REMOVING CONC (APPR SLAB)
|
SY
|
138.000
|
$50.000
|
$63.250
|
$58.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
287.000
|
$300.000
|
$65.000
|
$50.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
334.000
|
$75.000
|
$182.000
|
$202.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
74.000
|
$120.000
|
$363.000
|
$330.000
|
|
|
TACK COAT
|
GAL
|
114.000
|
$3.000
|
$22.000
|
$18.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
90.000
|
$1.500
|
$74.000
|
$25.350
|
|
|
STRUCT EXCAV
|
CY
|
116.000
|
$300.000
|
$43.000
|
$33.000
|
|
|
CEM STABIL BKFL
|
CY
|
30.000
|
$70.000
|
$126.500
|
$232.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
750.000
|
$50.000
|
$116.250
|
$22.500
|
|
|
STL H - PILING (HP 16 X 101)
|
LF
|
1,071.000
|
$170.000
|
$170.250
|
$115.000
|
|
|
STL H - PILING (HP 18 X 157)
|
LF
|
486.000
|
$225.000
|
$228.250
|
$165.000
|
|
|
STL H - PILING (HP 18 X 204)
|
LF
|
612.000
|
$340.000
|
$242.750
|
$195.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
44.000
|
$1,300.000
|
$545.250
|
$293.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
60.000
|
$1,700.000
|
$296.000
|
$423.500
|
|
|
CL B CONC (MISC)
|
CY
|
7.700
|
$250.000
|
$324.250
|
$778.000
|
|
|
CL F CONC (ABUT) (HPC)
|
CY
|
48.900
|
$4,000.000
|
$1,619.000
|
$2,403.000
|
|
|
APPROACH SLAB
|
CY
|
49.600
|
$500.000
|
$884.250
|
$1,423.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$500.000
|
$923.000
|
$519.000
|
|
|
RIRRAP (STONE COMMON)(DRY)(15 IN)
|
CY
|
90.000
|
$300.000
|
$169.250
|
$241.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
410.000
|
$300.000
|
$152.250
|
$209.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
264.000
|
$10.000
|
$66.450
|
$53.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
2,600.000
|
$15.000
|
$15.250
|
$29.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
13.000
|
$111.000
|
$395.750
|
$413.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
1.000
|
$3,200.000
|
$7,535.000
|
$4,195.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$4,658.000
|
$7,915.000
|
$9,323.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$3,665.000
|
$2,688.000
|
|
|
REMOV STR (ABUTMENT)
|
EA
|
2.000
|
$10,000.000
|
$67,520.000
|
$20,476.500
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$2,000.000
|
$11,260.000
|
$7,415.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$455,600.000
|
$591,155.000
|
$324,300.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,500.000
|
$229.000
|
$1,587.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
240.000
|
$3.000
|
$2.250
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
240.000
|
$1.000
|
$0.850
|
$8.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
19.400
|
$50.000
|
$140.650
|
$351.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
48.000
|
$30.000
|
$217.000
|
$439.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,200.000
|
$2,858.000
|
$2,028.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
75.000
|
$5.000
|
$29.500
|
$26.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
108.000
|
$10.000
|
$19.650
|
$18.000
|
|
|
GATE (REMOVE)
|
EA
|
2.000
|
$500.000
|
$1,712.000
|
$973.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
293.000
|
$25.000
|
$49.150
|
$57.040
|
|
|
GATE(INSTALL)(DBL)(6 X14 )(BARB TOP)
|
EA
|
4.000
|
$300.000
|
$3,349.500
|
$2,408.290
|
|
|
CHAIN LINK FENCE GATE (INSTALL)(6'X4')
|
EA
|
2.000
|
$120.000
|
$1,088.000
|
$2,032.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
400.000
|
$0.500
|
$2.250
|
$2.500
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
48.000
|
$3.000
|
$4.450
|
$5.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
2.000
|
$100.000
|
$268.000
|
$305.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
400.000
|
$0.500
|
$2.250
|
$2.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
800.000
|
$0.500
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
48.000
|
$2.000
|
$1.250
|
$1.400
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$40.000
|
$140.000
|
$159.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
40.000
|
$3.000
|
$5.600
|
$6.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
800.000
|
$0.200
|
$0.100
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
48.000
|
$1.000
|
$1.100
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$20.000
|
$28.000
|
$32.000
|
|
|
TRANSFER RAMP
|
EA
|
2.000
|
$650,000.000
|
$481,848.000
|
$767,230.000
|
|
|
CONSTRUCT BULKHEAD TYPE 1
|
SF
|
3,965.000
|
$125.000
|
$107.850
|
$87.230
|
|
|
CONSTRUCT BULKHEAD TYPE 2
|
SF
|
1,625.000
|
$90.000
|
$196.300
|
$155.500
|
|
|
CONSTRUCT BULKHEAD TYPE 3
|
SF
|
2,307.000
|
$190.000
|
$153.800
|
$121.000
|
|
|
CONSTRUCT BULKHEAD TYPE 4
|
SF
|
1,741.000
|
$145.000
|
$185.350
|
$213.000
|
|
|
CONSTRUCT BULKHEAD TYPE 5
|
SF
|
2,007.000
|
$170.000
|
$189.850
|
$166.080
|
|
|
CONSTRUCT BULKHEAD TYPE 6
|
SF
|
3,038.000
|
$80.000
|
$93.450
|
$70.500
|
|
|
PRESTRESSED GROUND ANCHORS
|
LF
|
3,040.000
|
$85.000
|
$358.600
|
$418.150
|
|
|
REMOVE AND RELOCATE GATE ASSEMBLY
|
EA
|
2.000
|
$10,000.000
|
$12,699.000
|
$6,304.000
|
|
|
REMOVE & REPLACE BOLLARD
|
EA
|
4.000
|
$10,000.000
|
$5,155.000
|
$6,312.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
520.000
|
$55.000
|
$107.200
|
$121.000
|
|
Totals: |
$5,381,731.000
|
$6,051,944.835
|
$6,096,879.090
|