County: HARRIS Highway: CS Date: 05/01/2018 (6 years ago) Engineer's Estimate: $916,218 Control Number: 0912-72-333
Project: BR 2016(408) District: HOUSTON Time: 165 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $916,217.98
NBG CONSTRUCTORS, INC.   $1,137,427.78 1
24.14% | $221,209.80
ARANDA BROTHERS CONSTRUCTION CO., INC.   $1,181,970.77 2
29.01% | $265,752.79
3.92% | $44,542.99
MAIN LANE INDUSTRIES LTD.   $1,314,851.70 3
43.51% | $398,633.72
15.6% | $177,423.92
11.24% | $132,880.93
ISI CONTRACTING, INC.   $1,353,420.71 4
47.72% | $437,202.73
18.99% | $215,992.93
2.93% | $38,569.01
JOHN REED AND COMPANY, LLC   $1,402,401.31 5
53.06% | $486,183.33
23.3% | $264,973.53
3.62% | $48,980.60

Bid Items

Items: 83, 0 filtered
HARRIS CS  |  HOUSTON  |  0912-72-333  |  05/01/2018  |  $916,218  |  BR 2016(408)  |  REPLACE BRIDGE AND APPROACHES  |  165 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate NBG CONSTRUCTORS, INC. ARANDA BROTHERS CONSTRUCTION CO., INC. MAIN LANE INDUSTRIES LTD. ISI CONTRACTING, INC. JOHN REED AND COMPANY, LLC
100 6002 PREPARING ROW STA 5.300 $2,000.000 $5,000.000 $15,000.000 $5,000.000 $800.000 $9,000.000
104 6001 REMOVING CONC (PAV) SY 651.000 $5.000 $7.000 $10.000 $4.000 $12.000 $4.000
104 6015 REMOVING CONC (SIDEWALKS) SY 55.000 $8.000 $8.000 $10.000 $5.000 $25.000 $5.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 96.000 $11.000 $15.000 $10.000 $10.000 $15.000 $5.000
110 6001 EXCAVATION (ROADWAY) CY 1,051.000 $14.000 $15.000 $15.000 $30.000 $21.000 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 227.000 $12.000 $20.000 $20.000 $30.000 $35.000 $20.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 1,682.000 $1.400 $1.000 $1.000 $1.000 $5.500 $1.000
162 6002 BLOCK SODDING SY 464.000 $5.500 $8.000 $5.000 $4.000 $8.500 $3.000
162 6003 STRAW OR HAY MULCH SY 1,682.000 $0.400 $2.500 $0.300 $0.200 $0.800 $0.500
164 6052 BROADCAST SEED (PERM)(SPECIAL MIX) SY 1,682.000 $0.300 $1.000 $0.500 $0.150 $0.300 $0.500
168 6001 VEGETATIVE WATERING MG 53.500 $15.000 $10.000 $20.000 $15.000 $14.000 $20.000
260 6006 LIME TRT (EXST MATL) (6") SY 544.000 $2.000 $4.000 $5.000 $18.000 $8.500 $6.000
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 7.350 $150.000 $500.000 $170.000 $160.000 $200.000 $150.000
292 6002 ASPHALT STAB BASE (GR 2)(PG 64) TON 248.000 $63.000 $100.000 $130.000 $120.000 $92.000 $98.000
341 6042 D-GR HMA TY-D SAC-B PG70-22 TON 79.000 $74.000 $100.000 $140.000 $130.000 $180.000 $130.000
360 6028 CONC PAV (JOINT REINF) (6") SY 508.000 $65.000 $75.000 $60.000 $60.000 $80.000 $60.000
400 6005 CEM STABIL BKFL CY 25.000 $38.000 $100.000 $55.000 $50.000 $45.000 $60.000
402 6001 TRENCH EXCAVATION PROTECTION LF 100.000 $2.000 $1.000 $1.000 $5.000 $1.000 $2.000
416 6001 DRILL SHAFT (18 IN) LF 205.000 $130.000 $100.000 $190.000 $100.000 $74.000 $220.000
416 6002 DRILL SHAFT (24 IN) LF 452.000 $179.000 $200.000 $235.000 $175.000 $174.000 $350.000
416 6003 DRILL SHAFT (30 IN) LF 132.000 $200.000 $250.000 $295.000 $200.000 $200.000 $550.000
420 6013 CL C CONC (ABUT) CY 54.000 $918.000 $1,200.000 $1,050.000 $1,500.000 $1,200.000 $1,500.000
422 6005 REINF CONC SLAB (BOX BEAM) SF 1,648.200 $13.000 $18.000 $12.000 $34.000 $17.000 $20.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,180.500 $15.000 $14.000 $12.000 $34.000 $23.000 $15.000
422 6013 BRIDGE SIDEWALK SF 779.700 $10.000 $13.000 $9.500 $15.000 $9.000 $25.000
422 6015 APPROACH SLAB CY 181.300 $450.000 $600.000 $420.000 $500.000 $715.000 $450.000
422 6023 SHEAR KEY CY 9.300 $280.000 $300.000 $550.000 $400.000 $250.000 $200.000
425 6001 PRESTR CONC BOX BEAM (4B20) LF 245.936 $180.000 $255.000 $195.000 $200.000 $203.000 $310.000
425 6002 PRESTR CONC BOX BEAM (5B20) LF 122.960 $180.000 $255.000 $195.000 $300.000 $206.000 $310.000
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 99.060 $100.000 $230.000 $195.000 $200.000 $210.000 $310.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 346.710 $100.000 $230.000 $195.000 $300.000 $205.000 $310.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 103.000 $185.000 $150.000 $195.000 $150.000 $148.000 $70.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 154.000 $142.000 $150.000 $215.000 $150.000 $176.000 $75.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 26.000 $560.000 $600.000 $450.000 $775.000 $630.000 $350.000
450 6006 RAIL (TY T223) LF 156.000 $69.000 $125.000 $90.000 $200.000 $99.000 $90.000
450 6032 RAIL (TY C223) LF 124.100 $85.000 $150.000 $175.000 $300.000 $110.000 $110.000
460 6005 CMP (GAL STL 36 IN) LF 94.000 $93.000 $100.000 $45.000 $70.000 $84.000 $80.000
465 6003 MANH (COMPL)(PRM)(60IN) EA 3.000 $4,400.000 $6,000.000 $6,200.000 $5,000.000 $5,200.000 $4,000.000
496 6003 REMOV STR (MANHOLE) EA 1.000 $1,500.000 $1,000.000 $500.000 $3,000.000 $990.000 $500.000
496 6007 REMOV STR (PIPE) LF 50.000 $35.000 $20.000 $10.000 $30.000 $20.000 $5.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000 $15,000.000 $15,000.000 $25,000.000 $12,000.000 $30,000.000 $50,000.000
500 6001 MOBILIZATION LS 2.000 $45,000.000 $50,000.000 $40,000.000 $65,000.000 $135,000.000 $70,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $3,000.000 $1,000.000 $2,500.000 $2,500.000 $1,600.000 $1,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 155.000 $35.000 $75.000 $50.000 $35.000 $66.000 $45.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 155.000 $15.000 $30.000 $10.000 $15.000 $34.000 $10.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 268.000 $34.000 $50.000 $35.000 $30.000 $41.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 268.000 $9.000 $20.000 $5.000 $10.000 $20.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,391.000 $2.800 $4.000 $4.250 $3.000 $3.000 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,391.000 $0.900 $1.500 $1.000 $1.000 $1.500 $1.000
508 6001 CONSTRUCTING DETOURS SY 345.000 $63.000 $50.000 $65.000 $80.000 $88.000 $50.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 400.000 $28.000 $20.000 $65.000 $50.000 $65.000 $25.000
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 80.000 $25.000 $20.000 $65.000 $50.000 $65.000 $25.000
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 320.000 $5.500 $4.000 $20.000 $10.000 $10.000 $11.660
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 160.000 $6.100 $4.000 $20.000 $10.000 $10.000 $2.920
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 400.000 $7.000 $12.000 $25.000 $15.000 $9.000 $14.800
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 80.000 $7.000 $12.000 $25.000 $15.000 $9.000 $11.660
529 6005 CONC CURB (MONO) (TY II) LF 372.000 $4.000 $5.000 $6.000 $10.000 $4.000 $10.000
530 6005 DRIVEWAYS (ACP) SY 97.000 $35.000 $50.000 $45.000 $100.000 $76.000 $80.000
530 6025 DRIVEWAYS (CONC) (FAST TRACK) SY 99.000 $70.000 $90.000 $85.000 $150.000 $95.000 $133.800
531 6002 CONC SIDEWALKS (5") SY 169.000 $65.000 $60.000 $65.000 $100.000 $55.000 $60.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 375.000 $22.000 $25.000 $15.000 $19.500 $24.000 $23.250
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,567.000 $1,250.000 $1,650.000 $1,000.000 $1,700.000 $1,140.000
540 6014 SHORT RADIUS LF 30.000 $51.000 $35.000 $25.000 $29.610 $43.000 $28.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,187.000 $1,500.000 $1,350.000 $1,130.000 $1,300.000 $950.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $2,343.000 $2,500.000 $1,400.000 $2,300.000 $2,700.000 $2,450.000
618 6053 CONDT (PVC) (SCH 80) (3") LF 70.000 $20.000 $75.000 $20.000 $40.000 $35.000 $25.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 1.000 $486.000 $600.000 $500.000 $600.000 $900.000 $800.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $200.000 $45.000 $450.000 $45.000 $88.000 $50.000
658 6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 24.000 $40.000 $50.000 $20.000 $50.000 $24.000 $52.000
658 6010 INSTL DEL ASSM (D-SW)SZ 2(WC)GND EA 12.000 $27.000 $50.000 $20.000 $50.000 $24.000 $59.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 12.000 $48.000 $10.000 $20.000 $10.000 $6.000 $21.000
658 6051 INSTL OM ASSM (OM-3L)(FLX)SRF EA 4.000 $198.000 $205.000 $20.000 $205.000 $145.000 $214.000
658 6054 INSTL OM ASSM (OM-3R)(FLX)SRF EA 4.000 $130.000 $205.000 $20.000 $205.000 $145.000 $214.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 7.000 $20.000 $15.000 $20.000 $15.000 $15.000 $10.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 1,014.000 $0.300 $0.500 $1.500 $0.650 $0.250 $0.650
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 1,985.000 $0.600 $1.000 $2.000 $1.300 $0.600 $1.300
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 55.000 $6.000 $5.000 $9.000 $6.500 $6.400 $6.500
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 987.000 $0.600 $1.000 $2.000 $1.300 $0.700 $1.300
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 100.000 $0.700 $1.000 $10.000 $0.500 $0.750 $1.000
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 510.000 $0.700 $1.000 $2.500 $3.000 $0.100 $3.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,968.000 $0.350 $1.000 $3.000 $0.750 $2.250 $0.750
672 6009 REFL PAV MRKR TY II-A-A EA 32.000 $3.000 $5.000 $10.000 $4.000 $2.750 $4.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 29.000 $59.000 $20.000 $100.000 $100.000 $100.000 $90.000
Totals: $916,217.98 $1,137,427.78 $1,181,970.77 $1,314,851.70 $1,353,420.72 $1,402,401.31