Job Info for 6360-61-001

County: HARRIS Highway: IH0010 Date: 07/14/2020 (4 years ago) Engineer's Estimate: $119,040 Control Number: 6360-61-001
Project: MMC - 636061001 District: HOUSTON Time: 120 CALENDAR DAYS Type: POT HOLE PATCHING BULK BACKUKP MATERIAL

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $119,040.00
WALLER COUNTY ASPHALT INC.   $126,720.00 1
6.45% | $7,680.00
TEXAS MATERIALS GROUP, INC.   $144,000.00 2
20.97% | $24,960.00
13.64% | $17,280.00
CENTURY ASPHALT, LTD.   $160,000.00 3
34.41% | $40,960.00
26.26% | $33,280.00
11.11% | $16,000.00

Bid Items

Items: 2, 0 filtered
HARRIS IH0010  |  HOUSTON  |  6360-61-001  |  07/14/2020  |  $119,040  |  MMC - 636061001  |  POT HOLE PATCHING BULK BACKUKP MATERIAL  |  120 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate WALLER COUNTY ASPHALT INC. TEXAS MATERIALS GROUP, INC. CENTURY ASPHALT, LTD.
8019 6007 ASPHALTIC CONC PATCH MATERIAL (PICKUP) TON 640.000 $91.000 $93.000 $110.000 $120.000
8019 6010 ASPHALTIC CONC PATCH MATERIAL (DEL) TON 640.000 $95.000 $105.000 $115.000 $130.000
Totals: $119,040.00 $126,720.00 $144,000.00 $160,000.00