REMOVING CONC (CURB)
|
LF
|
300.000
|
$2.700
|
$10.000
|
$3.360
|
$2.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
50.000
|
$11.870
|
$20.000
|
$17.910
|
$15.000
|
|
|
BLADING
|
STA
|
100.000
|
$107.140
|
$95.000
|
$80.000
|
$100.000
|
|
|
BLADING
|
LF
|
10,000.000
|
$4.530
|
$2.000
|
$8.000
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
500.000
|
$46.770
|
$45.000
|
$9.900
|
$80.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
9,000.000
|
$18.230
|
$27.000
|
$3.300
|
$33.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
600.000
|
$27.890
|
$40.000
|
$6.600
|
$62.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (7"-13")
|
SY
|
300.000
|
$150.000
|
$75.000
|
$21.450
|
$103.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
1,500.000
|
$224.640
|
$280.000
|
$350.000
|
$245.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
500.000
|
$294.220
|
$285.000
|
$400.000
|
$270.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
750.000
|
$272.310
|
$290.000
|
$450.000
|
$290.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
500.000
|
$327.860
|
$290.000
|
$400.000
|
$270.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
100.000
|
$36.000
|
$60.000
|
$10.000
|
$36.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
75.000
|
$36.000
|
$75.000
|
$10.000
|
$38.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
75.000
|
$96.140
|
$90.000
|
$24.600
|
$85.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
75.000
|
$126.730
|
$125.000
|
$40.000
|
$120.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
10.000
|
$491.670
|
$550.000
|
$500.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,500.000
|
$7.900
|
$18.000
|
$2.500
|
$18.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
48.000
|
$470.930
|
$1,000.000
|
$2,500.000
|
$500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$1,737.910
|
$1,500.000
|
$3,000.000
|
$1,000.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
3,000.000
|
$2.920
|
$5.000
|
$0.280
|
$4.000
|
|
|
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
|
LF
|
25.000
|
$24.670
|
$20.000
|
$2.220
|
$25.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
25.000
|
$13.550
|
$30.000
|
$40.000
|
$25.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
200.000
|
$43.180
|
$25.000
|
$7.150
|
$70.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
100.000
|
$9.570
|
$25.000
|
$7.150
|
$10.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,896.820
|
$1,700.000
|
$837.910
|
$1,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,411.060
|
$1,600.000
|
$636.190
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,416.670
|
$2,400.000
|
$1,993.050
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$428.570
|
$500.000
|
$55.520
|
$200.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$2,056.360
|
$1,500.000
|
$16,288.940
|
$2,100.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$1,300.000
|
$250.000
|
$37.010
|
$1,050.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$2,663.380
|
$1,000.000
|
$55.520
|
$1,040.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$22,604.000
|
$16,000.000
|
$19,098.950
|
$24,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$35,493.000
|
$24,000.000
|
$26,605.280
|
$32,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
1.000
|
$15,334.000
|
$16,000.000
|
$17,944.130
|
$24,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
1.000
|
$22,400.000
|
$24,000.000
|
$26,605.280
|
$33,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$8,569.000
|
$2,000.000
|
$6,424.800
|
$9,400.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
1.000
|
$9,665.000
|
$2,000.000
|
$6,424.800
|
$2,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
20.000
|
$11.820
|
$20.000
|
$22.780
|
$28.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
20.000
|
$9.830
|
$20.000
|
$22.780
|
$18.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$900.000
|
$1,000.000
|
$557.850
|
$1,200.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
300.000
|
$18.140
|
$35.000
|
$17.220
|
$18.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
200.000
|
$15.000
|
$35.000
|
$19.130
|
$18.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
30.000
|
$15.000
|
$35.000
|
$13.980
|
$35.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
500.000
|
$19.930
|
$25.000
|
$17.220
|
$26.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
100.000
|
$19.590
|
$25.000
|
$19.130
|
$45.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
30.000
|
$20.000
|
$40.000
|
$14.540
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
25.000
|
$8.380
|
$4.000
|
$3.090
|
$8.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$3.000
|
$10.000
|
$4.060
|
$8.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
25.000
|
$13.000
|
$25.000
|
$13.790
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
25.000
|
$5.500
|
$10.000
|
$4.060
|
$8.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$10.890
|
$20.000
|
$4.060
|
$8.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$4.000
|
$100.000
|
$1.480
|
$8.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$23.250
|
$15.000
|
$7.610
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
600.000
|
$0.630
|
$1.080
|
$1.320
|
$8.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20,000.000
|
$0.700
|
$0.800
|
$0.990
|
$0.800
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,000.000
|
$2.400
|
$3.250
|
$3.950
|
$3.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,000.000
|
$2.700
|
$6.500
|
$7.900
|
$6.400
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
35.000
|
$106.070
|
$160.000
|
$197.540
|
$160.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
25.000
|
$129.670
|
$170.000
|
$210.700
|
$171.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$140.440
|
$215.000
|
$192.470
|
$215.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
20.000
|
$124.360
|
$130.000
|
$115.480
|
$129.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
50.000
|
$128.440
|
$160.000
|
$197.540
|
$161.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$465.100
|
$540.000
|
$658.450
|
$535.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
8.000
|
$482.290
|
$540.000
|
$658.450
|
$535.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
1.000
|
$4.510
|
$3.250
|
$2.890
|
$3.200
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
10.000
|
$319.620
|
$140.000
|
$125.110
|
$140.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$440.300
|
$540.000
|
$481.180
|
$535.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$107.000
|
$130.000
|
$115.480
|
$129.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
10,000.000
|
$0.700
|
$0.800
|
$0.720
|
$0.800
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.370
|
$3.250
|
$2.890
|
$3.200
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
100.000
|
$3.100
|
$6.450
|
$5.770
|
$6.400
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$134.830
|
$90.000
|
$81.800
|
$91.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
120,000.000
|
$0.490
|
$0.660
|
$0.760
|
$0.700
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,042,500.000
|
$0.040
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAVEMENT SEALER 8"
|
LF
|
315,000.000
|
$0.070
|
$0.110
|
$0.130
|
$0.110
|
|
|
PAVEMENT SEALER 12"
|
LF
|
7,000.000
|
$0.120
|
$0.270
|
$0.330
|
$0.270
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,500.000
|
$0.170
|
$0.540
|
$0.660
|
$0.550
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
35.000
|
$5.570
|
$27.000
|
$32.920
|
$27.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
50.000
|
$9.460
|
$27.000
|
$32.920
|
$27.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
15.000
|
$5.100
|
$27.000
|
$24.060
|
$27.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
25.000
|
$8.280
|
$27.000
|
$32.920
|
$27.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$19.610
|
$27.000
|
$24.060
|
$27.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
20.000
|
$7.060
|
$27.000
|
$24.060
|
$27.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
8.000
|
$42.070
|
$108.000
|
$131.690
|
$107.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
8.000
|
$38.650
|
$108.000
|
$96.240
|
$107.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$8.450
|
$27.000
|
$24.060
|
$27.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
1.000
|
$22.050
|
$108.000
|
$96.240
|
$108.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
1.000
|
$2.010
|
$1.080
|
$0.960
|
$1.100
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
1.000
|
$5.000
|
$27.000
|
$24.060
|
$27.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
120,000.000
|
$0.350
|
$0.370
|
$0.460
|
$0.380
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
200,000.000
|
$0.350
|
$0.360
|
$0.460
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
500.000
|
$0.350
|
$0.378
|
$0.460
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
200,000.000
|
$0.360
|
$0.360
|
$0.460
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
2.000
|
$424.340
|
$540.000
|
$481.180
|
$535.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$253.120
|
$325.000
|
$288.710
|
$322.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$2.890
|
$4.300
|
$3.850
|
$4.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
100.000
|
$3.190
|
$4.320
|
$3.850
|
$4.300
|
|
REFL PAV MRKR TY I-R
|
EA
|
100.000
|
$5.430
|
$4.320
|
$3.850
|
$4.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$2.750
|
$4.320
|
$3.850
|
$4.280
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$3.640
|
$4.320
|
$3.850
|
$4.280
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
100.000
|
$0.100
|
$0.670
|
$0.600
|
$0.660
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,042,500.000
|
$0.120
|
$0.150
|
$0.400
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
315,000.000
|
$0.200
|
$0.250
|
$0.530
|
$0.430
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
16,000.000
|
$0.310
|
$1.050
|
$1.320
|
$1.070
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,100.000
|
$0.390
|
$2.100
|
$2.630
|
$2.140
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
35.000
|
$13.430
|
$52.000
|
$65.850
|
$53.520
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
25.000
|
$19.520
|
$52.000
|
$65.850
|
$53.520
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
1.000
|
$37.700
|
$52.000
|
$48.120
|
$53.520
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$18.860
|
$52.000
|
$65.850
|
$53.520
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
8.000
|
$97.400
|
$210.000
|
$263.380
|
$214.070
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
8.000
|
$104.860
|
$210.000
|
$263.380
|
$214.070
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$70.460
|
$210.000
|
$192.470
|
$214.070
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$10.900
|
$52.000
|
$48.120
|
$53.520
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
10.000
|
$34.380
|
$85.000
|
$76.990
|
$85.630
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
1.000
|
$17.750
|
$52.000
|
$48.120
|
$53.520
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,042,500.000
|
$0.010
|
$0.030
|
$0.030
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
315,000.000
|
$0.030
|
$0.050
|
$0.050
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
7,000.000
|
$0.110
|
$0.110
|
$0.130
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,100.000
|
$0.210
|
$0.210
|
$0.260
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
35.000
|
$10.830
|
$10.500
|
$13.170
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
25.000
|
$16.020
|
$10.500
|
$13.170
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$11.080
|
$10.500
|
$9.620
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$10.820
|
$10.500
|
$9.620
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
2.000
|
$18.650
|
$10.500
|
$9.620
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
50.000
|
$15.380
|
$10.500
|
$13.170
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
8.000
|
$48.000
|
$52.000
|
$65.850
|
$54.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
8.000
|
$48.000
|
$52.000
|
$65.850
|
$54.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$33.530
|
$52.000
|
$48.120
|
$54.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$4.500
|
$52.000
|
$48.120
|
$54.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
1.000
|
$2.960
|
$10.500
|
$9.620
|
$11.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
100.000
|
$96.250
|
$150.000
|
$115.950
|
$155.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
10,000.000
|
$2.360
|
$2.000
|
$2.910
|
$2.750
|
|
|
SPOT MOWING
|
AC
|
100.000
|
$29.380
|
$43.000
|
$16.160
|
$36.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
1,276.000
|
$75.000
|
$43.000
|
$20.500
|
$64.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
504.000
|
$75.000
|
$43.000
|
$20.500
|
$64.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
2.000
|
$75.000
|
$43.000
|
$39.370
|
$64.000
|
|
|
FULL - WIDTH MOWING - TRACT (4)
|
AC
|
8.400
|
$75.000
|
$43.000
|
$34.460
|
$64.000
|
|
|
FULL - WIDTH MOWING - TRACT (5)
|
AC
|
12.000
|
$75.000
|
$43.000
|
$34.940
|
$64.000
|
|
|
FULL - WIDTH MOWING - TRACT (6)
|
AC
|
7.600
|
$75.000
|
$43.000
|
$34.290
|
$64.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
200.000
|
$222.220
|
$150.000
|
$49.430
|
$140.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
50.000
|
$13.500
|
$20.000
|
$40.440
|
$30.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
24.000
|
$6,324.000
|
$5,250.000
|
$11.350
|
$8,000.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
24.000
|
$4,248.000
|
$5,250.000
|
$11.350
|
$8,000.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
20.000
|
$55.000
|
$1.000
|
$19.790
|
$220.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
12.000
|
$2,808.000
|
$1,900.000
|
$2,311.160
|
$1,500.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
12.000
|
$2,136.000
|
$1,900.000
|
$1,728.430
|
$1,100.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (1)
|
CYC
|
12.000
|
$201.600
|
$900.000
|
$1,659.290
|
$1,100.000
|
|
|
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
|
CYC
|
12.000
|
$163.200
|
$650.000
|
$1,343.240
|
$860.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (1)
|
CYC
|
12.000
|
$780.000
|
$650.000
|
$641.990
|
$410.000
|
|
|
DEBRIS-DIRECT CONNECTOR - AREA (2)
|
CYC
|
12.000
|
$948.000
|
$650.000
|
$780.260
|
$500.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
20.000
|
$163.210
|
$210.000
|
$238.380
|
$220.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
10,000.000
|
$0.190
|
$1.000
|
$0.100
|
$1.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$2,808.000
|
$4,500.000
|
$4,778.370
|
$4,200.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$2,136.000
|
$3,500.000
|
$3,572.090
|
$3,100.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$2,808.000
|
$4,500.000
|
$4,776.400
|
$4,200.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$2,136.000
|
$3,500.000
|
$3,572.090
|
$3,100.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
12.000
|
$3,468.000
|
$4,500.000
|
$5,899.050
|
$5,200.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
12.000
|
$2,952.000
|
$4,100.000
|
$5,021.340
|
$4,400.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
24.000
|
$2,386.000
|
$4,500.000
|
$3,429.210
|
$3,000.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
24.000
|
$1,931.000
|
$4,000.000
|
$2,776.030
|
$2,400.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
24.000
|
$780.000
|
$1,300.000
|
$1,326.780
|
$1,150.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(2)
|
CYC
|
24.000
|
$948.000
|
$1,600.000
|
$1,612.540
|
$1,400.000
|
|
|
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
|
LS
|
1.000
|
$25,000.000
|
$32,000.000
|
$28,870.500
|
$50,000.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
500.000
|
$1.200
|
$5.000
|
$2.110
|
$1.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
10.000
|
$1,100.000
|
$1,500.000
|
$555.840
|
$1,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
15.000
|
$45.020
|
$50.000
|
$16.160
|
$200.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
15.000
|
$72.480
|
$100.000
|
$18.100
|
$350.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$114.860
|
$100.000
|
$21.030
|
$450.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$170.750
|
$100.000
|
$25.900
|
$500.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$271.270
|
$100.000
|
$45.260
|
$700.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$384.450
|
$200.000
|
$74.480
|
$900.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$400.000
|
$200.000
|
$132.920
|
$1,100.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
800.000
|
$71.760
|
$70.000
|
$154.310
|
$65.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
1.000
|
$1,783.160
|
$1,800.000
|
$3,359.640
|
$1,900.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
2.000
|
$342.390
|
$550.000
|
$2,971.990
|
$550.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
1.000
|
$208.770
|
$325.000
|
$2,971.990
|
$330.000
|
|
|
SUMP CLEANING
|
EA
|
1.000
|
$358.920
|
$550.000
|
$3,359.640
|
$550.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
300.000
|
$2.560
|
$3.500
|
$1.920
|
$3.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
15,000.000
|
$3.640
|
$4.400
|
$2.890
|
$4.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
45,000.000
|
$4.300
|
$5.250
|
$3.370
|
$5.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
7,500.000
|
$5.130
|
$8.400
|
$3.850
|
$8.100
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
1,000.000
|
$7.230
|
$9.500
|
$4.330
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
300.000
|
$7.040
|
$11.500
|
$4.810
|
$11.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
2,000.000
|
$8.480
|
$15.500
|
$7.220
|
$16.000
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
30.000
|
$20.000
|
$20.500
|
$8.660
|
$20.000
|
|
|
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
|
LF
|
30.000
|
$22.000
|
$30.500
|
$12.030
|
$30.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
100.000
|
$8.080
|
$13.500
|
$11.550
|
$13.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
100.000
|
$11.760
|
$15.500
|
$13.470
|
$14.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$15.990
|
$16.500
|
$15.400
|
$16.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
1,000.000
|
$17.030
|
$19.000
|
$26.340
|
$18.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
100.000
|
$21.000
|
$21.000
|
$21.170
|
$20.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
25.000
|
$25.400
|
$30.000
|
$31.760
|
$30.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
25.000
|
$4.270
|
$10.000
|
$8.660
|
$11.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$15.000
|
$14.000
|
$7.360
|
$14.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
3.000
|
$8.330
|
$125.000
|
$10.360
|
$50.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
3.000
|
$9.420
|
$125.000
|
$24.990
|
$50.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
300.000
|
$7.000
|
$20.000
|
$2.100
|
$5.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
200.000
|
$31.290
|
$75.000
|
$31.300
|
$35.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
150.000
|
$50.720
|
$100.000
|
$57.640
|
$44.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$98.750
|
$180.000
|
$199.950
|
$250.000
|
|
|
REALIGN POSTS
|
EA
|
200.000
|
$11.710
|
$20.000
|
$9.780
|
$5.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,500.000
|
$21.400
|
$24.000
|
$18.840
|
$22.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$44.230
|
$50.000
|
$37.890
|
$45.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
5.000
|
$2,428.570
|
$3,000.000
|
$2,205.680
|
$2,700.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
75.000
|
$892.310
|
$1,000.000
|
$901.470
|
$930.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$96.250
|
$100.000
|
$51.470
|
$100.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
35.000
|
$76.250
|
$250.000
|
$122.570
|
$120.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
35.000
|
$80.380
|
$200.000
|
$114.670
|
$120.000
|
|
|
REPLACE SGT STRUT
|
EA
|
25.000
|
$64.620
|
$126.000
|
$100.190
|
$110.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
5.000
|
$23.330
|
$50.000
|
$29.380
|
$22.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$90.260
|
$90.000
|
$199.950
|
$220.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$17,000.000
|
$18,500.000
|
$16,461.460
|
$21,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$22,500.000
|
$25,000.000
|
$32,614.890
|
$30,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
3.000
|
$1,500.000
|
$2,500.000
|
$2,573.450
|
$1,900.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
1.000
|
$4,199.560
|
$4,300.000
|
$3,558.420
|
$2,000.000
|
|
|
REPAIR (CATCB - FRNT SECT)
|
EA
|
1.000
|
$450.000
|
$100.000
|
$111.040
|
$500.000
|
|
|
REPAIR (CATCB - REAR SECT)
|
EA
|
1.000
|
$450.000
|
$100.000
|
$111.040
|
$500.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
1.000
|
$1,000.000
|
$1,350.000
|
$834.870
|
$2,800.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
7.000
|
$1,245.590
|
$1,200.000
|
$1,385.830
|
$1,000.000
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
3.000
|
$119.350
|
$100.000
|
$1,980.220
|
$1,000.000
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
2.000
|
$107.140
|
$100.000
|
$2,461.400
|
$1,000.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
2.000
|
$237.100
|
$100.000
|
$2,461.400
|
$1,000.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
2.000
|
$1,718.760
|
$3,000.000
|
$2,942.570
|
$3,300.000
|
|
|
REPAIR REACT (MISC) (HARDWARE)
|
EA
|
5.000
|
$250.000
|
$1,200.000
|
$1,012.730
|
$900.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
5.000
|
$2,113.890
|
$3,000.000
|
$2,626.110
|
$3,300.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
8.000
|
$1,219.910
|
$2,000.000
|
$2,013.340
|
$800.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
8.000
|
$1,881.860
|
$3,000.000
|
$10,245.990
|
$3,300.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
3.000
|
$1,620.000
|
$1,500.000
|
$2,097.750
|
$1,600.000
|
|
|
REPAIR TAU II (N)
|
LF
|
35.000
|
$75.000
|
$250.000
|
$387.610
|
$300.000
|
|
|
REPAIR TAU II (W)
|
LF
|
5.000
|
$75.000
|
$180.000
|
$283.250
|
$300.000
|
|
|
REPAIR TAU II (W) (MISC HARDWARE)
|
EA
|
1.000
|
$2,233.330
|
$1,800.000
|
$1,797.720
|
$1,800.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
1.000
|
$2,939.290
|
$3,150.000
|
$849.760
|
$1,900.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
15.000
|
$97.910
|
$70.000
|
$107.700
|
$120.000
|
|
|
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
|
LF
|
15.000
|
$55.220
|
$90.000
|
$237.650
|
$120.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
50.000
|
$850.000
|
$900.000
|
$366.660
|
$245.000
|
|
|
TYPE CAC CONCRETE
|
CY
|
10.000
|
$650.000
|
$2,000.000
|
$35.100
|
$1,900.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
75.000
|
$82.690
|
$90.000
|
$21.550
|
$85.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
100,000.000
|
$1.060
|
$0.610
|
$0.700
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
100,000.000
|
$0.600
|
$0.610
|
$0.700
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
15,000.000
|
$1.090
|
$0.760
|
$0.870
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
10,000.000
|
$3.130
|
$4.020
|
$4.660
|
$4.300
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
100,000.000
|
$1.090
|
$0.610
|
$0.700
|
$0.650
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
500.000
|
$0.600
|
$0.610
|
$0.700
|
$0.650
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
100,000.000
|
$0.600
|
$0.810
|
$0.930
|
$0.900
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$750.000
|
$500.000
|
$104.770
|
$625.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
200.000
|
$300.000
|
$350.000
|
$82.590
|
$240.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
10.000
|
$250.250
|
$100.000
|
$86.500
|
$375.000
|
|
|
TMA (STATIONARY)
|
EA
|
200.000
|
$115.990
|
$300.000
|
$112.860
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$20.180
|
$75.000
|
$73.720
|
$24.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
25.000
|
$3.880
|
$6.000
|
$3.850
|
$6.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
100.000
|
$16.530
|
$45.000
|
$97.790
|
$55.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
400.000
|
$23.820
|
$45.000
|
$116.880
|
$45.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
25.000
|
$57.610
|
$100.000
|
$192.160
|
$58.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
3.000
|
$19,300.000
|
$25,000.000
|
$24,562.280
|
$25,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$60.000
|
$35.000
|
$26.460
|
$30.000
|
|
Totals: |
$4,578,304.370
|
$5,431,785.830
|
$5,524,959.898
|
$5,592,106.570
|