Show Job Controls
Bid Cobra

HARRIS SH 99 (3510-05-042)

Items: 55

County: HARRIS
Length: N/A
Highway: SH 99
District: HOUSTON
Control Number: 3510-05-042
DBE Goal: N/A
Project: STP 2019(951)
Guaranty: N/A
Time: 53 WORKING DAYS
Engineer's Estimate: $204,058.50
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: PAVEMENT WIDENING, STORM SEWER, AND PAV MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$204,058.50
1
$183,439.07
Over/Under Est: -10.1% -$20,619.43
Over/Under Est: 71.69% $146,292.00
Amt Left: 90.99% $166,911.43

Bid Items & Bid Tabulations

55 Total 0 of 55
HARRIS  |  SH 99  |  HOUSTON  |  3510-05-042  |  05/08/2019  |  $204,058.50  |  STP 2019(951)  |  PAVMT WIDENING, STORM SEWER, AND PAV...  |  53 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
MAIN LANE INDUSTRIES LTD.
REMOVING CONC (PAV)
SY 145.000 $15.000 $88.000 $20.000
REMOVING CONC (RIPRAP)
SY 33.000 $30.000 $13.000 $20.000
REMOVING CONC (CURB)
LF 801.000 $5.000 $9.000 $5.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 27.000 $15.000 $10.000 $20.000
RMV TRT BASE & ASPH PAV (3"-4")
SY 165.000 $10.000 $18.020 $1.000
EXCAVATION (ROADWAY)
CY 57.000 $22.000 $35.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 24.000 $50.000 $122.000 $50.000
BLOCK SODDING
SY 66.000 $15.000 $5.000 $10.000
FERTILIZER
AC 0.010 $2,500.000 $25,000.000 $2,000.000
VEGETATIVE WATERING
MG 1.680 $200.000 $200.000 $100.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 232.000 $180.000 $155.000 $370.000
STRUCT EXCAV
CY 59.000 $20.000 $25.200 $50.000
CEM STABIL BKFL
CY 16.000 $220.000 $55.000 $50.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 39.000 $220.000 $55.000 $50.000
TRENCH EXCAVATION PROTECTION
LF 56.000 $10.000 $25.000 $5.000
CL C CONC (COLLAR)
EA 4.000 $500.000 $500.000 $4,000.000
RIPRAP (CONC)(4 IN)
CY 10.000 $500.000 $350.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 23.000 $200.000 $160.000 $400.000
INLET (COMPL)(TY C)(MOD)
EA 3.000 $4,500.000 $4,000.000 $15,000.000
REMOV STR (INLET)
EA 3.000 $1,200.000 $200.000 $1,500.000
REMOV STR (PIPE)
LF 22.000 $60.000 $25.000 $100.000
MOBILIZATION
LS 1.000 $15,701.000 $20,000.000 $35,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $800.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 737.000 $5.000 $2.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 737.000 $2.000 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 42.000 $10.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 42.000 $3.500 $10.000 $2.000
REMOVE AND RELAY PAVERS
SY 122.000 $75.000 $45.000 $200.000
CONC CURB (MONO) (TY II)
LF 625.000 $15.000 $10.000 $10.000
CONC CURB (DOWEL)
LF 176.000 $25.000 $21.000 $15.000
CURB RAMPS (TY 1)
EA 4.000 $2,500.000 $400.000 $5,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $800.000 $147.790 $500.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $300.000 $2,336.840 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $365.000 $378.950 $347.000
REFL PAV MRKR TY I-C
EA 29.000 $5.000 $12.630 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 48.000 $1.000 $2.530 $0.430
ELIM EXT PAV MRK & MRKS (6")
LF 395.000 $1.500 $2.530 $0.860
ELIM EXT PAV MRK & MRKS (8")
LF 667.000 $2.000 $2.530 $0.920
ELIM EXT PAV MRK & MRKS (12")
LF 402.000 $2.000 $2.530 $1.520
ELIM EXT PAV MRK & MRKS (24")
LF 107.000 $3.500 $5.050 $3.040
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $100.000 $94.740 $35.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $100.000 $94.740 $35.000
PAV SURF PREP FOR MRK (6")
LF 440.000 $0.100 $0.630 $0.030
PAV SURF PREP FOR MRK (8")
LF 685.000 $0.100 $1.580 $0.040
PAV SURF PREP FOR MRK (12")
LF 1,210.000 $1.000 $2.530 $0.150
PAV SURF PREP FOR MRK (24")
LF 107.000 $1.500 $2.530 $0.300
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $20.000 $63.160 $7.500
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $20.000 $63.160 $7.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 53.000 $150.000 $147.790 $75.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 300.000 $2.500 $1.260 $0.950
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 685.000 $2.500 $2.530 $1.650
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,210.000 $4.000 $6.320 $3.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 107.000 $9.000 $12.630 $7.250
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 140.000 $5.250 $1.260 $3.000
TMA (STATIONARY)
DAY 40.000 $210.000 $100.000 $350.000
Totals: $204,058.500 $183,439.070 $350,350.500