Show Job Controls
Bid Cobra

HARRIS SH0249 (6322-47-001)

Items: 52

County: HARRIS
Length: N/A
Highway: SH0249
District: HOUSTON
Control Number: 6322-47-001
DBE Goal: N/A
Project: RMC - 632247001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $347,520.48
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$347,520.48
$340,930.00
Over/Under Est: -1.9% -$6,590.48
Over/Under Est: 8.64% $30,029.52
Amt Left: 10.74% $36,620.00
Over/Under Est: 51.43% $178,729.52
Amt Left: 54.36% $185,320.00
Delta: -39.39% -$148,700.00

Bid Items & Bid Tabulations

52 Total 0 of 52
HARRIS  |  SH0249  |  HOUSTON  |  6322-47-001  |  03/07/2018  |  $347,520.48  |  RMC - 632247001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
REMOVING CONC (RIPRAP)
SY 100.000 $28.370 $5.000 $10.000 $25.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $95.000 $85.000 $100.000 $250.000
CONC STR REPAIR (STANDARD)
SF 150.000 $95.000 $85.000 $110.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $608.120 $300.000 $370.000 $475.000
MOBILIZATION (CALLOUT)
EA 24.000 $728.810 $225.000 $100.000 $2,500.000
MOBILIZATION (EMERGENCY)
EA 4.000 $750.000 $350.000 $1,200.000 $7,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 180.000 $40.000 $20.000 $20.000 $65.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 180.000 $8.240 $5.000 $4.000 $20.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 180.000 $24.820 $1.000 $20.000 $40.000
CONC CURB (TY II)
LF 20.000 $10.300 $5.000 $5.000 $6.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,383.420 $2,000.000 $2,250.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,140.160 $1,000.000 $1,100.000 $1,750.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $2.000 $1.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $172.450 $50.000 $5.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,100.000 $1,000.000 $1,500.000 $4,500.000
CHAIN LINK FENCE (REPAIR) (6')
LF 50.000 $18.030 $18.000 $20.000 $25.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $5.000 $5.000 $5.000 $10.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 20.000 $10.000 $20.000 $10.000 $85.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 15.000 $10.000 $20.000 $10.000 $95.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $14.400 $15.000 $15.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 35.000 $25.000 $24.000 $25.000 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $25.000 $26.000 $25.000 $27.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $27.000 $15.000 $20.000 $50.000
RAISE RAIL ELEMENT
LF 50.000 $12.000 $10.000 $5.000 $10.000
REALIGN EXISTING RAIL
LF 500.000 $7.150 $3.000 $8.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 30.000 $38.740 $20.000 $38.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $40.550 $55.000 $48.000 $50.000
REALIGN POSTS
EA 15.000 $9.590 $10.000 $10.000 $7.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $20.000 $22.000 $19.500 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $55.850 $60.000 $48.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $26.000 $10.000 $75.000 $55.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 1.000 $2,723.200 $3,000.000 $2,600.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 40.000 $822.350 $920.000 $1,050.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $100.000 $100.000 $175.000 $150.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $76.820 $95.000 $115.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $75.000 $75.000 $90.000 $95.000
REPLACE SGT STRUT
EA 20.000 $68.600 $80.000 $75.000 $90.000
REPLACE SGT OBJECT MARKER
EA 5.000 $30.000 $30.000 $30.000 $35.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $78.130 $75.000 $110.000 $75.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $19,500.000 $18,000.000 $19,500.000 $3,200.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $2,656.240 $28,000.000 $31,000.000 $4,500.000
REPAIR (TRACC)
LF 25.000 $100.000 $95.000 $125.000 $20.000
REPAIR REACT (N) (MISC HARDWARE)
EA 20.000 $989.030 $1,000.000 $1,000.000 $1,200.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $2,508.230 $2,300.000 $3,100.000 $3,100.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,000.000 $950.000 $1,400.000 $1,500.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $1,633.330 $950.000 $2,500.000 $2,950.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 10.000 $1,100.000 $1,000.000 $1,200.000 $750.000
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $2,385.260 $2,600.000 $2,900.000 $4,200.000
REPAIR REACT (W) (DIAPHRAGM)
EA 2.000 $500.000 $450.000 $500.000 $6,500.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 2.000 $1,533.330 $1,000.000 $1,500.000 $5,500.000
CONCRETE RAIL REPAIR (MISC)
LF 50.000 $156.340 $90.000 $95.000 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $100.000 $90.000 $90.000 $125.000
Totals: $347,520.480 $340,930.000 $377,550.000 $526,250.000