REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$43.000
|
$10.000
|
$19.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
10.000
|
$20.000
|
$10.000
|
$11.100
|
|
|
REMOVING CONC (CURB)
|
LF
|
10.000
|
$6.670
|
$10.000
|
$2.290
|
|
|
BACKFILL (TY A OR B)
|
CY
|
100.000
|
$30.000
|
$35.000
|
$178.000
|
|
|
BLADING
|
STA
|
800.000
|
$100.000
|
$120.000
|
$88.000
|
|
|
SPOT SODDING
|
SY
|
1,000.000
|
$2.630
|
$11.000
|
$14.800
|
|
|
BLOCK SODDING
|
SY
|
2,000.000
|
$4.740
|
$11.000
|
$15.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
2,000.000
|
$0.150
|
$1.000
|
$0.150
|
|
|
FERTILIZER
|
AC
|
10.000
|
$636.200
|
$650.000
|
$779.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,500.000
|
$11.470
|
$1.000
|
$15.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
200.000
|
$70.050
|
$145.000
|
$306.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
2,000.000
|
$36.850
|
$57.000
|
$52.000
|
|
|
FULL - DEPTH REPAIR CRCP (15")
|
SY
|
50.000
|
$348.000
|
$370.000
|
$396.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
25.000
|
$280.000
|
$350.000
|
$385.000
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
50.000
|
$324.000
|
$335.000
|
$355.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
25.000
|
$215.000
|
$175.000
|
$813.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
15,000.000
|
$0.820
|
$3.000
|
$1.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
25.000
|
$82.000
|
$200.000
|
$64.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
300.000
|
$97.000
|
$125.000
|
$64.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
75.000
|
$237.000
|
$325.000
|
$523.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
15.000
|
$400.000
|
$325.000
|
$523.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
100.000
|
$135.010
|
$150.000
|
$27.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
100.000
|
$111.000
|
$180.000
|
$81.100
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
30.000
|
$400.000
|
$475.000
|
$500.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
700.000
|
$15.000
|
$35.000
|
$22.400
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
104.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
24.000
|
$700.000
|
$650.000
|
$2,500.000
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
500.000
|
$30.000
|
$40.000
|
$75.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
500.000
|
$32.000
|
$35.000
|
$60.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$42.000
|
$1.000
|
$5.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$8.000
|
$3.000
|
$5.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
560.000
|
$24.000
|
$10.000
|
$5.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
150.000
|
$126.000
|
$20.000
|
$143.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
400.000
|
$20.000
|
$25.000
|
$50.000
|
|
|
CONC CURB (TY II)
|
LF
|
500.000
|
$10.000
|
$20.000
|
$5.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
50.000
|
$53.000
|
$60.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
25.000
|
$30.000
|
$30.000
|
$75.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,053.000
|
$1,500.000
|
$958.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.320
|
$3.000
|
$2.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
500.000
|
$11.700
|
$30.000
|
$21.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,178.000
|
$5,000.000
|
$2,066.000
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
3.000
|
$2,557.720
|
$6,000.000
|
$1,376.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,683.260
|
$100.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,500.000
|
$100.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$531.290
|
$30,000.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$26,131.550
|
$2,500.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
1.000
|
$17,000.000
|
$2,500.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
2.000
|
$36,692.440
|
$10,000.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(70)
|
EA
|
1.000
|
$30,000.000
|
$10,000.000
|
$1.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
1,000.000
|
$17.500
|
$15.000
|
$14.800
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
3.000
|
$1,147.000
|
$2,000.000
|
$550.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$1,133.330
|
$750.000
|
$725.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
600.000
|
$35.000
|
$37.000
|
$50.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
400.000
|
$35.000
|
$37.000
|
$65.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
100.000
|
$40.000
|
$35.000
|
$68.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
500.000
|
$50.000
|
$37.000
|
$50.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
500.000
|
$50.000
|
$37.000
|
$65.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
200.000
|
$50.000
|
$25.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1,000.000
|
$4.850
|
$8.000
|
$6.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
200.000
|
$105.790
|
$3.000
|
$38.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,000.000
|
$4.940
|
$8.000
|
$6.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
1,000.000
|
$9.490
|
$3.000
|
$13.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
400.000
|
$8.000
|
$30.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
200.000
|
$8.000
|
$30.000
|
$15.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
40.000
|
$85.000
|
$30.000
|
$15.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,500.000
|
$1.500
|
$1.650
|
$1.900
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
1,000.000
|
$0.720
|
$1.650
|
$2.110
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,000.000
|
$0.900
|
$0.935
|
$1.060
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,500.000
|
$2.070
|
$3.300
|
$3.960
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
9,000.000
|
$2.620
|
$3.850
|
$3.430
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,000.000
|
$6.560
|
$7.700
|
$6.860
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
48.000
|
$118.830
|
$165.000
|
$132.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
32.000
|
$176.700
|
$220.000
|
$211.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
26.000
|
$142.090
|
$220.000
|
$190.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$283.330
|
$220.000
|
$190.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
48.000
|
$139.810
|
$165.000
|
$137.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
7.000
|
$635.720
|
$550.000
|
$728.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
7.000
|
$722.690
|
$550.000
|
$728.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.580
|
$0.935
|
$1.320
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.560
|
$3.850
|
$3.430
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
200.000
|
$5.180
|
$7.700
|
$6.860
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,000.000
|
$0.550
|
$0.715
|
$0.790
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
100.000
|
$1.260
|
$1.600
|
$2.640
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
200.000
|
$1.350
|
$1.600
|
$2.640
|
|
|
PAVEMENT SEALER 4"
|
LF
|
400.000
|
$0.170
|
$0.080
|
$0.110
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,535,500.000
|
$0.170
|
$0.010
|
$0.160
|
|
|
PAVEMENT SEALER 8"
|
LF
|
127,000.000
|
$0.290
|
$0.120
|
$0.210
|
|
|
PAVEMENT SEALER 12"
|
LF
|
38,800.000
|
$0.800
|
$0.480
|
$0.530
|
|
|
PAVEMENT SEALER 24"
|
LF
|
5,200.000
|
$0.980
|
$0.960
|
$1.060
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
48.000
|
$35.650
|
$36.000
|
$31.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
48.000
|
$37.890
|
$36.000
|
$31.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
32.000
|
$92.500
|
$36.000
|
$31.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
26.000
|
$30.000
|
$36.000
|
$31.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
8.000
|
$30.000
|
$36.000
|
$31.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
7.000
|
$15.000
|
$150.000
|
$211.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
7.000
|
$15.000
|
$150.000
|
$211.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
200.000
|
$0.260
|
$0.360
|
$0.530
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
15,000.000
|
$0.370
|
$0.520
|
$0.690
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.350
|
$0.520
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
200.000
|
$0.260
|
$0.360
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,000.000
|
$0.320
|
$0.520
|
$0.690
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
1,000.000
|
$6.790
|
$11.200
|
$15.800
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
6.000
|
$1,750.360
|
$2,000.000
|
$2,954.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
40.000
|
$3.950
|
$15.000
|
$4.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
40.000
|
$3.290
|
$15.000
|
$4.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$2.370
|
$10.000
|
$4.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,400.000
|
$3.710
|
$10.000
|
$4.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
400.000
|
$0.420
|
$0.200
|
$0.370
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,535,500.000
|
$0.520
|
$0.150
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
127,000.000
|
$0.690
|
$0.500
|
$0.740
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
38,800.000
|
$1.830
|
$1.200
|
$1.530
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
5,200.000
|
$3.280
|
$2.420
|
$3.060
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
48.000
|
$38.190
|
$48.000
|
$68.600
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
32.000
|
$47.430
|
$60.000
|
$94.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
48.000
|
$43.300
|
$48.000
|
$68.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
7.000
|
$285.000
|
$300.000
|
$275.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
7.000
|
$550.000
|
$300.000
|
$275.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
6.000
|
$246.500
|
$200.000
|
$315.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
26.000
|
$60.670
|
$72.000
|
$93.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
400.000
|
$0.100
|
$0.024
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,535,500.000
|
$0.100
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
127,000.000
|
$0.210
|
$0.016
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
38,800.000
|
$0.960
|
$0.200
|
$0.260
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,200.000
|
$2.430
|
$0.400
|
$0.530
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
48.000
|
$23.660
|
$8.000
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
32.000
|
$13.470
|
$8.000
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
26.000
|
$15.020
|
$8.000
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
48.000
|
$27.020
|
$8.000
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
7.000
|
$144.170
|
$300.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
7.000
|
$184.170
|
$300.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
6.000
|
$25.000
|
$20.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,580.000
|
$1.810
|
$2.000
|
$1.060
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
30.000
|
$89.300
|
$75.000
|
$100.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
200.000
|
$18.750
|
$100.000
|
$150.000
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LMI
|
40.000
|
$522.460
|
$850.000
|
$835.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
50.000
|
$94.450
|
$150.000
|
$362.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
200.000
|
$55.000
|
$50.000
|
$116.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
3,000.000
|
$2.300
|
$2.800
|
$2.750
|
|
|
SPOT MOWING
|
AC
|
10.000
|
$40.000
|
$100.000
|
$250.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
324.240
|
$40.000
|
$38.000
|
$40.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
6,944.980
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
7,467.600
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
5,840.100
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
3,430.980
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
8,031.000
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (7)
|
AC
|
3,416.000
|
$40.000
|
$38.000
|
$39.000
|
|
|
FULL - WIDTH MOWING - TRACT (8)
|
AC
|
742.000
|
$40.000
|
$38.000
|
$40.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
253.640
|
$210.000
|
$250.000
|
$130.000
|
|
|
BROADCAST APPLICATION
|
AC
|
600.000
|
$70.000
|
$50.000
|
$50.000
|
|
|
WICK APPLICATION OF HERBICIDE
|
AC
|
75.000
|
$25.320
|
$50.000
|
$50.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
30.000
|
$50.000
|
$50.000
|
$28.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$277.920
|
$230.000
|
$200.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
48.000
|
$5,952.860
|
$4,960.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
48.000
|
$6,400.800
|
$5,330.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (4)
|
CYC
|
48.000
|
$4,028.280
|
$3,360.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (5)
|
CYC
|
48.000
|
$977.520
|
$810.000
|
$500.000
|
|
|
LITTER REMOVAL - TRACT (6)
|
CYC
|
48.000
|
$2,940.840
|
$530.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (7)
|
CYC
|
48.000
|
$2,928.000
|
$2,450.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (8)
|
CYC
|
48.000
|
$636.000
|
$740.000
|
$1,875.000
|
|
|
LITTER REMOVAL - TRACT (9)
|
CYC
|
48.000
|
$828.000
|
$1,000.000
|
$1,875.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
72.000
|
$128.000
|
$174.778
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
72.000
|
$1,264.000
|
$1,730.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
72.000
|
$952.000
|
$1,300.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (4)
|
CYC
|
72.000
|
$952.800
|
$1,300.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (5)
|
CYC
|
72.000
|
$146.400
|
$200.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (6)
|
CYC
|
72.000
|
$928.800
|
$1,270.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (7)
|
CYC
|
72.000
|
$554.400
|
$760.000
|
$650.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (8)
|
CYC
|
72.000
|
$145.600
|
$200.000
|
$650.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
24.000
|
$600.000
|
$170.000
|
$459.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
24.000
|
$600.000
|
$440.000
|
$459.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (4)
|
CYC
|
24.000
|
$110.000
|
$290.000
|
$459.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (5)
|
CYC
|
24.000
|
$600.000
|
$200.000
|
$459.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (6)
|
CYC
|
24.000
|
$600.000
|
$220.000
|
$459.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
50,000.000
|
$0.390
|
$0.250
|
$0.500
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$256.000
|
$128.000
|
$142.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$2,528.000
|
$1,264.000
|
$1,408.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
24.000
|
$1,904.000
|
$952.000
|
$1,059.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(4)
|
CYC
|
24.000
|
$1,905.600
|
$952.800
|
$1,060.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(5)
|
CYC
|
24.000
|
$292.800
|
$146.400
|
$163.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(6)
|
CYC
|
24.000
|
$1,857.600
|
$928.800
|
$1,034.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(7)
|
CYC
|
24.000
|
$1,108.800
|
$554.400
|
$617.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(8)
|
CYC
|
24.000
|
$291.200
|
$145.600
|
$162.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$256.000
|
$128.000
|
$142.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$2,528.000
|
$1,264.000
|
$1,407.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
24.000
|
$1,904.000
|
$952.000
|
$1,059.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(4)
|
CYC
|
24.000
|
$1,905.600
|
$952.800
|
$1,060.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)
|
CYC
|
24.000
|
$292.800
|
$146.400
|
$163.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(6)
|
CYC
|
24.000
|
$1,857.600
|
$928.000
|
$1,034.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(7)
|
CYC
|
24.000
|
$1,108.800
|
$554.400
|
$617.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(8)
|
CYC
|
24.000
|
$291.200
|
$145.600
|
$162.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
12.000
|
$430.000
|
$128.000
|
$142.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
12.000
|
$1,264.000
|
$1,264.000
|
$1,407.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
12.000
|
$952.000
|
$952.000
|
$1,059.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(4)
|
CYC
|
12.000
|
$952.800
|
$952.800
|
$1,060.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(5)
|
CYC
|
12.000
|
$430.000
|
$146.400
|
$163.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(6)
|
CYC
|
12.000
|
$928.800
|
$928.800
|
$1,034.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(7)
|
CYC
|
12.000
|
$554.400
|
$554.400
|
$617.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(8)
|
CYC
|
12.000
|
$430.000
|
$145.600
|
$162.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
12.000
|
$500.000
|
$128.000
|
$142.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
12.000
|
$1,000.000
|
$1,264.000
|
$1,407.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
12.000
|
$1,000.000
|
$952.000
|
$1,059.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 4)
|
CYC
|
12.000
|
$1,000.000
|
$952.800
|
$1,060.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 5)
|
CYC
|
12.000
|
$500.000
|
$146.400
|
$163.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 6)
|
CYC
|
12.000
|
$900.000
|
$928.800
|
$1,034.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 7)
|
CYC
|
12.000
|
$100.000
|
$554.400
|
$617.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 8)
|
CYC
|
12.000
|
$500.000
|
$145.600
|
$162.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
24.000
|
$1,500.000
|
$320.000
|
$356.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
24.000
|
$1,500.000
|
$320.000
|
$356.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
|
CYC
|
24.000
|
$205.000
|
$209.600
|
$233.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(5)
|
CYC
|
24.000
|
$1,000.000
|
$146.400
|
$163.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
|
CYC
|
24.000
|
$1,000.000
|
$160.000
|
$178.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
1,500.000
|
$1.010
|
$1.500
|
$1.200
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
10,000.000
|
$0.820
|
$3.000
|
$2.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
300.000
|
$3.810
|
$5.000
|
$1.100
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
1,500.000
|
$0.750
|
$2.000
|
$0.300
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
1,500.000
|
$2.600
|
$2.000
|
$0.300
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
24.000
|
$1,650.000
|
$1,400.000
|
$500.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
50.000
|
$916.000
|
$1,500.000
|
$2,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
500.000
|
$119.000
|
$80.000
|
$10.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
80.000
|
$155.000
|
$100.000
|
$50.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$146.000
|
$120.000
|
$100.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$200.000
|
$220.000
|
$100.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$250.000
|
$350.000
|
$100.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$377.000
|
$500.000
|
$100.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$578.000
|
$1,000.000
|
$100.000
|
|
|
STUMP REMOVAL
|
EA
|
30.000
|
$19.000
|
$100.000
|
$490.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
15.000
|
$275.000
|
$2,500.000
|
$8,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
10,000.000
|
$1.280
|
$1.000
|
$6.000
|
|
|
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
|
CY
|
1,000.000
|
$30.000
|
$5.000
|
$35.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
2,000.000
|
$75.000
|
$90.000
|
$83.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
8.000
|
$1,937.000
|
$2,000.000
|
$1,892.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
8.000
|
$460.000
|
$500.000
|
$556.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
20.000
|
$275.000
|
$200.000
|
$334.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
100.000
|
$3.000
|
$6.000
|
$3.300
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
2,000.000
|
$3.750
|
$7.000
|
$3.900
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
15,000.000
|
$4.330
|
$5.600
|
$5.300
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
5,000.000
|
$4.740
|
$6.000
|
$6.100
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
7,000.000
|
$6.750
|
$6.000
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
1,000.000
|
$7.750
|
$12.000
|
$7.800
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
1,000.000
|
$14.250
|
$14.000
|
$10.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
110.000
|
$10.250
|
$12.000
|
$17.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$14.530
|
$15.000
|
$18.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
90.000
|
$32.000
|
$18.000
|
$20.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
50.000
|
$33.000
|
$20.000
|
$28.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$16.000
|
$20.000
|
$22.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
75.000
|
$20.000
|
$25.000
|
$24.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
75.000
|
$20.540
|
$25.000
|
$39.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
150.000
|
$26.810
|
$35.000
|
$20.000
|
|
|
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
100.000
|
$13.750
|
$35.000
|
$20.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
100.000
|
$10.000
|
$10.000
|
$9.400
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
30.000
|
$40.000
|
$70.000
|
$34.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
450.000
|
$45.000
|
$80.000
|
$43.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$150.000
|
$300.000
|
$74.000
|
|
|
REALIGN POSTS
|
EA
|
75.000
|
$8.000
|
$10.000
|
$5.900
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,000.000
|
$24.500
|
$35.000
|
$32.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
400.000
|
$60.000
|
$85.000
|
$37.000
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
50.000
|
$57.000
|
$150.000
|
$23.000
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
20.000
|
$2.000
|
$150.000
|
$9.100
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
30.000
|
$739.310
|
$1,000.000
|
$1,153.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$153.240
|
$200.000
|
$117.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
18.000
|
$47.920
|
$85.000
|
$107.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
24.000
|
$57.270
|
$85.000
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
12.000
|
$38.100
|
$85.000
|
$157.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
20.000
|
$35.630
|
$50.000
|
$28.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
6.000
|
$169.530
|
$300.000
|
$37.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
3,000.000
|
$99.000
|
$140.000
|
$125.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
16.000
|
$200.000
|
$250.000
|
$191.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
5.000
|
$136.000
|
$250.000
|
$145.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
15.000
|
$980.000
|
$1,800.000
|
$1,500.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$4.790
|
$3.000
|
$2.200
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
225.000
|
$5.790
|
$400.000
|
$294.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
1,000.000
|
$15.000
|
$15.000
|
$9.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
10.000
|
$68.000
|
$150.000
|
$184.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$4,520.000
|
$4,000.000
|
$1.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
60.000
|
$984.000
|
$1,200.000
|
$977.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
15.000
|
$2,000.000
|
$2,850.000
|
$3,344.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
12.000
|
$1,170.000
|
$800.000
|
$859.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
5.000
|
$2,800.000
|
$2,700.000
|
$3,344.000
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$5,063.000
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$5,019.000
|
|
|
REMOVE / REPLACE (QUAD - ELITE) NARROW
|
EA
|
1.000
|
$25,000.000
|
$24,500.000
|
$24,278.000
|
|
|
REMOVE / REPLACE (QUAD - ELITE) WIDE
|
EA
|
1.000
|
$34,000.000
|
$38,000.000
|
$35,267.000
|
|
|
REPAIR (QUADGUARD - ELITE) (CYLINDER)
|
EA
|
2.000
|
$400.000
|
$1,250.000
|
$3,456.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$1,143.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
1.000
|
$25,000.000
|
$37,000.000
|
$24,604.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
2.000
|
$1,700.000
|
$2,500.000
|
$1,422.000
|
|
|
REPAIR REACT (W) (DIAPHRAGM)
|
EA
|
2.000
|
$200.000
|
$800.000
|
$587.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
4.000
|
$3,833.330
|
$800.000
|
$1,794.000
|
|
|
REPAIR TAU II (N)
|
LF
|
9.000
|
$223.760
|
$400.000
|
$345.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
1.000
|
$14,000.000
|
$24,500.000
|
$7,616.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$1,892.000
|
|
|
REPAIR (TAU)(MASH)(N)(BAY)
|
EA
|
1.000
|
$500.000
|
$750.000
|
$1,641.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
100.000
|
$75.000
|
$100.000
|
$150.000
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
2,000.000
|
$18.900
|
$2.000
|
$15.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
10,000.000
|
$5.820
|
$4.900
|
$5.500
|
|
|
SOUND WALL (12 FT)
|
LF
|
48.000
|
$400.000
|
$700.000
|
$95.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$102.000
|
$150.000
|
$154.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
740,000.000
|
$0.570
|
$0.650
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
82,000.000
|
$0.660
|
$0.650
|
$0.550
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
5,000.000
|
$1.200
|
$2.500
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
125,000.000
|
$0.950
|
$0.900
|
$1.100
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
18,000.000
|
$2.250
|
$3.500
|
$4.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
8,000.000
|
$2.500
|
$3.000
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
1,000.000
|
$6.840
|
$8.000
|
$8.250
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
680,000.000
|
$0.550
|
$0.650
|
$0.750
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
2,000.000
|
$2.000
|
$4.000
|
$4.500
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
1,000.000
|
$5.500
|
$8.000
|
$8.250
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
100.000
|
$375.000
|
$750.000
|
$1,000.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
1.000
|
$365.000
|
$50.000
|
$5,000.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
45.000
|
$365.000
|
$100.000
|
$200.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
350.000
|
$300.000
|
$500.000
|
$350.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
20.000
|
$230.000
|
$50.000
|
$421.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
12.000
|
$80.000
|
$50.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
156.000
|
$190.000
|
$400.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
5,700.000
|
$57.000
|
$55.000
|
$60.000
|
|
|
TMA (MOBILE OPERATIONS) (SNOW & ICE)
|
HR
|
72.000
|
$140.000
|
$100.000
|
$60.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
40.000
|
$91.670
|
$250.000
|
$193.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
40.000
|
$100.000
|
$250.000
|
$435.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
40.000
|
$140.000
|
$250.000
|
$960.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
20.000
|
$153.570
|
$100.000
|
$274.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
20.000
|
$74.670
|
$100.000
|
$274.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
20.000
|
$81.330
|
$100.000
|
$448.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
40.000
|
$115.000
|
$50.000
|
$960.000
|
|
|
INCIDENT MANAGEMENT (TYPE J)
|
HR
|
40.000
|
$62.670
|
$25.000
|
$132.000
|
|
|
VACUUM CLEANING OF BRIDGE JOINTS
|
CYC
|
2.000
|
$27,100.000
|
$30,000.000
|
$17,738.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
72.000
|
$10.000
|
$40.000
|
$60.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
216.000
|
$25.000
|
$50.000
|
$39.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
72.000
|
$91.360
|
$40.000
|
$67.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$10,000.000
|
$28,000.000
|
$45,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
144.000
|
$50.000
|
$80.000
|
$36.000
|
|
Totals: |
$9,886,983.080
|
$9,152,121.616
|
$9,766,815.540
|