Show Job Controls
Bid Cobra

HARRIS SL 8 (3256-02-111)

Items: 82

County: HARRIS
Length: 8.5960 MILES
Highway: SL 8
District: HOUSTON
Control Number: 3256-02-111
DBE Goal: 0.0%
Project: STP 2B25(012)MM
Guaranty: $45,000.00
Time: 67 WORKING DAYS
Engineer's Estimate: $2,124,618.81
Date: 07/02/2025 (11 months ago)
Contract Number: 7253217
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00141130
Contract Type: Federal
Project Description: REMOVE AND REPLACE PAVEMENT MARKINGS WITH MPM (MAINLANES AND FRONTAGE ROADS)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PHILLIP GARLIN
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,124,618.81
$1,588,377.55
Over/Under Est: -25.24% -$536,241.26
Over/Under Est: -14.07% -$298,883.25
Amt Left: 14.94% $237,358.01
$2,490,489.59
Over/Under Est: 17.22% $365,870.78
Amt Left: 56.79% $902,112.04
Delta: -36.41% -$664,754.03

Bid Items & Bid Tabulations

82 Total 0 of 82
HARRIS  |  SL 8  |  HOUSTON  |  3256-02-111  |  07/02/2025  |  $2,124,618.81  |  STP 2B25(012)MM  |  SURF/ROADWAY RESTOR  |  67 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRP INFRASTRUCTURE SERVICES, LLC
PROFESSIONAL TRAFFIC CONTROL LLC
BATTERSON, LLP
MOBILIZATION
LS 1.000 $62,000.000 $9,000.000 $30,000.000 $30,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,400.000 $1,000.000 $4,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 67.000 $115.000 $50.000 $30.000 $100.000
TMA (STATIONARY)
DAY 12.000 $255.480 $1,500.000 $200.000 $2,000.000
TMA (MOBILE OPERATION)
DAY 268.000 $202.920 $75.000 $30.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 842.000 $11.100 $12.000 $15.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 81.000 $28.430 $12.000 $43.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 271.000 $14.020 $12.000 $15.000 $15.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 438.000 $23.000 $12.000 $16.000 $15.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 57.000 $63.230 $12.000 $43.000 $20.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 102.000 $1.750 $2.250 $1.500 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,992.000 $1.770 $1.800 $1.200 $1.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 720.000 $2.060 $2.100 $4.750 $3.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,186.000 $3.370 $3.000 $3.600 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 183.000 $8.690 $6.600 $8.000 $6.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,160.000 $0.930 $0.990 $0.800 $1.000
RE PM TY II (W) 12" (SLD)
LF 1,552.000 $3.050 $1.300 $2.000 $3.000
RE PM TY II (Y) 12" (SLD)
LF 2,484.000 $2.250 $1.300 $2.000 $3.000
RE PM TY III (W)(12")(SLD)
LF 20,340.000 $1.960 $1.800 $3.500 $5.500
RE PM TY III (W)(12")(DOT)
LF 4,590.000 $1.980 $2.350 $3.750 $5.000
RE PM TY III (W)(24")(SLD)
LF 7,907.000 $8.240 $7.750 $7.500 $11.000
RE PM TY III (Y)(12")(SLD)
LF 1,153.000 $3.700 $3.850 $3.500 $5.000
RE PM TY III (BLK)(6")(SHADOW)
LF 26,340.000 $1.000 $0.790 $0.800 $1.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 1,257.000 $0.950 $2.150 $1.000 $1.500
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 5,160.000 $1.080 $2.150 $1.000 $1.500
ALL-WTHER PM TY I (W)6"(DOT)(100MIL)
LF 134.000 $1.250 $5.000 $3.000 $1.500
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 2,600.000 $0.950 $2.150 $1.000 $1.500
PAVEMENT SLER 6"
LF 14,311.000 $0.110 $0.140 $0.250 $0.250
PAVEMENT SLER 8"
LF 5,094.000 $0.220 $0.240 $0.350 $0.400
PAVEMENT SLER 12"
LF 1,906.000 $0.260 $0.250 $0.520 $1.000
PAVEMENT SLER 24"
LF 7,907.000 $1.910 $0.490 $1.150 $2.000
PAVEMENT SLER (ARROW)
EA 290.000 $22.790 $3.800 $15.000 $25.000
PAVEMENT SLER (WORD)
EA 343.000 $29.810 $5.650 $18.000 $25.000
PAVEMENT SLER (DBL ARROW)
EA 101.000 $32.570 $6.100 $28.000 $25.000
PAVEMENT SLER (TPL ARROW)
EA 4.000 $61.690 $7.650 $40.000 $25.000
PAVEMENT SLER (UTURN ARROW)
EA 18.000 $32.350 $7.350 $30.000 $35.000
PAVEMENT SLER (U-L ARROW)
EA 13.000 $40.000 $7.350 $35.000 $35.000
PAVEMENT SLER (SYMBOL)
EA 32.000 $51.690 $17.000 $20.000 $35.000
PAVEMENT SLER (YLD TRI)
EA 165.000 $5.000 $0.550 $5.000 $5.000
PREFAB PM TY C (W)(ARROW)
EA 290.000 $268.790 $178.000 $223.000 $260.000
PREFAB PM TY C (W)(DBL ARROW)
EA 101.000 $437.410 $288.000 $300.000 $470.000
PREFAB PM TY C (W)(TPL ARROW)
EA 4.000 $490.000 $355.000 $425.000 $535.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 18.000 $387.870 $300.000 $315.000 $420.000
PREFAB PM TY C (W)(U-LT ARROW)
EA 13.000 $450.000 $300.000 $375.000 $640.000
PREFAB PM TY C (W)(WORD)
EA 343.000 $320.110 $265.000 $265.000 $370.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 165.000 $46.820 $63.000 $40.000 $60.000
PREFAB PM TY C (MULTI)(SHIELD)
EA 32.000 $2,811.610 $2,800.000 $2,600.000 $3,000.000
REFL PAV MRKR TY I-A
EA 70.000 $6.560 $5.300 $5.500 $6.000
REFL PAV MRKR TY I-C
EA 92.000 $6.540 $6.100 $5.500 $6.000
REFL PAV MRKR TY II-A-A
EA 152.000 $6.670 $5.350 $5.000 $6.000
REFL PAV MRKR TY II-C-R
EA 8,080.000 $6.650 $5.200 $4.750 $6.000
ELIM EXT PM & MRKS (6")
LF 387,813.000 $0.400 $0.360 $0.450 $0.500
ELIM EXT PM & MRKS (8")
LF 59,458.000 $0.980 $0.820 $0.500 $1.000
ELIM EXT PM & MRKS (12")
LF 32,025.000 $1.560 $0.850 $1.000 $3.000
ELIM EXT PM & MRKS (24")
LF 8,090.000 $3.470 $2.650 $2.000 $4.000
ELIM EXT PM & MRKS (ARROW)
EA 140.000 $43.080 $38.000 $48.000 $75.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 42.000 $52.150 $53.000 $60.000 $75.000
ELIM EXT PM & MRKS (UTURN ARROW)
EA 16.000 $44.800 $67.000 $70.000 $85.000
ELIM EXT PM & MRKS (UTRN/LT ARR)
EA 9.000 $70.200 $67.000 $75.000 $85.000
ELIM EXT PM & MRKS (WORD)
EA 144.000 $51.220 $44.000 $55.000 $75.000
ELIM EXT PM & MRKS (SHIELD)
EA 32.000 $23.060 $44.000 $125.000 $75.000
PAV SURF PREP FOR MRK (6")
LF 284,433.000 $0.030 $0.020 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 59,458.000 $0.050 $0.060 $0.050 $0.020
PAV SURF PREP FOR MRK (10")
LF 51,690.000 $0.210 $0.070 $0.150 $0.100
PAV SURF PREP FOR MRK (12")
LF 32,025.000 $0.170 $0.250 $0.200 $0.250
PAV SURF PREP FOR MRK (24")
LF 8,090.000 $0.690 $0.450 $0.450 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 290.000 $15.870 $11.500 $10.000 $10.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 101.000 $10.770 $16.000 $18.000 $10.000
PAV SURF PREP FOR MRK (TPL ARROW)
EA 4.000 $11.840 $50.000 $25.000 $10.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 18.000 $10.930 $16.000 $20.000 $10.000
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 13.000 $35.000 $16.000 $25.000 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 343.000 $15.990 $13.250 $12.000 $10.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 165.000 $5.250 $5.350 $4.000 $10.000
PAV SURF PREP FOR MRK (SHIELD)
EA 32.000 $54.630 $5.350 $45.000 $10.000
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 51,690.000 $13.100 $9.400 $11.750 $15.000
MLTPLY PV MK W/WTY (W) (6") (SLD)
LF 105,855.000 $0.840 $0.600 $0.700 $1.000
MLTPLY PV MK W/WTY (W) (6") (BRK)
LF 26,340.000 $0.840 $0.780 $0.720 $1.000
MLTPLY PV MK W/WTY (W) (6") (DOT)
LF 5,958.000 $1.680 $1.500 $1.000 $1.750
MLTPLY PV MK W/WTY (Y) (6") (SLD)
LF 105,629.000 $0.840 $0.600 $0.700 $1.000
MLTPLY PV MK W/WTY (W) (8") (SLD)
LF 50,768.000 $1.480 $1.080 $1.420 $2.000
MLTPLY PV MK W/WTY (W) (8") (DOT)
LF 1,701.000 $3.000 $1.650 $1.600 $2.000
MLTPLY PV MK W/WTY (Y) (8") (SLD)
LF 1,895.000 $1.480 $3.150 $1.420 $2.000
Totals: $2,124,618.810 $1,588,377.550 $1,825,735.560 $2,490,489.590
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FORCE ACCOUNT WORK (PART) $2,200.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $23,200.00