Bid Cobra

HARRIS IH0610 (6301-89-001)

Items: 27

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6301-89-001
DBE Goal: N/A
Project: RMC - 630189001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $668,916.80
Date: 11/03/2016 (9 years ago)
Contract Number: N/A
Type: COMMUNICATION CABLE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$668,916.80
$802,175.00
Over/Under Est: 19.92% $133,258.20

Bid Items & Bid Tabulations

27 Total 0 of 27
HARRIS  |  IH0610  |  HOUSTON  |  6301-89-001  |  11/03/2016  |  $668,916.80  |  RMC - 630189001  |  COMMUNICATION CABLE  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
MOBILIZATION (CALLOUT)
EA 26.000 $1,050.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 2.000 $429.500 $2,500.000
GROUND BOX TY D (162922)W/APRON
EA 15.000 $776.680 $875.000
REMOVE GROUND BOX
EA 15.000 $183.750 $230.000
INSTALL UNDERGROUND CONDUIT
LF 3,000.000 $13.790 $10.000
COMM CABLE (AERIAL)(22 AWG)(25 PAIR)
LF 27,000.000 $2.180 $3.850
COMM CABLE (UNDRGRND)(22 AWG)(25 PAIR)
LF 27,000.000 $2.180 $2.850
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 2,000.000 $3.660 $5.250
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 20,000.000 $5.780 $5.500
FIBER OPTIC PIGTAIL (12 FIBER)
LF 30.000 $12.660 $95.000
FIBER OPTIC SPLICE ENCLOSURE
EA 25.000 $4,309.770 $3,850.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 20.000 $2,172.000 $1,700.000
MULTI-DUCT CONDUIT (PVC)(BORED)
LF 100.000 $27.850 $40.000
CONDUIT (PREPARE)
LF 5,000.000 $2.280 $4.000
COAXIAL CABLE
LF 3,000.000 $3.720 $3.950
ANTENNA (OMNI-DIRECTIONAL)
EA 20.000 $439.180 $795.000
ANTENNA (UNI-DIRECTIONAL)
EA 30.000 $468.540 $800.000
ITS RADIO (SNGL)(900 MHZ)-C-U
EA 15.000 $3,645.360 $3,100.000
ETHERNET CABLE AND CONNECTORS
LF 5,000.000 $2.090 $2.100
WIRELESS ETHERNET RADIO (LOCAL) LINK
EA 10.000 $3,654.710 $4,150.000
WIRE SPLICES
EA 20.000 $15.750 $75.000
OVERHEAD CABLE PLACEMENT
LF 1,000.000 $2.100 $3.850
JACKING AND BORING
LF 2,000.000 $5.250 $12.000
TRENCHING AND INSTALLATION OF CONDUIT
LF 3,000.000 $4.200 $10.000
REMOVE EXISTING CABLES (FIBER)
LF 1,000.000 $1.160 $1.500
REMOVE EXISTING CABLES (POWER)
LF 1,000.000 $0.580 $1.500
REMOVE EXISTING CABLES (COMMUNICATION)
LF 27,000.000 $0.580 $1.500
Totals: $668,916.800 $802,175.000