Show Job Controls
Bid Cobra

HARRIS SH0249 (6383-18-001)

Items: 81

County: HARRIS
Length: N/A
Highway: SH0249
District: HOUSTON
Control Number: 6383-18-001
DBE Goal: N/A
Project: RMC - 638318001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,812,291.78
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,812,291.78
$1,738,245.00
Over/Under Est: -4.09% -$74,046.78
$1,741,185.02
Over/Under Est: -3.92% -$71,106.76
Amt Left: 0.17% $2,940.02
Over/Under Est: -3.12% -$56,541.78
Amt Left: 1.01% $17,505.00
Delta: -0.84% -$14,564.98

Bid Items & Bid Tabulations

81 Total 0 of 81
HARRIS  |  SH0249  |  HOUSTON  |  6383-18-001  |  08/05/2021  |  $1,812,291.78  |  RMC - 638318001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DBI SERVICES, LLC
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (RIPRAP)
SY 100.000 $7.000 $6.000 $5.000 $25.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $80.000 $70.000 $75.000 $140.000
CONC STR REPAIR (STANDARD)
SF 600.000 $90.000 $60.000 $60.000 $80.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $400.000 $360.000 $275.000 $425.000
MOBILIZATION (CALLOUT)
EA 48.000 $728.810 $1,000.000 $200.000 $700.000
MOBILIZATION (EMERGENCY)
EA 12.000 $750.000 $1,000.000 $500.000 $850.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $10.000 $10.000 $4.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,000.000 $8.240 $10.000 $5.000 $3.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 60.000 $18.000 $10.000 $5.000 $20.000
PTB (DES SOURCE)(TY P&P)
LF 60.000 $10.000 $10.000 $5.000 $10.000
PTB (MOVE)(TY P&P)
LF 60.000 $5.000 $10.000 $5.000 $10.000
PTB (STKPL)(TY P&P)
LF 60.000 $5.000 $10.000 $5.000 $10.000
PORT CTB (ALIGNING)
LF 7,000.000 $4.000 $5.000 $2.000 $3.000
CONC CURB (TY II)
LF 40.000 $8.000 $20.000 $5.000 $27.500
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $20.890 $30.000 $25.000 $10.000
MTL W-BEAM GD FEN (STEEL POST)
LF 600.000 $20.580 $30.000 $30.000 $10.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 30.000 $1,500.000 $2,000.000 $2,200.000 $200.000
SHORT RADIUS
LF 80.000 $32.000 $120.000 $20.000 $31.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 35.000 $1,140.160 $1,000.000 $1,060.000 $850.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 20.000 $50.000 $1.000 $1.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $50.000 $600.000 $500.000 $800.000
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $15.240 $6.000 $23.000 $17.000
CHAIN LINK FENCE (REPAIR) (6')
LF 600.000 $18.030 $18.000 $20.000 $17.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $5.000 $1.000 $2.000 $2.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,000.000 $800.000 $850.000 $1,250.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $2,000.000 $500.000 $250.000 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 5,000.000 $6.000 $5.000 $4.000 $1.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 80.000 $10.000 $5.000 $15.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 5,000.000 $6.370 $5.000 $4.000 $4.100
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 200.000 $7.000 $5.000 $5.000 $7.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 30.000 $10.000 $5.000 $15.000 $7.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $0.330 $1.000 $0.250 $0.500
GRAFFITI REMOVAL (BLAST CLEANING)
SF 5,000.000 $1.000 $1.000 $0.150 $1.200
GRAFFITI REMOVAL (PAINTING)
SF 15,000.000 $1.520 $3.000 $1.000 $1.100
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 100.000 $0.100 $3.000 $0.500 $1.200
REPAIR RAIL ELEMENT (W - BEAM)
LF 7,000.000 $14.400 $15.000 $20.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 70.000 $15.000 $15.000 $10.000 $21.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 75.000 $15.000 $15.000 $10.000 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $21.000 $20.000 $20.000 $35.000
RAISE RAIL ELEMENT
LF 300.000 $12.000 $15.000 $10.000 $3.000
REALIGN EXISTING RAIL
LF 1,000.000 $7.150 $10.000 $10.000 $6.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $38.740 $30.000 $35.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $40.550 $40.000 $45.000 $55.000
REALIGN POSTS
EA 120.000 $9.590 $10.000 $6.000 $8.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 8,000.000 $20.000 $20.000 $23.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 900.000 $55.850 $75.000 $60.000 $63.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $6.000 $1.000 $1.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $2,723.200 $3,000.000 $3,200.000 $2,850.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 110.000 $822.350 $1,000.000 $1,000.000 $1,050.000
REM & RESET SGT IMPACT HEAD
EA 60.000 $100.000 $90.000 $25.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 160.000 $76.820 $70.000 $85.000 $78.000
REPLACE SGT CABLE ANCHOR
EA 160.000 $75.000 $70.000 $85.000 $72.000
REPLACE SGT STRUT
EA 80.000 $68.600 $88.000 $90.000 $65.000
REPLACE SGT OBJECT MARKER
EA 200.000 $30.000 $30.000 $25.000 $22.000
REPAIR STEEL POST WITH BASE PLATE
EA 75.000 $78.130 $55.000 $125.000 $250.000
REPAIR (TRACC)
LF 5.000 $60.000 $55.000 $25.000 $500.000
REPAIR REACT (N) (MISC HARDWARE)
EA 15.000 $989.030 $2,000.000 $1,000.000 $775.000
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $2,508.230 $2,000.000 $2,500.000 $2,600.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,000.000 $500.000 $0.010 $1,900.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $1,600.000 $2,200.000 $0.010 $1,900.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 15.000 $1,100.000 $1,500.000 $1,200.000 $800.000
REPAIR REACT (W) (CYLINDERS)
EA 15.000 $2,385.260 $2,800.000 $2,500.000 $2,700.000
REMOVE AND REPLACE (SMTC) (N)
EA 8.000 $19,975.000 $15,000.000 $23,000.000 $19,000.000
REPAIR (SMTC) (N)
EA 10.000 $15,000.000 $1,200.000 $1,000.000 $2,250.000
REMOVE AND REPLACE (SMTC) (W)
EA 8.000 $28,000.000 $30,000.000 $25,000.000 $20,000.000
REPAIR (SMTC) (W)
EA 15.000 $1,800.000 $1,500.000 $1,000.000 $2,250.000
REPAIR REACT (W) (DIAPHRAGM)
EA 1.000 $100.000 $500.000 $100.000 $600.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 1.000 $2,000.000 $1,500.000 $500.000 $1,000.000
REMOVE AND REPLACE TAU II (W)
EA 3.000 $24,200.000 $15,000.000 $28,000.000 $15,000.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 2.000 $1,500.000 $1,000.000 $1,500.000 $1,050.000
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
EA 1.000 $3,133.670 $1,000.000 $2,500.000 $2,750.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 1.000 $3,412.500 $3,000.000 $3,500.000 $2,750.000
REPAIR (TAU)(II)(W)(BAY)
EA 2.000 $495.000 $500.000 $1,000.000 $500.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 3.000 $10,095.860 $10,000.000 $24,000.000 $6,900.000
REPAIR (TAU)(MASH)(N)
EA 2.000 $1,000.000 $800.000 $500.000 $2,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 2.000 $500.000 $500.000 $1,500.000 $550.000
REPAIR (TAU)(MASH)(N)
LF 50.000 $158.330 $125.000 $300.000 $150.000
CONCRETE RAIL REPAIR (MISC)
LF 100.000 $60.000 $80.000 $50.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $100.000 $90.000 $100.000
TMA (STATIONARY)
DAY 125.000 $237.360 $300.000 $250.000 $1,000.000
Totals: $1,812,291.780 $1,738,245.000 $1,741,185.020 $1,755,750.000