HARRIS FM 2920 (2941-02-062)

Items: 128

County: HARRIS
Length: N/A
Highway: FM 2920
District: HOUSTON
Control Number: 2941-02-062
DBE Goal: N/A
Project: CM 2021(842)
Guaranty: N/A
Time: 209 WORKING DAYS
Engineer's Estimate: $4,170,228.65
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: INSTALL RAISED MEDIAN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$4,170,228.65
$3,615,522.52
Over/Under Est: -13.3% -$554,706.13
Over/Under Est: -4.41% -$183,990.38
Amt Left: 10.25% $370,715.75
Over/Under Est: 0.37% $15,498.90
Amt Left: 15.77% $570,205.03
Delta: -5.00% -$199,489.28
$4,998,886.74
Over/Under Est: 19.87% $828,658.09
Amt Left: 38.26% $1,383,364.22
Delta: -19.43% -$813,159.19
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 10.12% $520,998.21
PROFESSIONAL TRAFFIC CONTROL LLC 3.83% $197,176.20
CURB PLANET INC. 2.49% $128,190.27
GMJ PAVING COMPANY LLC 0.85% $43,759.73
Total: 17.29% $890,124.41

Bid Items & Bid Tabulations

128 Total 0 of 128
HARRIS  |  FM 2920  |  HOUSTON  |  2941-02-062  |  08/05/2021  |  $4,170,228.65  |  CM 2021(842)  |  INSTL RAISED MEDIAN  |  209 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MBN ENTERPRISES LLC
STERLING DELAWARE HOLDING COMPANY, INC.
MAIN LANE INDUSTRIES LTD.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 6.000 $10,000.000 $2,000.000 $5,000.000 $500.000 $13,838.260
REMOVING CONC (PAV)
SY 555.000 $20.000 $25.000 $40.000 $13.000 $10.880
REMOVING CONC (RIPRAP)
SY 27.000 $10.000 $25.000 $100.000 $40.000 $41.510
REMOVING CONC (RIPRAP)
CY 2.000 $100.000 $25.000 $100.000 $230.000 $691.910
REMOVING CONC (DRIVEWAYS)
SY 39.000 $14.000 $25.000 $25.000 $5.000 $27.680
REMOVING CONC (CURB)
LF 16.000 $15.000 $25.000 $74.000 $4.000 $69.190
REMOVING CONC (SIDEWALK OR RAMP)
SY 180.000 $20.000 $25.000 $10.000 $5.000 $11.220
REMOVING STAB BASE & ASPH PAV (18")
SY 555.000 $20.000 $25.000 $30.000 $10.000 $16.160
SUBGRADE WIDENING (DENS CONT)
STA 6.000 $6,000.000 $500.000 $12,200.000 $3,000.000 $1,383.830
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 110.000 $75.000 $35.000 $70.000 $10.000 $55.350
BLOCK SODDING
SY 400.000 $10.000 $4.720 $6.000 $5.500 $6.920
FERTILIZER
AC 0.080 $3,000.000 $1,667.630 $1,800.000 $1,800.000 $988.250
VEGETATIVE WATERING
MG 9.920 $120.000 $46.460 $30.000 $30.000 $207.570
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(14")
SY 787.000 $50.000 $50.000 $90.000 $75.000 $120.880
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
SY 555.000 $10.000 $15.000 $18.000 $7.000 $4.150
ASPH (MULTI OPTION)
GAL 252.000 $20.000 $23.000 $4.000 $3.000 $20.760
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 6.000 $150.000 $1,100.000 $250.000 $300.000 $276.770
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 50.000 $250.000 $110.000 $150.000 $210.000 $276.770
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 89.000 $230.000 $272.380 $225.000 $300.000 $339.040
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 110.000 $300.000 $366.880 $275.000 $400.000 $456.660
BRIDGE MEDIAN
SF 1,610.000 $10.000 $12.000 $17.000 $9.500 $34.600
RIPRAP (CONC)(4 IN)
CY 4.000 $400.000 $750.000 $1,550.000 $400.000 $484.340
RIPRAP (CONC)(6 IN)
CY 782.000 $450.000 $560.000 $475.000 $560.000 $471.760
CLEANING AND SEALING EXISTING JOINTS
LF 156.000 $30.000 $32.000 $55.000 $45.000 $138.380
MOBILIZATION
LS 1.000 $390,000.000 $360,000.000 $350,000.000 $410,000.000 $484,339.080
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $9,500.000 $6,200.000 $15,000.000 $20,757.390
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $4.000 $3.000 $3.500 $2.500 $2.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $2.000 $0.500 $0.500 $0.500 $0.890
LANDSCAPE PAVERS
SY 18,993.000 $74.800 $55.000 $55.000 $50.000 $65.510
CONC CURB (DOWEL)(SLOTTED)
LF 534.000 $10.000 $12.000 $12.000 $25.000 $49.500
CONC CURB (DOWEL)
LF 39,281.000 $10.000 $10.000 $7.000 $9.000 $11.070
CONC SIDEWALKS (6")
SY 90.000 $100.000 $56.000 $125.000 $75.000 $108.360
CURB RAMPS (TY 7)
EA 5.000 $3,500.000 $1,100.000 $6,500.000 $4,000.000 $2,040.040
CONC DIRECTIONAL ISLAND (12")
LF 425.000 $40.000 $13.200 $50.000 $65.000 $50.120
CONC DIRECTIONAL ISLAND (24")
LF 14,982.000 $30.000 $16.000 $53.000 $48.000 $40.140
REMOVE METAL BEAM GUARD FENCE
LF 62.500 $2.600 $2.000 $10.000 $8.000 $11.070
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $297.000 $210.000 $300.000 $250.000 $507.490
CONDT (PVC) (SCH 80) (2")
LF 440.000 $15.000 $10.010 $9.000 $11.000 $12.450
CONDT (PVC) (SCH 80) (2") (BORE)
LF 545.000 $15.000 $12.230 $11.000 $12.500 $15.220
CONDT (PVC) (SCH 80) (3")
LF 115.000 $18.000 $14.450 $13.000 $15.000 $17.990
CONDT (PVC) (SCH 80) (3") (BORE)
LF 145.000 $21.000 $18.900 $15.000 $20.000 $23.530
CONDT (PVC) (SCH 80) (4")
LF 125.000 $18.000 $23.350 $17.000 $25.000 $29.060
CONDT (RM) (2")
LF 140.000 $28.500 $28.910 $19.000 $30.000 $35.980
ELEC CONDR (NO.6) BARE
LF 1,425.000 $1.500 $1.610 $2.000 $1.700 $2.010
ELEC CONDR (NO.4) BARE
LF 250.000 $1.700 $2.780 $3.000 $3.000 $3.460
ELEC CONDR (NO.4) INSULATED
LF 470.000 $2.000 $3.110 $3.250 $3.300 $3.870
TRAY CABLE (4 CONDR) (12 AWG)
LF 2,270.000 $2.000 $2.110 $2.500 $2.300 $2.630
GROUND BOX TY D (162922)
EA 7.000 $850.000 $995.020 $525.000 $1,000.000 $1,238.520
GROUND BOX TY D (162922)W/APRON
EA 11.000 $1,500.000 $1,095.080 $775.000 $1,100.000 $1,363.070
REMOVE GROUND BOX
EA 30.000 $200.000 $189.000 $200.000 $200.000 $235.250
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 3.000 $3,800.000 $5,336.430 $5,000.000 $6,000.000 $6,642.360
ALUMINUM SIGNS (TY A)
SF 17.000 $50.000 $38.910 $18.000 $42.000 $34.810
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $500.000 $500.290 $475.000 $520.000 $625.110
REMOVE SM RD SN SUP&AM
EA 1.000 $120.000 $111.180 $100.000 $120.000 $110.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,216.000 $1.000 $0.990 $0.900 $1.000 $1.380
WK ZN PAV MRK REMOV (W)(ARROW)
EA 97.000 $150.000 $166.760 $150.000 $170.000 $200.650
WK ZN PAV MRK REMOV (W)(WORD)
EA 97.000 $200.000 $222.350 $200.000 $230.000 $242.170
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,000.000 $1.100 $0.720 $0.650 $0.750 $3.670
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 19,943.000 $1.100 $0.760 $0.700 $0.800 $1.730
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,530.000 $3.150 $2.780 $2.500 $3.000 $4.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 770.000 $5.000 $3.890 $3.500 $4.000 $8.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 129.000 $150.000 $38.910 $35.000 $40.000 $166.060
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 129.000 $150.000 $50.030 $45.000 $52.000 $207.570
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 886.000 $0.800 $0.480 $0.450 $0.500 $2.770
REFL PAV MRK TY II (Y) 12" (SLD)
LF 6,842.000 $1.280 $1.110 $1.000 $1.100 $2.770
REFL PAV MRK TY II (Y) (ISLAND)
SF 32,615.000 $1.750 $1.110 $1.000 $1.100 $2.770
PAVEMENT SEALER 6"
LF 7,716.000 $0.110 $0.170 $0.150 $0.150 $0.220
PAVEMENT SEALER 8"
LF 19,943.000 $0.200 $0.220 $0.200 $0.200 $0.480
PAVEMENT SEALER 12"
LF 1,530.000 $0.500 $0.280 $0.250 $0.300 $1.380
PAVEMENT SEALER 24"
LF 770.000 $2.000 $0.390 $0.350 $0.400 $2.770
PAVEMENT SEALER (ARROW)
EA 129.000 $22.000 $5.560 $5.000 $6.000 $41.510
PAVEMENT SEALER (WORD)
EA 129.000 $22.000 $11.120 $10.000 $12.000 $62.270
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,886.000 $0.550 $0.460 $0.400 $0.500 $1.380
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,144.000 $0.500 $0.430 $0.400 $0.500 $1.040
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,600.000 $0.550 $0.430 $0.400 $0.500 $1.040
REFL PAV MRKR TY I-C
EA 109.000 $4.300 $5.000 $4.500 $5.000 $5.540
REFL PAV MRKR TY II-C-R
EA 957.000 $4.500 $4.450 $4.000 $5.000 $5.540
ELIM EXT PAV MRK & MRKS (6")
LF 108,244.000 $0.500 $0.280 $0.250 $0.300 $0.350
ELIM EXT PAV MRK & MRKS (8")
LF 5,108.000 $0.650 $0.560 $0.500 $0.600 $0.620
ELIM EXT PAV MRK & MRKS (12")
LF 1,455.000 $1.200 $0.830 $0.750 $0.800 $1.380
ELIM EXT PAV MRK & MRKS (24")
LF 330.000 $2.050 $1.390 $1.250 $1.500 $2.770
ELIM EXT PAV MRK & MRKS (ARROW)
EA 131.000 $40.000 $27.790 $25.000 $30.000 $44.280
ELIM EXT PAV MRK & MRKS (WORD)
EA 55.000 $50.000 $33.350 $30.000 $34.000 $41.510
PAV SURF PREP FOR MRK (6")
LF 7,716.000 $0.080 $0.010 $0.010 $0.010 $0.170
PAV SURF PREP FOR MRK (8")
LF 19,943.000 $0.100 $0.020 $0.020 $0.030 $0.250
PAV SURF PREP FOR MRK (12")
LF 1,530.000 $0.300 $0.030 $0.030 $0.030 $1.380
PAV SURF PREP FOR MRK (24")
LF 770.000 $1.100 $0.070 $0.060 $0.070 $2.770
PAV SURF PREP FOR MRK (ARROW)
EA 129.000 $11.000 $3.340 $3.000 $3.500 $41.510
PAV SURF PREP FOR MRK (WORD)
EA 129.000 $10.000 $5.560 $5.000 $6.000 $55.350
PAV SURF PREP FOR MRK (RPM)
EA 1,026.000 $0.800 $0.110 $0.100 $0.100 $1.380
REMOVING TRAFFIC SIGNALS
EA 3.000 $3,300.000 $2,841.650 $6,000.000 $3,000.000 $3,537.060
VEH SIG SEC (12")LED(GRN)
EA 28.000 $180.000 $200.120 $160.000 $220.000 $249.090
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $180.000 $200.120 $160.000 $220.000 $249.090
VEH SIG SEC (12")LED(YEL)
EA 28.000 $185.000 $200.120 $160.000 $220.000 $249.090
VEH SIG SEC (12")LED(YEL ARW)
EA 5.000 $180.000 $200.120 $160.000 $220.000 $249.090
VEH SIG SEC (12")LED(RED)
EA 28.000 $182.000 $200.120 $160.000 $220.000 $249.090
VEH SIG SEC (12")LED(RED ARW)
EA 7.000 $200.000 $200.120 $160.000 $220.000 $249.090
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 26.000 $100.000 $138.970 $100.000 $150.000 $172.980
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 7.000 $200.000 $189.000 $100.000 $200.000 $235.250
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,090.000 $1.300 $1.670 $2.000 $1.700 $2.080
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 2,130.000 $1.600 $2.060 $2.000 $2.200 $2.560
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 4,750.000 $2.500 $2.610 $3.000 $2.700 $3.250
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 560.000 $1.500 $1.390 $2.000 $1.500 $1.730
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $8,350.000 $10,672.850 $9,500.000 $12,000.000 $13,284.730
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $8,000.000 $12,006.960 $10,000.000 $13,000.000 $14,945.320
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 3.000 $10,000.000 $12,290.450 $10,000.000 $13,500.000 $15,298.200
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $18,000.000 $31,395.970 $27,000.000 $35,000.000 $39,079.240
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $16,000.000 $32,573.320 $27,000.000 $36,000.000 $40,544.720
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $17,000.000 $33,500.520 $27,000.000 $37,000.000 $41,698.830
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 2.000 $18,000.000 $34,239.840 $27,000.000 $38,000.000 $42,619.070
PED POLE ASSEMBLY
EA 9.000 $2,200.000 $1,761.020 $1,600.000 $1,800.000 $2,191.980
RELOCATE PED POLE ASSEMBLY
EA 1.000 $1,060.000 $1,028.370 $800.000 $1,100.000 $1,280.040
PED DETECT PUSH BUTTON (APS)
EA 12.000 $550.000 $694.850 $675.000 $750.000 $864.890
PED DETECTOR CONTROLLER UNIT
EA 6.000 $3,200.000 $4,222.450 $1,000.000 $4,600.000 $5,255.770
VEH LP DETECT (SAWCUT)
LF 185.000 $12.000 $10.450 $12.000 $11.000 $13.010
D-GR HMA TY-D SAC-A PG76-22
TON 87.000 $150.000 $200.000 $165.000 $130.000 $268.460
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 108.000 $150.000 $220.000 $165.000 $125.000 $268.460
TACK COAT
GAL 47.000 $12.000 $8.890 $20.000 $2.000 $9.770
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 462.000 $100.000 $80.000 $25.000 $55.000 $103.790
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 35.000 $4.000 $3.340 $350.000 $3.500 $4.150
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 1.000 $1,135.800 $2,161.250 $700.000 $2,200.000 $2,690.160
FO SPLICE ENCLOSURE (TYPE 2)
EA 1.000 $1,458.500 $2,779.390 $1,200.000 $3,000.000 $3,459.560
FIBER OPTIC FUSION SPLICE
EA 12.000 $30.000 $27.790 $15.000 $30.000 $34.600
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $6,500.000 $7,226.410 $6,000.000 $8,000.000 $8,994.870
TMA (STATIONARY)
DAY 356.000 $162.000 $150.000 $110.000 $300.000 $207.570
TMA (MOBILE OPERATION)
HR 32.000 $60.000 $55.000 $100.000 $60.000 $138.380
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 11.000 $600.000 $872.730 $650.000 $900.000 $1,086.300
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 6.000 $550.000 $872.730 $650.000 $900.000 $1,086.300
Totals: $4,170,228.650 $3,615,522.524 $3,986,238.270 $4,185,727.550 $4,998,886.749