REMOVING CONC (CURB)
|
LF
|
50.000
|
$6.600
|
$10.000
|
$1.000
|
$21.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
10.000
|
$43.100
|
$20.000
|
$17.000
|
$82.000
|
|
|
BLADING
|
STA
|
100.000
|
$87.500
|
$95.000
|
$205.000
|
$115.000
|
|
|
BLADING
|
LF
|
5,000.000
|
$4.800
|
$2.000
|
$5.000
|
$4.600
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
250.000
|
$49.900
|
$47.000
|
$80.000
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
9,000.000
|
$23.000
|
$27.500
|
$40.000
|
$24.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
100.000
|
$26.000
|
$44.000
|
$70.000
|
$45.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (7"-13")
|
SY
|
20.000
|
$95.000
|
$150.000
|
$120.000
|
$100.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
500.000
|
$298.900
|
$210.000
|
$268.000
|
$230.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
250.000
|
$261.000
|
$214.000
|
$316.000
|
$250.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
250.000
|
$248.300
|
$244.000
|
$322.000
|
$265.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
250.000
|
$412.600
|
$345.000
|
$395.000
|
$260.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
75.000
|
$70.300
|
$90.000
|
$90.000
|
$200.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
75.000
|
$128.200
|
$125.000
|
$115.000
|
$360.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
10.000
|
$419.700
|
$700.000
|
$450.000
|
$475.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
48.000
|
$382.900
|
$2,650.000
|
$300.000
|
$1,250.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$454.300
|
$3,000.000
|
$2,500.000
|
$1,875.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
1,000.000
|
$7.900
|
$10.000
|
$6.000
|
$5.000
|
|
|
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
|
LF
|
30.000
|
$17.400
|
$20.000
|
$16.000
|
$38.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
30.000
|
$15.000
|
$30.000
|
$35.000
|
$38.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
200.000
|
$19.700
|
$25.000
|
$75.000
|
$44.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
100.000
|
$15.200
|
$25.000
|
$10.500
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$688.400
|
$1,700.000
|
$2,400.000
|
$2,260.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$987.700
|
$2,000.000
|
$1,250.000
|
$1,400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,489.100
|
$2,400.000
|
$2,900.000
|
$3,550.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$114.100
|
$500.000
|
$240.000
|
$490.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$11,376.800
|
$20,000.000
|
$29,000.000
|
$25,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$785.800
|
$5,000.000
|
$550.000
|
$950.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
20.000
|
$19.000
|
$20.000
|
$28.000
|
$50.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
20.000
|
$8.200
|
$20.000
|
$23.000
|
$50.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,359.300
|
$1,000.000
|
$1,200.000
|
$1,700.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
100.000
|
$18.300
|
$14.500
|
$18.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
150.000
|
$25.400
|
$29.000
|
$18.000
|
$28.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
30.000
|
$28.700
|
$35.000
|
$18.000
|
$36.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$25.400
|
$14.500
|
$30.000
|
$26.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
200.000
|
$23.000
|
$14.500
|
$36.000
|
$29.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
30.000
|
$28.600
|
$38.000
|
$48.000
|
$37.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$470.200
|
$400.000
|
$305.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$800.000
|
$600.000
|
$480.000
|
$865.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$578.700
|
$600.000
|
$460.000
|
$820.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$700.000
|
$440.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$888.000
|
$950.000
|
$640.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$675.000
|
$1,000.000
|
$590.000
|
$1,000.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,000.000
|
$4.600
|
$3.500
|
$4.000
|
$6.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
15.000
|
$3.150
|
$20.000
|
$4.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$6.700
|
$20.000
|
$4.000
|
$25.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
300.000
|
$0.900
|
$0.309
|
$0.350
|
$2.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,500.000
|
$0.800
|
$0.876
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,000.000
|
$2.500
|
$2.060
|
$2.200
|
$3.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,000.000
|
$3.700
|
$3.090
|
$3.300
|
$6.600
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
35.000
|
$91.000
|
$87.550
|
$95.000
|
$160.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
25.000
|
$130.000
|
$144.200
|
$152.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$150.700
|
$231.750
|
$248.000
|
$120.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
20.000
|
$146.700
|
$144.200
|
$150.000
|
$135.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
50.000
|
$113.800
|
$128.750
|
$136.000
|
$120.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$324.800
|
$463.500
|
$490.000
|
$635.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
8.000
|
$339.400
|
$463.500
|
$490.000
|
$570.000
|
|
REFL PAV MRK TY I (W) (ISLAND) (100MIL)
|
SF
|
1.000
|
$5.000
|
$206.000
|
$220.000
|
$4.000
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
10.000
|
$124.500
|
$360.500
|
$380.000
|
$345.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$361.200
|
$515.000
|
$540.000
|
$600.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
1.000
|
$124.400
|
$128.750
|
$140.000
|
$260.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
5,000.000
|
$0.800
|
$0.721
|
$0.800
|
$1.250
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.200
|
$2.050
|
$2.200
|
$3.250
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
100.000
|
$4.100
|
$4.120
|
$4.400
|
$6.500
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
5.000
|
$180.100
|
$309.000
|
$325.000
|
$180.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
1,000.000
|
$0.400
|
$0.876
|
$1.000
|
$1.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
261,800.000
|
$0.100
|
$0.031
|
$0.030
|
$0.110
|
|
|
PAVEMENT SEALER 8"
|
LF
|
9,500.000
|
$0.200
|
$0.052
|
$0.050
|
$0.180
|
|
|
PAVEMENT SEALER 12"
|
LF
|
6,000.000
|
$0.400
|
$0.124
|
$0.150
|
$0.450
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,100.000
|
$0.400
|
$0.247
|
$0.250
|
$0.750
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
35.000
|
$10.900
|
$5.150
|
$5.500
|
$58.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
50.000
|
$15.900
|
$5.150
|
$6.000
|
$58.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
15.000
|
$6.600
|
$10.300
|
$11.000
|
$61.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
25.000
|
$19.000
|
$10.300
|
$11.000
|
$65.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$18.500
|
$15.450
|
$16.000
|
$66.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
20.000
|
$19.200
|
$10.300
|
$11.000
|
$58.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
8.000
|
$86.700
|
$41.200
|
$44.000
|
$200.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
8.000
|
$96.800
|
$41.200
|
$44.000
|
$300.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
1.000
|
$16.000
|
$10.300
|
$11.000
|
$61.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
1.000
|
$60.200
|
$51.500
|
$55.000
|
$91.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
1.000
|
$6.700
|
$25.750
|
$30.000
|
$56.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
1.000
|
$8.400
|
$25.750
|
$30.000
|
$44.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
60,000.000
|
$0.400
|
$0.433
|
$0.500
|
$0.640
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$0.400
|
$0.412
|
$0.450
|
$0.640
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
500.000
|
$0.400
|
$0.618
|
$0.650
|
$0.640
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$0.400
|
$0.412
|
$0.450
|
$0.640
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
2.000
|
$123.100
|
$2,250.000
|
$2,450.000
|
$175.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$222.900
|
$360.500
|
$380.000
|
$225.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
25.000
|
$2.600
|
$4.635
|
$5.000
|
$4.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
50.000
|
$2.800
|
$4.635
|
$5.000
|
$4.200
|
|
REFL PAV MRKR TY I-R
|
EA
|
25.000
|
$3.500
|
$5.150
|
$5.400
|
$4.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
50.000
|
$2.500
|
$4.635
|
$4.900
|
$4.200
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,000.000
|
$3.000
|
$4.120
|
$4.400
|
$4.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
100.000
|
$0.300
|
$0.155
|
$0.200
|
$0.380
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
261,800.000
|
$0.200
|
$0.185
|
$0.200
|
$0.410
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
950.000
|
$0.500
|
$0.258
|
$0.300
|
$0.480
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
6,000.000
|
$0.800
|
$0.618
|
$0.650
|
$0.610
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,100.000
|
$1.300
|
$1.288
|
$1.400
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
35.000
|
$29.600
|
$20.600
|
$22.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
25.000
|
$34.600
|
$46.350
|
$50.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
1.000
|
$37.800
|
$61.800
|
$65.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
52.000
|
$35.500
|
$25.750
|
$27.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
8.000
|
$125.600
|
$125.000
|
$135.000
|
$135.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
8.000
|
$137.200
|
$125.000
|
$135.000
|
$140.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$116.200
|
$154.500
|
$163.000
|
$220.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
1.000
|
$44.200
|
$51.500
|
$55.000
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
15.000
|
$9.700
|
$90.000
|
$108.000
|
$175.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
20.000
|
$32.300
|
$51.500
|
$55.000
|
$70.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
261,800.000
|
$0.100
|
$0.021
|
$0.020
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,500.000
|
$0.100
|
$0.062
|
$0.070
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,000.000
|
$0.100
|
$0.124
|
$0.150
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,100.000
|
$0.100
|
$0.247
|
$0.250
|
$0.160
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
35.000
|
$2.200
|
$5.150
|
$5.500
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
25.000
|
$1.700
|
$10.300
|
$11.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$9.500
|
$10.300
|
$11.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$1.000
|
$10.300
|
$11.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
3.000
|
$13.400
|
$10.300
|
$11.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
52.000
|
$2.200
|
$10.300
|
$11.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
8.000
|
$25.000
|
$25.750
|
$27.000
|
$160.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
8.000
|
$25.000
|
$25.750
|
$27.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$5.000
|
$25.750
|
$27.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
1.000
|
$1.800
|
$25.750
|
$27.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
15.000
|
$4.600
|
$25.750
|
$27.000
|
$16.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
100.000
|
$96.100
|
$150.000
|
$150.000
|
$140.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
15,000.000
|
$2.200
|
$1.350
|
$2.200
|
$4.500
|
|
|
SPOT MOWING
|
AC
|
100.000
|
$4.000
|
$36.000
|
$34.000
|
$58.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
10,800.000
|
$12.000
|
$3.000
|
$34.000
|
$46.700
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
10,098.000
|
$12.000
|
$3.000
|
$34.000
|
$46.700
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
200.000
|
$99.000
|
$150.000
|
$200.000
|
$260.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
50.000
|
$9.900
|
$20.000
|
$28.000
|
$36.500
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
12.000
|
$10,800.000
|
$5,500.000
|
$8,500.000
|
$11,825.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
12.000
|
$10,098.000
|
$5,500.000
|
$8,500.000
|
$10,990.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
1,000.000
|
$36.100
|
$1.000
|
$180.000
|
$36.500
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
20.000
|
$110.300
|
$325.000
|
$350.000
|
$440.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
100,000.000
|
$0.300
|
$0.250
|
$0.200
|
$0.070
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$2,808.000
|
$4,500.000
|
$4,900.000
|
$5,980.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$2,136.000
|
$3,500.000
|
$3,700.000
|
$4,550.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$2,808.000
|
$4,500.000
|
$4,900.000
|
$5,975.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$2,136.000
|
$3,500.000
|
$3,700.000
|
$4,550.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
12.000
|
$3,468.000
|
$4,500.000
|
$5,900.000
|
$7,385.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
12.000
|
$2,952.000
|
$4,000.000
|
$5,000.000
|
$6,285.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
12.000
|
$2,318.400
|
$4,500.000
|
$3,400.000
|
$4,290.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
12.000
|
$1,876.800
|
$4,000.000
|
$2,800.000
|
$3,475.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(1)
|
CYC
|
12.000
|
$456.000
|
$1,200.000
|
$800.000
|
$970.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(4)
|
CYC
|
12.000
|
$324.000
|
$850.000
|
$550.000
|
$670.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(6)
|
CYC
|
12.000
|
$216.000
|
$600.000
|
$370.000
|
$460.000
|
|
|
CLEAN/SWEEPING-DIRECT CONNECT-AREA(7)
|
CYC
|
12.000
|
$732.000
|
$2,000.000
|
$1,300.000
|
$1,560.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
10.000
|
$1,764.900
|
$2,000.000
|
$1,000.000
|
$2,050.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
15.000
|
$49.500
|
$200.000
|
$195.000
|
$170.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
15.000
|
$79.100
|
$200.000
|
$330.000
|
$205.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$109.900
|
$200.000
|
$330.000
|
$250.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$156.200
|
$200.000
|
$450.000
|
$340.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$238.900
|
$200.000
|
$530.000
|
$500.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$376.100
|
$200.000
|
$930.000
|
$1,100.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$484.200
|
$200.000
|
$950.000
|
$2,000.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
400.000
|
$80.000
|
$85.000
|
$75.000
|
$95.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
150.000
|
$3.300
|
$3.000
|
$2.200
|
$3.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
7,000.000
|
$4.100
|
$5.000
|
$3.300
|
$4.400
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
2,500.000
|
$5.000
|
$6.500
|
$3.850
|
$5.250
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
3,000.000
|
$5.800
|
$7.000
|
$4.400
|
$5.500
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
500.000
|
$7.600
|
$8.000
|
$5.000
|
$6.500
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
20.000
|
$8.600
|
$8.000
|
$5.500
|
$7.000
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
1,000.000
|
$10.600
|
$14.000
|
$8.300
|
$11.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
25.000
|
$8.000
|
$15.000
|
$13.300
|
$17.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
25.000
|
$9.800
|
$16.000
|
$16.500
|
$20.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
500.000
|
$12.800
|
$17.000
|
$17.500
|
$24.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
500.000
|
$17.100
|
$25.000
|
$22.100
|
$30.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
300.000
|
$22.600
|
$26.000
|
$24.000
|
$32.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
25.000
|
$66.000
|
$36.000
|
$36.000
|
$50.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
25.000
|
$4.500
|
$10.000
|
$10.000
|
$13.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
2,500.000
|
$14.000
|
$15.000
|
$15.500
|
$18.500
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
1.000
|
$20.400
|
$125.000
|
$100.000
|
$70.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
1.000
|
$21.500
|
$125.000
|
$100.000
|
$75.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
300.000
|
$2.000
|
$20.000
|
$6.000
|
$20.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
100.000
|
$36.800
|
$75.000
|
$38.000
|
$130.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
75.000
|
$33.900
|
$100.000
|
$41.000
|
$165.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
1.000
|
$136.900
|
$180.000
|
$230.000
|
$100.000
|
|
|
REALIGN POSTS
|
EA
|
150.000
|
$9.900
|
$40.000
|
$6.000
|
$40.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,500.000
|
$21.900
|
$25.000
|
$24.000
|
$30.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
200.000
|
$32.500
|
$55.000
|
$40.000
|
$160.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
1.000
|
$2,624.800
|
$3,000.000
|
$3,100.000
|
$3,200.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
40.000
|
$870.000
|
$1,000.000
|
$1,025.000
|
$1,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
25.000
|
$53.700
|
$100.000
|
$110.000
|
$450.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
20.000
|
$60.200
|
$250.000
|
$112.000
|
$470.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
20.000
|
$34.900
|
$200.000
|
$90.000
|
$460.000
|
|
|
REPLACE SGT STRUT
|
EA
|
15.000
|
$51.000
|
$126.000
|
$60.000
|
$440.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
1.000
|
$29.900
|
$50.000
|
$35.000
|
$65.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
3.000
|
$100.000
|
$90.000
|
$150.000
|
$100.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$9,312.500
|
$18,500.000
|
$21,500.000
|
$28,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
1.000
|
$19,083.400
|
$25,000.000
|
$42,000.000
|
$52,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$3,000.000
|
$7,295.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
1.000
|
$778.200
|
$4,300.000
|
$3,000.000
|
$8,750.000
|
|
|
REPAIR (CATCB - FRNT SECT)
|
EA
|
1.000
|
$484.400
|
$450.000
|
$800.000
|
$3,600.000
|
|
|
REPAIR (CATCB - REAR SECT)
|
EA
|
1.000
|
$362.000
|
$450.000
|
$800.000
|
$1,850.000
|
|
|
REPAIR (WIDE QUAD)
|
EA
|
1.000
|
$500.000
|
$1,350.000
|
$2,800.000
|
$1,800.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
4.000
|
$845.000
|
$900.000
|
$950.000
|
$1,920.000
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
3.000
|
$242.200
|
$315.000
|
$100.000
|
$1,050.000
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
2.000
|
$130.000
|
$225.000
|
$100.000
|
$1,050.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
2.000
|
$466.000
|
$450.000
|
$500.000
|
$1,300.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
2.000
|
$1,756.200
|
$1,800.000
|
$2,900.000
|
$3,100.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
4.000
|
$459.600
|
$2,000.000
|
$900.000
|
$1,900.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
4.000
|
$1,179.000
|
$2,600.000
|
$2,900.000
|
$3,700.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
1.000
|
$1,418.200
|
$1,500.000
|
$3,000.000
|
$2,900.000
|
|
|
REPAIR TAU II (N)
|
LF
|
35.000
|
$211.100
|
$250.000
|
$430.000
|
$420.000
|
|
|
REPAIR TAU II (W)
|
LF
|
5.000
|
$205.000
|
$180.000
|
$600.000
|
$730.000
|
|
|
REPAIR TAU II (W) (MISC HARDWARE)
|
EA
|
1.000
|
$2,700.000
|
$1,800.000
|
$3,000.000
|
$4,400.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
1.000
|
$2,571.500
|
$3,150.000
|
$4,000.000
|
$4,700.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
15.000
|
$111.000
|
$70.000
|
$130.000
|
$225.000
|
|
|
REPAIR (STL PIPE PED RAILW/PARAPET-PR2)
|
LF
|
15.000
|
$48.000
|
$90.000
|
$100.000
|
$520.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$100.000
|
$90.000
|
$90.000
|
$195.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
15.000
|
$750.000
|
$800.000
|
$1,000.000
|
$1,050.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$100.000
|
$250.000
|
$330.000
|
$490.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
200.000
|
$500.000
|
$320.000
|
$260.000
|
$232.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$50.800
|
$225.000
|
$60.000
|
$196.000
|
|
|
TMA (STATIONARY)
|
EA
|
200.000
|
$145.100
|
$200.000
|
$250.000
|
$385.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$52.700
|
$40.000
|
$49.000
|
$62.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
25.000
|
$4.500
|
$9.000
|
$3.500
|
$4.400
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
50.000
|
$65.300
|
$95.000
|
$57.000
|
$170.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
200.000
|
$52.900
|
$95.000
|
$46.000
|
$115.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
5.000
|
$63.000
|
$200.000
|
$100.000
|
$340.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
3.000
|
$30,666.700
|
$39,000.000
|
$35,000.000
|
$50,700.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
200.000
|
$78.100
|
$95.000
|
$35.000
|
$156.000
|
|
Totals: |
$2,780,553.750
|
$2,894,122.025
|
$3,921,302.500
|
$4,643,214.600
|