.000 $500.000 $100.000
TREE REMOVAL (42" - 48" DIA)
EA 6.000 $578.000 $1,000.000 $100.000
STUMP REMOVAL
EA 30.000 $19.000 $100.000 $490.000
TREE AND BRUSH REMOVAL
AC 15.000 $275.000 $2,500.000 $8,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 10,000.000 $1.280 $1.000 $6.000
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
CY 1,000.000 $30.000 $5.000 $35.000
DRAIN INLET CLEANING
EA 2,000.000 $75.000 $90.000 $83.000
PUMP STATION WELL CLEANING
EA 8.000 $1,937.000 $2,000.000 $1,892.000
BASKET AND INLET PIPE CLEANING
EA 8.000 $460.000 $500.000 $556.000
DOWNSPOUT CLEANING
EA 20.000 $275.000 $200.000 $334.000
STORM SEWER CLEANING (PIPE) (<12" DIA)
LF 100.000 $3.000 $6.000 $3.300
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 2,000.000 $3.750 $7.000 $3.900
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 15,000.000 $4.330 $5.600 $5.300
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 5,000.000 $4.740 $6.000 $6.100
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 7,000.000 $6.750 $6.000 $7.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 1,000.000 $7.750 $12.000 $7.800
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 1,000.000 $14.250 $14.000 $10.000
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 110.000 $10.250 $12.000 $17.000
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $14.530 $15.000 $18.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 90.000 $32.000 $18.000 $20.000
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 50.000 $33.000 $20.000 $28.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $16.000 $20.000 $22.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $20.000 $25.000 $24.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 75.000 $20.540 $25.000 $39.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 150.000 $26.810 $35.000 $20.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $13.750 $35.000 $20.000
REALIGN EXISTING RAIL
LF 100.000 $10.000 $10.000 $9.400
REM / REPL TIMBER/STL POST W/O CONC FND
EA 30.000 $40.000 $70.000 $34.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 450.000 $45.000 $80.000 $43.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $150.000 $300.000 $74.000
REALIGN POSTS
EA 75.000 $8.000 $10.000 $5.900
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,000.000 $24.500 $35.000 $32.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 400.000 $60.000 $85.000 $37.000
REPLACE HINGED TOP SGT STEEL POST
EA 50.000 $57.000 $150.000 $23.000
RESET HINGED TOP SGT STL POST
EA 20.000 $2.000 $150.000 $9.100
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $739.310 $1,000.000 $1,153.000
REM & RESET SGT IMPACT HEAD
EA 30.000 $153.240 $200.000 $117.000
REPLACE SGT CABLE ASSEMBLY
EA 18.000 $47.920 $85.000 $107.000
REPLACE SGT CABLE ANCHOR
EA 24.000 $57.270 $85.000 $100.000
REPLACE SGT STRUT
EA 12.000 $38.100 $85.000 $157.000
REPLACE SGT OBJECT MARKER
EA 20.000 $35.630 $50.000 $28.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $169.530 $300.000 $37.000
REPLACE POSTS (TL-3)
EA 3,000.000 $99.000 $140.000 $125.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 16.000 $200.000 $250.000 $191.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $136.000 $250.000 $145.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $980.000 $1,800.000 $1,500.000
REPLACE CABLE (TL-3)
LF 1,000.000 $4.790 $3.000 $2.200
CHECK / RE-TENSION CABLE
EA 225.000 $5.790 $400.000 $294.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,000.000 $15.000 $15.000 $9.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 10.000 $68.000 $150.000 $184.000
REPAIR (TRACC)
EA 1.000 $4,520.000 $4,000.000 $1.000
REPAIR REACT (N) (MISC HARDWARE)
EA 60.000 $984.000 $1,200.000 $977.000
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $2,000.000 $2,850.000 $3,344.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 12.000 $1,170.000 $800.000 $859.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $2,800.000 $2,700.000 $3,344.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 2.000 $500.000 $1,000.000 $5,063.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 2.000 $500.000 $1,000.000 $5,019.000
REMOVE / REPLACE (QUAD - ELITE) NARROW
EA 1.000 $25,000.000 $24,500.000 $24,278.000
REMOVE / REPLACE (QUAD - ELITE) WIDE
EA 1.000 $34,000.000 $38,000.000 $35,267.000
REPAIR (QUADGUARD - ELITE) (CYLINDER)
EA 2.000 $400.000 $1,250.000 $3,456.000
REPAIR (SMTC) (N)
EA 2.000 $1,500.000 $2,000.000 $1,143.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $25,000.000 $37,000.000 $24,604.000
REPAIR (SMTC) (W)
EA 2.000 $1,700.000 $2,500.000 $1,422.000
REPAIR REACT (W) (DIAPHRAGM)
EA 2.000 $200.000 $800.000 $587.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 4.000 $3,833.330 $800.000 $1,794.000
REPAIR TAU II (N)
LF 9.000 $223.760 $400.000 $345.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $14,000.000 $24,500.000 $7,616.000
REPAIR (TAU)(MASH)(N)
EA 1.000 $1,000.000 $2,500.000 $1,892.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 1.000 $500.000 $750.000 $1,641.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 100.000 $75.000 $100.000 $150.000
INSTL TIED CONCRETE EROSN CONTROL MATS
SF 2,000.000 $18.900 $2.000 $15.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 10,000.000 $5.820 $4.900 $5.500
SOUND WALL (12 FT)
LF 48.000 $400.000 $700.000 $95.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $102.000 $150.000 $154.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 740,000.000 $0.570 $0.650 $0.750
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 82,000.000 $0.660 $0.650 $0.550
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 5,000.000 $1.200 $2.500 $3.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 125,000.000 $0.950 $0.900 $1.100
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 18,000.000 $2.250 $3.500 $4.500
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 8,000.000 $2.500 $3.000 $3.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,000.000 $6.840 $8.000 $8.250
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 680,000.000 $0.550 $0.650 $0.750
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 2,000.000 $2.000 $4.000 $4.500
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 1,000.000 $5.500 $8.000 $8.250
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 100.000 $375.000 $750.000 $1,000.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 1.000 $365.000 $50.000 $5,000.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 45.000 $365.000 $100.000 $200.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 350.000 $300.000 $500.000 $350.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 20.000 $230.000 $50.000 $421.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 12.000 $80.000 $50.000 $100.000
TMA (STATIONARY)
DAY 156.000 $190.000 $400.000 $250.000
TMA (MOBILE OPERATION)
HR 5,700.000 $57.000 $55.000 $60.000
TMA (MOBILE OPERATIONS) (SNOW & ICE)
HR 72.000 $140.000 $100.000 $60.000
INCIDENT MANAGEMENT (TYPE A)
HR 40.000 $91.670 $250.000 $193.000
INCIDENT MANAGEMENT (TYPE B)
HR 40.000 $100.000 $250.000 $435.000
INCIDENT MANAGEMENT (TYPE E)
HR 40.000 $140.000 $250.000 $960.000
INCIDENT MANAGEMENT (TYPE F)
HR 20.000 $153.570 $100.000 $274.000
INCIDENT MANAGEMENT (TYPE G)
HR 20.000 $74.670 $100.000 $274.000
INCIDENT MANAGEMENT (TYPE H)
HR 20.000 $81.330 $100.000 $448.000
INCIDENT MANAGEMENT (TYPE I)
HR 40.000 $115.000 $50.000 $960.000
INCIDENT MANAGEMENT (TYPE J)
HR 40.000 $62.670 $25.000 $132.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 2.000 $27,100.000 $30,000.000 $17,738.000
SNOW AND ICE CONTROL (TRUCK)
HR 72.000 $10.000 $40.000 $60.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 216.000 $25.000 $50.000 $39.000
SNOW AND ICE CONTROL (LOADER)
HR 72.000 $91.360 $40.000 $67.000
SNOW AND ICE CONTROL (SEASON)
MO 6.000 $10,000.000 $28,000.000 $45,000.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 144.000 $50.000 $80.000 $36.000
Totals: $9,886,983.080 $9,152,121.616 $9,766,815.540