Show Job Controls
Bid Cobra

HARRIS CR (0912-72-536)

Items: 63

County: HARRIS
Length: N/A
Highway: CR
District: HOUSTON
Control Number: 0912-72-536
DBE Goal: N/A
Project: FB 2020(061)
Guaranty: N/A
Time: 230 WORKING DAYS
Engineer's Estimate: $5,381,731.00
Date: 10/03/2019 (6 years ago)
Contract Number: N/A
Type: FERRY BOAT OPERATIONS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$5,381,731.00
Over/Under Est: 12.45% $670,213.83
$6,096,879.09
Over/Under Est: 13.29% $715,148.09
Amt Left: 0.74% $44,934.26

Bid Items & Bid Tabulations

63 Total 0 of 63
HARRIS  |  CR  |  HOUSTON  |  0912-72-536  |  10/03/2019  |  $5,381,731.00  |  FB 2020(061)  |  FERRY BOAT OPERATIONS  |  230 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS GULF CONSTRUCTION COMPANY, INC.
RUSSELL MARINE, LLC
REMOVING CONC (APPR SLAB)
SY 138.000 $50.000 $63.250 $58.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 287.000 $300.000 $65.000 $50.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 334.000 $75.000 $182.000 $202.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 74.000 $120.000 $363.000 $330.000
TACK COAT
GAL 114.000 $3.000 $22.000 $18.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 90.000 $1.500 $74.000 $25.350
STRUCT EXCAV
CY 116.000 $300.000 $43.000 $33.000
CEM STABIL BKFL
CY 30.000 $70.000 $126.500 $232.000
TEMPORARY SPL SHORING
SF 750.000 $50.000 $116.250 $22.500
STL H - PILING (HP 16 X 101)
LF 1,071.000 $170.000 $170.250 $115.000
STL H - PILING (HP 18 X 157)
LF 486.000 $225.000 $228.250 $165.000
STL H - PILING (HP 18 X 204)
LF 612.000 $340.000 $242.750 $195.000
DRILL SHAFT (18 IN)
LF 44.000 $1,300.000 $545.250 $293.000
DRILL SHAFT (24 IN)
LF 60.000 $1,700.000 $296.000 $423.500
CL B CONC (MISC)
CY 7.700 $250.000 $324.250 $778.000
CL F CONC (ABUT) (HPC)
CY 48.900 $4,000.000 $1,619.000 $2,403.000
APPROACH SLAB
CY 49.600 $500.000 $884.250 $1,423.000
RIPRAP (CONC)(5 IN)
CY 8.000 $500.000 $923.000 $519.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 90.000 $300.000 $169.250 $241.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 410.000 $300.000 $152.250 $209.000
STR STEEL (MISC NON - BRIDGE)
LB 264.000 $10.000 $66.450 $53.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 2,600.000 $15.000 $15.250 $29.000
RC PIPE (CL III)(18 IN)
LF 13.000 $111.000 $395.750 $413.000
INLET (COMPL)(TY AD)
EA 1.000 $3,200.000 $7,535.000 $4,195.000
MANH (COMPL)(TY A)
EA 1.000 $4,658.000 $7,915.000 $9,323.000
REMOV STR (INLET)
EA 1.000 $1,000.000 $3,665.000 $2,688.000
REMOV STR (ABUTMENT)
EA 2.000 $10,000.000 $67,520.000 $20,476.500
REMOV STR (SMALL)
EA 1.000 $2,000.000 $11,260.000 $7,415.000
MOBILIZATION
LS 1.000 $455,600.000 $591,155.000 $324,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,500.000 $229.000 $1,587.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 240.000 $3.000 $2.250 $13.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 240.000 $1.000 $0.850 $8.000
CONC SIDEWALKS (4")
SY 19.400 $50.000 $140.650 $351.000
MTL W-BEAM GD FEN (STEEL POST)
LF 48.000 $30.000 $217.000 $439.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,200.000 $2,858.000 $2,028.000
REMOVE METAL BEAM GUARD FENCE
LF 75.000 $5.000 $29.500 $26.000
CHAIN LINK FENCE (REMOVE)
LF 108.000 $10.000 $19.650 $18.000
GATE (REMOVE)
EA 2.000 $500.000 $1,712.000 $973.000
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
LF 293.000 $25.000 $49.150 $57.040
GATE(INSTALL)(DBL)(6 X14 )(BARB TOP)
EA 4.000 $300.000 $3,349.500 $2,408.290
CHAIN LINK FENCE GATE (INSTALL)(6'X4')
EA 2.000 $120.000 $1,088.000 $2,032.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 400.000 $0.500 $2.250 $2.500
REFL PAV MRK TY II (W) 12" (SLD)
LF 48.000 $3.000 $4.450 $5.000
REFL PAV MRK TY II (W) (WORD)
EA 2.000 $100.000 $268.000 $305.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 400.000 $0.500 $2.250 $2.500
PAVEMENT SEALER 4"
LF 800.000 $0.500 $0.200 $0.200
PAVEMENT SEALER 12"
LF 48.000 $2.000 $1.250 $1.400
PAVEMENT SEALER (WORD)
EA 2.000 $40.000 $140.000 $159.000
REFL PAV MRKR TY II-A-A
EA 40.000 $3.000 $5.600 $6.500
PAV SURF PREP FOR MRK (4")
LF 800.000 $0.200 $0.100 $0.150
PAV SURF PREP FOR MRK (12")
LF 48.000 $1.000 $1.100 $1.500
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $20.000 $28.000 $32.000
TRANSFER RAMP
EA 2.000 $650,000.000 $481,848.000 $767,230.000
CONSTRUCT BULKHEAD TYPE 1
SF 3,965.000 $125.000 $107.850 $87.230
CONSTRUCT BULKHEAD TYPE 2
SF 1,625.000 $90.000 $196.300 $155.500
CONSTRUCT BULKHEAD TYPE 3
SF 2,307.000 $190.000 $153.800 $121.000
CONSTRUCT BULKHEAD TYPE 4
SF 1,741.000 $145.000 $185.350 $213.000
CONSTRUCT BULKHEAD TYPE 5
SF 2,007.000 $170.000 $189.850 $166.080
CONSTRUCT BULKHEAD TYPE 6
SF 3,038.000 $80.000 $93.450 $70.500
PRESTRESSED GROUND ANCHORS
LF 3,040.000 $85.000 $358.600 $418.150
REMOVE AND RELOCATE GATE ASSEMBLY
EA 2.000 $10,000.000 $12,699.000 $6,304.000
REMOVE & REPLACE BOLLARD
EA 4.000 $10,000.000 $5,155.000 $6,312.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 520.000 $55.000 $107.200 $121.000
Totals: $5,381,731.000 $6,051,944.835 $6,096,879.090