HARRIS SL 8 (3256-03-094)

Items: 160

County: HARRIS
Length: N/A
Highway: SL 8
District: HOUSTON
Control Number: 3256-03-094
DBE Goal: N/A
Project: C 3256-3-94
Guaranty: N/A
Time: 987 WORKING DAYS
Engineer's Estimate: $25,182,257.03
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: RECONSTRUCTION OF FRONTAGE ROADS WITH STORM SEWER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$25,182,257.03
$29,881,212.69
Over/Under Est: 18.66% $4,698,955.66
$30,365,923.79
Over/Under Est: 20.58% $5,183,666.76
Amt Left: 1.62% $484,711.10
Over/Under Est: 23.07% $5,809,475.46
Amt Left: 3.72% $1,110,519.80
Delta: -2.06% -$625,808.70
Over/Under Est: 24.15% $6,081,357.27
Amt Left: 4.63% $1,382,401.61
Delta: -0.88% -$271,881.81
$32,387,095.75
Over/Under Est: 28.61% $7,204,838.72
Amt Left: 8.39% $2,505,883.06
Delta: -3.59% -$1,123,481.45
Over/Under Est: 38.97% $9,813,205.60
Amt Left: 17.12% $5,114,249.94
Delta: -8.05% -$2,608,366.88
Over/Under Est: 52.92% $13,326,713.83
Amt Left: 28.87% $8,627,758.17
Delta: -10.04% -$3,513,508.23
Subcontractor Percentage Amount
GMJ PAVING CO. 3.30% $1,027,621.68
SOUTHERN EROSION, LLC 1.90% $591,660.97
JASSO'S SAWING & SEALING 1.80% $560,520.92
HOUSTON CRUSHED CONCRETE, L.L.C. 1.58% $492,012.81
TRAFFIC SIGNS & LINES, LLC 1.29% $401,706.66
QUALITY TURF FARMS, L.C. 1.04% $323,856.53
A&J REBAR LLC 0.89% $277,146.45
THIRD COAST SERVICES LLC 0.70% $217,980.36
PROFESSIONAL TRAFFIC CONTROL LLC 0.54% $168,156.28
BUYERS BARRICADES HOUSTON, LLC 0.50% $155,700.26
CURB PLANET INC. 0.22% $68,508.11
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.15% $46,710.08
ANDERSON DUMP TRUCKING, INC. 0.05% $15,570.03
CREACOM, INC. 0.02% $6,228.01
Total: 13.98% $4,353,379.15

Bid Items & Bid Tabulations

160 Total 0 of 160
HARRIS  |  SL 8  |  HOUSTON  |  3256-03-094  |  12/01/2021  |  $25,182,257.03  |  C 3256-3-94  |  RECON OF FRONTAGE ROADS WITH STORM S...  |  987 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
COPASA INC
SER CONSTRUCTION PARTNERS, LLC
R CONSTRUCTION CIVIL, LLC
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
JAMES CONSTRUCTION GROUP, LLC
REMOVING CONC (PAV)
SY 148,881.000 $4.000 $4.980 $2.500 $9.000 $5.000 $37.000 $8.640 $6.500
REMOVING CONC (RIPRAP)
SY 1,924.000 $4.400 $17.000 $5.870 $3.800 $7.000 $3.000 $18.500 $5.870
REMOVING CONC (DRIVEWAYS)
SY 9,118.000 $4.200 $17.640 $5.080 $7.200 $5.000 $6.000 $18.000 $7.510
REMOVING CONC (CURB)
LF 60.000 $3.000 $20.000 $7.760 $11.200 $4.500 $20.000 $45.000 $7.760
REMOVING CONC (APPR SLAB)
SY 1,397.000 $15.000 $17.000 $5.080 $4.700 $5.000 $37.000 $25.000 $6.520
REMOVING CONC (SIDEWALK OR RAMP)
SY 6,360.000 $5.900 $11.200 $5.870 $3.400 $5.000 $4.000 $12.000 $5.870
REMOVING STAB BASE AND ASPH PAV (7")
SY 161,557.000 $4.000 $4.630 $2.000 $2.400 $3.000 $5.000 $8.000 $3.000
REMOVING STAB BASE & ASPH PAV (1.5")
SY 565.000 $5.000 $4.070 $3.480 $4.100 $5.000 $2.000 $5.000 $3.480
EXCAVATION (ROADWAY)
CY 7,837.000 $7.300 $8.140 $14.000 $6.800 $10.000 $13.000 $9.890 $22.160
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 12,668.000 $12.000 $10.000 $22.000 $18.000 $8.000 $6.500 $7.370 $8.430
BLOCK SODDING
SY 67,791.000 $2.670 $2.960 $4.110 $4.600 $4.000 $2.930 $4.100 $4.100
FERTILIZER
AC 14.010 $650.000 $642.140 $916.170 $787.500 $700.000 $600.000 $780.000 $780.000
VEGETATIVE WATERING
MG 1,680.800 $12.500 $5.870 $29.270 $1.000 $18.000 $27.000 $12.000 $30.950
LIME TRT (EXST MATL) (6")
SY 134,843.000 $1.750 $2.850 $6.000 $3.000 $3.000 $2.300 $2.950 $5.780
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 1,821.000 $175.400 $191.000 $191.000 $200.600 $190.000 $191.000 $190.000 $209.240
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 134,843.000 $6.500 $7.340 $13.290 $14.200 $10.000 $5.000 $10.400 $20.350
ASPHALT STAB BASE (GR 4)(PG 64)
TON 7,417.000 $68.000 $95.380 $100.000 $82.400 $95.000 $105.000 $100.000 $132.500
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 47.000 $200.000 $171.240 $107.910 $208.400 $200.000 $175.000 $170.000 $263.000
TACK COAT
GAL 63.000 $5.000 $2.680 $4.000 $13.300 $10.000 $2.500 $2.500 $2.520
CONC PVMT (CONT REINF - CRCP) (10")
SY 122,199.000 $47.200 $66.000 $68.000 $67.500 $77.000 $52.000 $64.000 $97.600
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 26,682.000 $86.000 $135.000 $96.000 $112.500 $100.000 $68.000 $165.000 $130.850
STRUCT EXCAV
CY 25,372.000 $2.360 $3.000 $7.520 $5.400 $12.000 $5.000 $8.890 $11.600
CEM STABIL BKFL
CY 17,140.000 $36.210 $40.980 $40.070 $47.800 $40.000 $44.000 $41.110 $43.470
CUT & RESTORE CONC PAVING
SY 398.000 $180.000 $250.000 $219.130 $189.300 $175.000 $275.000 $224.580 $138.090
CEMENT STAB BACKFILL (INLET OR MH)
CY 2,541.000 $40.000 $40.980 $40.070 $46.700 $40.000 $45.000 $41.110 $42.980
FLOWABLE BACKFILL
CY 3.000 $500.000 $130.090 $300.000 $302.900 $750.000 $2,000.000 $304.560 $137.480
TRENCH EXCAVATION PROTECTION
LF 27,459.000 $1.580 $1.000 $1.840 $0.100 $1.000 $1.200 $2.920 $1.120
CL HES CONC (APPROACH SLAB)
CY 505.000 $500.000 $510.240 $450.000 $498.300 $500.000 $425.000 $493.480 $584.150
RIPRAP (CONC)(4 IN)
CY 214.000 $400.000 $404.990 $391.020 $328.600 $500.000 $392.250 $441.300 $429.420
RIPRAP (MOW STRIP)(4 IN)
CY 17.000 $400.000 $742.840 $436.660 $328.900 $500.000 $492.650 $1,034.070 $730.260
CONC BOX CULV (3 FT X 2 FT)
LF 521.000 $154.700 $204.720 $229.950 $206.700 $250.000 $200.000 $202.600 $230.000
CONC BOX CULV (4 FT X 2 FT)
LF 146.000 $169.760 $209.120 $245.250 $224.400 $265.000 $200.000 $215.800 $250.000
CONC BOX CULV (5 FT X 2 FT)
LF 830.000 $210.000 $289.850 $316.320 $293.700 $325.000 $270.000 $290.090 $330.000
CONC BOX CULV (5 FT X 3 FT)
LF 1,037.000 $285.000 $283.330 $325.260 $306.300 $350.000 $290.000 $295.440 $340.000
RC PIPE (CL III)(18 IN)
LF 266.000 $64.190 $133.320 $87.670 $87.100 $70.000 $90.000 $99.520 $125.000
RC PIPE (CL III)(24 IN)
LF 18,042.000 $67.270 $95.000 $81.720 $78.300 $79.000 $75.000 $70.520 $88.000
RC PIPE (CL III)(30 IN)
LF 3,186.000 $83.600 $109.580 $96.160 $92.000 $90.000 $80.000 $90.540 $105.000
RC PIPE (CL III)(36 IN)
LF 1,948.000 $123.190 $126.830 $128.500 $123.200 $118.000 $110.000 $111.960 $125.000
RC PIPE (CL III)(42 IN)
LF 1,629.000 $113.700 $142.310 $160.440 $155.100 $145.000 $140.000 $148.210 $160.000
RC PIPE (CL III)(48 IN)
LF 1,287.000 $148.680 $152.010 $189.200 $180.700 $180.000 $170.000 $177.030 $185.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $4,546.060 $7,560.260 $4,185.300 $7,037.600 $7,500.000 $6,000.000 $6,950.370 $4,789.450
INLET (COMPL)(PCU)(3FT)(NONE)
EA 6.000 $3,800.000 $4,778.770 $3,496.180 $4,965.700 $5,500.000 $9,200.000 $8,615.370 $5,654.040
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 9.000 $4,200.000 $4,595.940 $3,824.430 $4,947.400 $6,000.000 $9,000.000 $8,425.370 $6,207.250
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 6.000 $6,115.410 $4,586.320 $3,824.430 $5,027.400 $6,000.000 $8,300.000 $8,415.370 $6,207.250
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 7.000 $5,146.710 $4,778.770 $4,462.380 $5,219.000 $6,700.000 $7,900.000 $8,615.370 $6,935.730
INLET (COMPL)(PCU)(4FT)(NONE)
EA 1.000 $7,500.000 $5,105.940 $5,628.300 $5,335.300 $6,500.000 $8,000.000 $8,968.890 $6,820.720
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 1.000 $5,500.000 $5,033.770 $5,891.550 $5,437.700 $7,000.000 $15,000.000 $8,893.890 $7,264.380
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 1.000 $7,485.000 $5,308.020 $5,891.550 $5,737.000 $7,000.000 $9,500.000 $9,178.890 $7,264.380
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 2.000 $6,129.580 $5,538.970 $5,679.400 $6,061.100 $8,500.000 $9,000.000 $9,418.890 $8,726.860
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 2.000 $6,000.000 $7,381.720 $5,656.650 $8,024.900 $8,500.000 $9,500.000 $11,347.410 $9,008.400
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 2.000 $6,000.000 $6,746.620 $6,092.150 $7,331.900 $8,500.000 $9,500.000 $10,687.410 $9,008.400
INLET (COMPL)(PCU)(5FT)(BOTH)
EA 4.000 $6,500.000 $7,088.230 $5,656.650 $7,704.700 $9,000.000 $10,500.000 $11,042.410 $9,741.650
INLET (COMPL)(PCU)(6FT)(RIGHT)
EA 1.000 $7,000.000 $7,574.170 $7,191.550 $8,260.100 $9,000.000 $12,000.000 $11,560.930 $9,773.850
INLET (COMPL)(TY AZ)
EA 2.000 $5,000.000 $4,677.730 $4,311.150 $5,713.000 $7,000.000 $5,900.000 $7,422.610 $6,740.770
MANH (COMPL)(TY A)
EA 17.000 $6,266.950 $8,666.700 $5,490.330 $8,574.700 $6,500.000 $5,900.000 $9,449.720 $5,622.960
MANH (COMPL)(TY B)
EA 1.000 $5,292.030 $12,599.080 $10,212.600 $14,900.000 $12,000.000 $11,000.000 $16,396.010 $11,225.350
INLET (COMPL)(CURB)(TY C1)
EA 253.000 $6,065.720 $5,880.570 $4,355.460 $5,662.200 $6,400.000 $6,000.000 $6,795.690 $5,884.080
INLET (COMPL)(TY AZ2G)
EA 1.000 $9,158.530 $5,096.320 $7,919.550 $7,061.300 $11,000.000 $11,000.000 $9,534.930 $10,648.570
INLET (COMPL) (EXT) (TY CI)
EA 302.000 $1,404.980 $1,400.000 $1,174.820 $983.300 $1,200.000 $1,300.000 $1,383.530 $1,384.600
ADJUSTING MANHOLES
EA 39.000 $406.440 $271.360 $612.110 $343.900 $750.000 $1,200.000 $1,805.410 $1,530.500
ADJUSTING MANHOLES(CAP)
EA 9.000 $898.000 $443.440 $2,342.200 $196.900 $3,000.000 $1,200.000 $3,290.410 $4,729.250
REMOV STR (INLET)
EA 81.000 $400.000 $617.480 $550.340 $191.600 $500.000 $500.000 $1,302.520 $433.180
REMOV STR (MANHOLE)
EA 5.000 $500.000 $934.760 $883.120 $228.400 $900.000 $500.000 $1,743.560 $701.750
REMOV STR (PIPE)
LF 4,021.000 $12.870 $41.000 $17.680 $13.700 $15.000 $18.000 $41.350 $29.900
MOBILIZATION
LS 1.000 $2,238,327.000 $2,800,000.000 $3,340,000.000 $3,025,000.000 $3,000,000.000 $3,238,709.570 $3,375,000.000 $3,834,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $12,500.000 $2,500.000 $1,000.000 $24,405.000 $8,500.000 $25,000.000 $30,000.000 $15,351.920
TEMP SEDMT CONT FENCE (INSTALL)
LF 79,849.000 $2.300 $1.340 $4.230 $2.100 $2.000 $2.000 $3.580 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 79,849.000 $0.610 $0.430 $0.590 $0.600 $0.500 $0.490 $0.490 $0.490
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,987.000 $4.000 $2.570 $3.730 $3.200 $5.000 $3.580 $3.580 $3.580
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 30.000 $4.000 $2.570 $5.010 $4.100 $5.000 $8.000 $8.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,017.000 $1.000 $0.430 $0.590 $1.700 $1.000 $1.000 $1.000 $1.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 38,040.000 $31.800 $0.010 $9.100 $0.100 $8.000 $5.000 $12.000 $6.320
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 900.000 $37.480 $0.010 $9.100 $0.100 $10.000 $8.000 $35.000 $7.190
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 780.000 $4.800 $0.010 $9.880 $8.000 $7.000 $8.000 $22.000 $9.890
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 480.000 $10.000 $0.010 $9.880 $8.000 $9.000 $6.000 $35.000 $7.610
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 38,040.000 $6.000 $0.010 $9.100 $0.100 $8.000 $5.000 $8.000 $5.940
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 900.000 $7.000 $0.010 $9.100 $0.100 $10.000 $7.000 $12.000 $5.770
CONC CURB (TY II)
LF 67,735.000 $3.010 $5.310 $3.540 $3.300 $3.500 $12.000 $7.980 $2.650
DRIVEWAYS (CONC) (FAST TRACK)
SY 9,118.000 $63.660 $86.000 $84.640 $72.600 $85.000 $73.540 $65.540 $108.420
CONC SIDEWALKS (4")
SY 18,716.000 $50.500 $60.000 $55.380 $61.500 $51.000 $44.300 $46.830 $47.240
CURB RAMPS (TY 1)
EA 10.000 $1,745.730 $1,312.490 $1,918.650 $1,179.200 $1,900.000 $2,115.010 $2,122.290 $1,928.700
CURB RAMPS (TY 5)
EA 6.000 $2,451.390 $1,312.490 $2,669.950 $2,087.800 $2,300.000 $2,215.010 $4,418.790 $1,928.710
CURB RAMPS (TY 7)
EA 41.000 $1,918.830 $1,312.490 $2,394.610 $1,457.200 $1,900.000 $2,315.010 $1,697.970 $1,928.700
CURB RAMPS (TY 21)
EA 1.000 $2,800.000 $1,312.490 $3,052.110 $2,939.900 $2,300.000 $2,315.010 $1,212.060 $1,988.010
MTL W-BEAM GD FEN (TIM POST)
LF 563.000 $20.000 $23.440 $25.350 $24.000 $46.000 $22.810 $22.810 $25.350
TERMINAL ANCHOR SECTION
EA 1.000 $2,100.000 $749.050 $1,150.000 $1,428.000 $1,700.000 $1,360.000 $1,360.000 $1,150.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $2,025.870 $2,597.750 $1,850.000 $1,921.500 $2,500.000 $1,830.000 $1,830.000 $1,850.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,320.000 $995.230 $950.000 $903.000 $1,100.000 $860.000 $860.000 $950.000
SHORT RADIUS
LF 13.000 $24.000 $65.870 $70.000 $35.700 $85.000 $34.000 $34.000 $70.000
REMOVE METAL BEAM GUARD FENCE
LF 620.000 $4.000 $2.330 $1.000 $1.900 $5.000 $1.770 $1.770 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $301.740 $187.380 $175.000 $256.200 $500.000 $244.000 $244.000 $175.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $321.890 $207.350 $210.000 $256.200 $500.000 $244.000 $244.000 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,583.000 $3,340.840 $3,150.000 $3,230.900 $3,300.000 $3,077.000 $3,077.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $380.760 $229.730 $300.000 $256.200 $500.000 $244.000 $244.000 $300.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $20,070.000 $7,398.020 $1,800.000 $1,674.800 $10,000.000 $2,500.000 $2,500.000 $1,800.000
CONDT (PVC) (SCH 80) (2")
LF 425.000 $8.250 $17.290 $11.000 $17.000 $16.000 $16.160 $11.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,965.000 $15.250 $19.000 $14.000 $19.500 $19.000 $18.580 $14.000 $14.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 10.000 $27.000 $25.260 $21.000 $24.800 $25.000 $23.600 $21.000 $21.000
CONDT (RM) (2")
LF 635.000 $22.250 $28.890 $29.000 $28.300 $30.000 $26.990 $29.000 $29.000
ELEC CONDR (NO.6) BARE
LF 3,945.000 $1.250 $1.770 $1.800 $1.700 $1.600 $1.650 $1.800 $1.800
GROUND BOX TY D (162922)
EA 9.000 $420.000 $1,126.630 $1,000.000 $1,105.300 $1,100.000 $1,052.700 $1,000.000 $1,000.000
ZINC-COAT STL WIRE STRAND (1/4")
LF 625.000 $3.000 $1.440 $3.050 $1.400 $1.300 $1.350 $3.050 $3.050
ZINC-COAT STL WIRE STRAND (3/8")
LF 625.000 $4.000 $1.560 $3.500 $1.500 $1.500 $1.460 $3.500 $3.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $500.000 $486.740 $685.000 $498.800 $550.000 $475.000 $475.000 $685.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 85.000 $600.000 $524.590 $630.000 $598.500 $650.000 $570.000 $570.000 $630.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 13.000 $981.550 $433.600 $1,100.000 $1,226.400 $1,300.000 $1,168.000 $1,168.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 128.000 $87.010 $84.790 $115.000 $47.300 $100.000 $45.000 $45.000 $115.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 36,189.000 $0.200 $0.370 $0.240 $0.300 $0.300 $0.300 $0.350 $0.300
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,600.000 $0.660 $1.020 $0.980 $1.100 $1.000 $1.000 $0.950 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 109,449.000 $0.620 $0.680 $0.820 $0.800 $1.000 $1.000 $0.650 $1.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 40.000 $2.000 $2.140 $0.870 $1.600 $2.500 $2.500 $2.000 $2.500
WK ZN PAV MRK REMOV (W)8"(LNDP)
LF 30.000 $2.010 $3.750 $1.750 $1.600 $5.000 $5.000 $3.500 $5.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,635.000 $1.190 $1.340 $1.570 $1.600 $2.000 $2.000 $1.250 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 912.000 $5.500 $8.560 $5.470 $5.300 $6.000 $6.000 $8.000 $6.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 46.000 $200.000 $133.780 $181.280 $183.800 $220.000 $220.000 $125.000 $220.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 52.000 $200.000 $187.290 $279.590 $288.800 $275.000 $275.000 $175.000 $275.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $200.000 $187.290 $198.900 $210.000 $250.000 $250.000 $175.000 $250.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 58,179.000 $0.670 $0.680 $0.820 $0.800 $1.000 $1.000 $0.650 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $201.800 $214.050 $184.060 $194.300 $250.000 $250.000 $200.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 9.000 $410.680 $260.000 $340.640 $341.300 $350.000 $350.000 $250.000 $350.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 11.000 $450.000 $278.260 $312.220 $341.300 $350.000 $350.000 $260.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 25.000 $300.000 $240.800 $223.710 $236.300 $300.000 $275.000 $225.000 $275.000
REFL PAV MRKR TY I-C
EA 7.000 $4.180 $5.350 $4.010 $4.200 $5.000 $5.000 $5.000 $5.000
REFL PAV MRKR TY II-C-R
EA 926.000 $4.000 $5.350 $4.130 $4.200 $5.000 $5.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 22,304.000 $0.310 $0.270 $0.240 $0.200 $0.500 $0.500 $0.250 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 448.000 $0.580 $0.540 $0.490 $0.500 $1.000 $1.000 $0.500 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 304.000 $1.000 $5.350 $1.660 $1.600 $2.000 $2.000 $5.000 $2.000
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 128,518.000 $0.120 $0.270 $0.050 $0.100 $0.100 $0.100 $0.250 $0.100
PAV SURF PREP FOR MRK (BLAST CLN)(8")
LF 10,389.000 $0.150 $0.540 $0.250 $0.300 $0.200 $0.200 $0.500 $0.200
PAV SURF PREP FOR MRK (BLAST CLN)(12")
LF 2,788.000 $0.180 $2.140 $1.000 $1.100 $1.000 $1.000 $2.000 $1.000
PAV SURF PREP FOR MRK (BLAST CLN)(24")
LF 956.000 $0.400 $4.280 $2.000 $2.100 $2.000 $2.000 $4.000 $2.000
PV SURF PREP FOR MRK (BLST CLN)(ARRWS)
EA 22.000 $10.000 $90.970 $42.000 $42.000 $45.000 $40.000 $85.000 $40.000
PV SURF PREP MRKS (BLST CLN)(DBL ARW)
EA 9.000 $15.000 $101.670 $42.000 $42.000 $45.000 $40.000 $95.000 $40.000
PV SURF PRP FOR MRK (BLST CLN)(WORDS)
EA 25.000 $15.000 $90.970 $42.000 $42.000 $45.000 $40.000 $85.000 $40.000
VEH SIG SEC (12")LED(GRN)
EA 32.000 $180.000 $260.000 $245.000 $269.300 $250.000 $256.520 $245.000 $245.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $180.000 $260.000 $245.000 $269.300 $250.000 $256.520 $245.000 $245.000
VEH SIG SEC (12")LED(YEL)
EA 32.000 $180.000 $260.000 $245.000 $269.300 $250.000 $256.520 $245.000 $245.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $180.000 $260.000 $245.000 $269.300 $250.000 $256.520 $245.000 $245.000
VEH SIG SEC (12")LED(RED)
EA 37.000 $180.000 $260.000 $245.000 $269.300 $250.000 $256.520 $245.000 $245.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 79.000 $76.500 $66.030 $115.000 $64.800 $125.000 $61.710 $115.000 $115.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 15.000 $92.500 $85.470 $125.000 $83.900 $100.000 $79.860 $125.000 $125.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 8.000 $108.500 $102.300 $135.000 $100.400 $100.000 $95.590 $135.000 $135.000
REMOVAL OF SIGNAL HEAD ASSM
EA 32.000 $120.000 $85.620 $45.000 $84.000 $50.000 $80.000 $45.000 $45.000
INSTALL OF LUMINAIRE MAST ARMS
EA 2.000 $480.000 $481.600 $1,575.000 $472.500 $2,000.000 $450.000 $1,575.000 $1,575.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 24.000 $155.000 $259.000 $90.000 $254.100 $95.000 $242.000 $90.000 $90.000
STRIP MOWING
AC 6.410 $50.000 $1,159.740 $3,000.000 $293.400 $700.000 $1,422.080 $1,500.000 $1,458.870
LITTER REMOVAL
AC 6.410 $120.000 $230.730 $6,000.000 $349.800 $200.000 $1,372.660 $1,500.000 $1,299.990
DEBRIS REMOVAL (FRONTAGE ROADS)
MI 4.090 $500.000 $29.580 $15,000.000 $548.200 $1,000.000 $1,198.690 $2,500.000 $1,823.560
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 4.090 $1,000.000 $24.650 $7,500.000 $506.600 $2,000.000 $2,220.890 $2,500.000 $1,507.030
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 360.000 $82.000 $250.000 $62.450 $94.500 $80.000 $216.500 $200.000 $182.580
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 268.000 $1.000 $0.510 $0.430 $0.400 $0.700 $0.600 $0.500 $0.600
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 64,125.000 $0.790 $0.510 $0.510 $0.400 $0.700 $0.600 $0.500 $0.600
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 7,292.000 $1.750 $0.780 $0.880 $0.900 $1.250 $1.200 $0.750 $1.200
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,788.000 $3.840 $3.210 $2.850 $2.600 $3.000 $3.000 $3.000 $3.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 956.000 $7.720 $6.420 $5.600 $5.800 $6.000 $6.000 $6.000 $6.000
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 3,097.000 $1.500 $0.800 $0.750 $0.900 $1.250 $1.200 $0.750 $1.200
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 64,125.000 $0.800 $0.770 $0.560 $0.500 $0.650 $0.600 $0.750 $0.600
TMA (STATIONARY)
DAY 180.000 $173.000 $172.540 $175.000 $189.900 $300.000 $378.880 $1,000.000 $564.360
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 42.000 $385.000 $610.000 $1,075.000 $630.000 $700.000 $600.000 $1,075.000 $1,075.000
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 14.000 $385.000 $510.000 $1,075.000 $525.000 $600.000 $500.000 $1,075.000 $1,075.000
Totals: $25,182,257.030 $29,881,212.721 $30,365,923.798 $30,991,732.519 $31,263,614.300 $32,387,095.756 $34,995,462.630 $38,508,970.876