|
|
REMOVING CONC (PAV)
|
SY
|
426.000
|
$7.000
|
$14.000
|
$39.000
|
$50.000
|
$18.000
|
$25.000
|
$32.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
366.000
|
$50.000
|
$7.250
|
$30.000
|
$15.000
|
$9.000
|
$25.000
|
$26.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
4.000
|
$60.000
|
$100.000
|
$90.000
|
$100.000
|
$125.000
|
$250.000
|
$475.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,091.000
|
$4.750
|
$12.000
|
$10.000
|
$10.000
|
$77.000
|
$25.000
|
$18.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
204.000
|
$10.000
|
$18.000
|
$28.000
|
$50.000
|
$9.000
|
$25.000
|
$47.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,209.000
|
$5.000
|
$15.000
|
$6.000
|
$5.000
|
$7.000
|
$5.000
|
$5.500
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
2,289.000
|
$2.500
|
$10.000
|
$3.500
|
$10.000
|
$44.000
|
$15.000
|
$12.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,512.000
|
$9.000
|
$60.000
|
$19.000
|
$25.000
|
$19.000
|
$26.000
|
$16.250
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
69.630
|
$1,550.000
|
$200.000
|
$1,000.000
|
$2,500.000
|
$872.000
|
$300.000
|
$1,140.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
566.000
|
$50.000
|
$50.000
|
$32.000
|
$25.000
|
$62.000
|
$45.000
|
$36.750
|
|
|
BLOCK SODDING
|
SY
|
6,845.000
|
$2.500
|
$5.000
|
$4.900
|
$4.500
|
$5.000
|
$5.000
|
$6.500
|
|
|
FERTILIZER
|
AC
|
1.430
|
$815.000
|
$975.000
|
$1,600.000
|
$1,000.000
|
$93.000
|
$1,200.000
|
$2,200.000
|
|
|
VEGETATIVE WATERING
|
MG
|
173.700
|
$7.000
|
$10.000
|
$15.000
|
$30.000
|
$25.000
|
$50.000
|
$25.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
909.000
|
$20.000
|
$25.000
|
$45.000
|
$40.000
|
$93.000
|
$68.000
|
$50.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
1,651.000
|
$70.000
|
$83.000
|
$110.000
|
$95.000
|
$87.000
|
$130.000
|
$175.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
|
SY
|
240.000
|
$2.500
|
$5.000
|
$1.500
|
$6.000
|
$4.000
|
$30.000
|
$14.300
|
|
|
PRIME COAT (MC-30)
|
GAL
|
344.000
|
$5.000
|
$5.000
|
$5.250
|
$7.000
|
$17.000
|
$10.000
|
$6.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG76-22
|
TON
|
221.000
|
$140.000
|
$100.000
|
$125.000
|
$150.000
|
$280.000
|
$205.000
|
$175.000
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
224.000
|
$200.000
|
$110.000
|
$125.000
|
$145.000
|
$280.000
|
$195.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
324.000
|
$5.250
|
$5.500
|
$7.000
|
$3.000
|
$4.000
|
$5.000
|
$5.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
2,820.000
|
$100.000
|
$143.000
|
$98.000
|
$115.000
|
$106.000
|
$140.000
|
$195.000
|
|
|
CONC PAV (CONT REINF)(FAST TRK)(11")
|
SY
|
276.000
|
$130.000
|
$150.000
|
$135.000
|
$105.000
|
$250.000
|
$125.000
|
$160.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
189.000
|
$9.000
|
$2.000
|
$13.000
|
$10.000
|
$95.000
|
$11.000
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
88.430
|
$71.210
|
$38.000
|
$47.000
|
$50.000
|
$168.000
|
$55.000
|
$62.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
42.000
|
$45.000
|
$50.000
|
$47.000
|
$50.000
|
$350.000
|
$55.000
|
$62.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
44.000
|
$180.000
|
$171.000
|
$125.000
|
$100.000
|
$180.000
|
$122.000
|
$450.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
189.000
|
$3.000
|
$1.000
|
$1.000
|
$5.000
|
$10.000
|
$3.000
|
$1.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$1,350.000
|
$600.000
|
$1,300.000
|
$2,500.000
|
$400.000
|
$600.000
|
$1,400.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$425.000
|
$600.000
|
$440.000
|
$1,200.000
|
$400.000
|
$1,100.000
|
$1,450.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$250.000
|
$150.000
|
$265.000
|
$150.000
|
$187.000
|
$114.000
|
$210.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
189.000
|
$125.000
|
$80.000
|
$163.000
|
$150.000
|
$210.000
|
$116.000
|
$200.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
1.000
|
$7,500.000
|
$5,000.000
|
$5,800.000
|
$5,500.000
|
$5,500.000
|
$5,200.000
|
$7,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
1.000
|
$5,100.000
|
$6,500.000
|
$7,000.000
|
$7,800.000
|
$4,500.000
|
$6,300.000
|
$8,400.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$4,000.000
|
$5,500.000
|
$5,000.000
|
$4,600.000
|
$7,200.000
|
$4,150.000
|
$5,425.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
1.000
|
$5,200.000
|
$5,500.000
|
$4,700.000
|
$4,200.000
|
$7,000.000
|
$3,900.000
|
$4,400.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
2.000
|
$5,000.000
|
$7,000.000
|
$6,600.000
|
$6,300.000
|
$2,300.000
|
$6,000.000
|
$6,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,250.000
|
$2,000.000
|
$1,200.000
|
$1,800.000
|
$800.000
|
$1,600.000
|
$1,850.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$1,500.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$1,700.000
|
$500.000
|
$800.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$205.000
|
$500.000
|
$1,000.000
|
$500.000
|
$600.000
|
$500.000
|
$840.000
|
|
|
REMOV STR (PIPE)
|
LF
|
124.000
|
$16.000
|
$18.000
|
$22.000
|
$25.000
|
$23.000
|
$12.000
|
$26.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$122,000.000
|
$150,000.000
|
$170,000.000
|
$178,000.000
|
$70,000.000
|
$400,000.000
|
$110,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,000.000
|
$10,000.000
|
$15,500.000
|
$19,500.000
|
$8,000.000
|
$5,000.000
|
$3,200.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,200.000
|
$3.000
|
$1.950
|
$3.250
|
$2.750
|
$2.000
|
$3.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,200.000
|
$0.750
|
$1.050
|
$1.000
|
$0.750
|
$2.000
|
$1.250
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,250.000
|
$7.000
|
$2.890
|
$5.500
|
$4.750
|
$4.000
|
$12.000
|
$6.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,250.000
|
$1.000
|
$1.050
|
$1.100
|
$1.000
|
$1.000
|
$4.000
|
$1.200
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,589.000
|
$7.000
|
$9.000
|
$4.000
|
$17.000
|
$10.000
|
$5.000
|
$9.350
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,738.000
|
$20.000
|
$12.000
|
$9.000
|
$17.000
|
$17.000
|
$7.000
|
$13.580
|
|
|
DRIVEWAYS (ACP)
|
SY
|
336.180
|
$18.000
|
$55.000
|
$70.000
|
$70.000
|
$25.000
|
$120.000
|
$115.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
139.400
|
$115.000
|
$100.000
|
$110.000
|
$110.000
|
$44.000
|
$165.000
|
$235.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$3,100.000
|
$3,000.000
|
$1,500.000
|
$1,500.000
|
$1,869.000
|
$2,500.000
|
$3,100.000
|
|
|
CONC MEDIAN
|
SY
|
105.000
|
$110.000
|
$100.000
|
$83.000
|
$115.000
|
$58.000
|
$255.000
|
$110.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
29.000
|
$150.000
|
$130.000
|
$83.000
|
$240.000
|
$65.000
|
$200.000
|
$155.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
20.000
|
$16.000
|
$8.460
|
$22.000
|
$20.000
|
$11.000
|
$25.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
600.000
|
$9.000
|
$11.600
|
$22.000
|
$20.000
|
$14.000
|
$25.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
30.000
|
$10.000
|
$8.150
|
$16.000
|
$15.000
|
$10.000
|
$18.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
505.000
|
$20.000
|
$26.100
|
$24.000
|
$22.500
|
$33.000
|
$27.000
|
$18.000
|
|
|
CONDT (RM) (2")
|
LF
|
45.000
|
$25.000
|
$28.600
|
$43.000
|
$40.000
|
$36.000
|
$49.000
|
$28.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
1,625.000
|
$1.250
|
$0.840
|
$0.900
|
$0.800
|
$1.000
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
400.000
|
$1.750
|
$1.250
|
$1.650
|
$1.510
|
$2.000
|
$1.800
|
$1.500
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$950.000
|
$1,116.000
|
$1,300.000
|
$1,200.000
|
$1,391.000
|
$1,500.000
|
$1,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
6.250
|
$32.000
|
$31.000
|
$108.000
|
$100.000
|
$39.000
|
$121.000
|
$38.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$510.000
|
$500.000
|
$1,330.000
|
$425.000
|
$685.000
|
$520.000
|
$860.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$875.000
|
$1,200.000
|
$1,870.000
|
$610.000
|
$15.000
|
$740.000
|
$980.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,080.000
|
$1.250
|
$0.950
|
$2.050
|
$0.950
|
$1.000
|
$1.240
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,333.000
|
$1.250
|
$0.950
|
$2.050
|
$0.950
|
$1.000
|
$1.240
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,760.000
|
$1.250
|
$0.950
|
$2.050
|
$0.950
|
$2.000
|
$1.240
|
$2.200
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
570.000
|
$1.250
|
$1.250
|
$2.700
|
$1.250
|
$3.000
|
$1.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,500.000
|
$1.120
|
$1.300
|
$3.600
|
$1.300
|
$3.000
|
$1.600
|
$4.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
291.000
|
$3.500
|
$3.000
|
$4.200
|
$3.000
|
$4.000
|
$3.600
|
$4.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
177.000
|
$6.750
|
$6.000
|
$8.450
|
$6.000
|
$8.000
|
$8.000
|
$9.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
788.000
|
$1.250
|
$1.500
|
$3.000
|
$1.500
|
$1.000
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY II (Y) (ISLAND)
|
SF
|
258.000
|
$2.250
|
$1.000
|
$3.500
|
$1.000
|
$3.000
|
$1.250
|
$3.700
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
5.000
|
$128.330
|
$125.000
|
$317.000
|
$125.000
|
$31.000
|
$152.000
|
$340.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
830.000
|
$1.700
|
$1.500
|
$2.800
|
$1.500
|
$1.000
|
$1.800
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,503.000
|
$0.500
|
$1.250
|
$2.800
|
$1.250
|
$3.000
|
$1.500
|
$3.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
2,200.000
|
$1.000
|
$1.250
|
$3.250
|
$1.250
|
$1.000
|
$1.500
|
$3.500
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,380.000
|
$0.850
|
$1.250
|
$3.250
|
$1.250
|
$1.000
|
$1.500
|
$3.500
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
5,625.000
|
$0.900
|
$1.250
|
$3.100
|
$1.250
|
$1.000
|
$1.500
|
$3.300
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
36.000
|
$385.000
|
$155.000
|
$260.000
|
$155.000
|
$274.000
|
$200.000
|
$280.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
34.000
|
$385.000
|
$155.000
|
$290.000
|
$155.000
|
$349.000
|
$200.000
|
$300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
136.000
|
$4.500
|
$4.000
|
$7.500
|
$4.000
|
$6.000
|
$5.000
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
283.000
|
$5.000
|
$4.000
|
$7.500
|
$4.000
|
$6.000
|
$5.000
|
$8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
118.000
|
$5.000
|
$4.000
|
$7.500
|
$4.000
|
$5.000
|
$5.000
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,350.000
|
$0.500
|
$0.250
|
$0.450
|
$0.250
|
$1.000
|
$0.330
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
5,799.000
|
$0.750
|
$0.400
|
$0.700
|
$0.400
|
$1.000
|
$0.500
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,449.000
|
$0.850
|
$0.550
|
$0.250
|
$0.550
|
$1.000
|
$0.700
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
12.000
|
$78.000
|
$45.000
|
$60.000
|
$45.000
|
$44.000
|
$55.000
|
$63.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
12.000
|
$78.000
|
$45.000
|
$60.000
|
$45.000
|
$69.000
|
$55.000
|
$63.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
12,666.000
|
$0.050
|
$0.100
|
$0.200
|
$0.100
|
$2.000
|
$0.150
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,665.000
|
$0.210
|
$0.140
|
$0.450
|
$0.140
|
$3.000
|
$0.200
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
291.000
|
$0.400
|
$0.200
|
$0.800
|
$0.200
|
$4.000
|
$0.250
|
$0.850
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
192.000
|
$0.980
|
$0.300
|
$1.650
|
$0.300
|
$6.000
|
$0.400
|
$1.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
36.000
|
$17.500
|
$10.000
|
$22.000
|
$10.000
|
$31.000
|
$12.000
|
$23.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
34.000
|
$18.150
|
$10.000
|
$22.000
|
$10.000
|
$31.000
|
$12.000
|
$23.000
|
|
|
PAV SURF PREP FOR MRK (ISLAND)
|
SF
|
258.000
|
$1.250
|
$0.050
|
$1.250
|
$0.050
|
$2.000
|
$0.100
|
$1.300
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
5.000
|
$45.000
|
$10.000
|
$49.000
|
$10.000
|
$106.000
|
$12.000
|
$52.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
392.000
|
$0.850
|
$1.000
|
$0.550
|
$1.000
|
$1.000
|
$1.250
|
$0.550
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$210.000
|
$236.000
|
$270.000
|
$250.000
|
$294.000
|
$300.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$200.000
|
$236.000
|
$270.000
|
$250.000
|
$294.000
|
$300.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$210.000
|
$236.000
|
$270.000
|
$250.000
|
$294.000
|
$300.000
|
$200.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
2.000
|
$100.000
|
$141.000
|
$188.000
|
$175.000
|
$176.000
|
$215.000
|
$120.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
410.000
|
$2.350
|
$2.640
|
$4.300
|
$4.000
|
$3.000
|
$5.000
|
$2.000
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
490.000
|
$2.000
|
$1.740
|
$3.250
|
$3.000
|
$2.000
|
$4.000
|
$1.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$1,700.000
|
$2,392.000
|
$2,200.000
|
$2,000.000
|
$2,981.000
|
$2,500.000
|
$2,200.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
300.000
|
$9.750
|
$8.400
|
$13.000
|
$12.000
|
$10.000
|
$15.000
|
$14.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,000.000
|
$1,000.000
|
$600.000
|
$500.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
|
|
LITTER REMOVAL
|
CYC
|
9.000
|
$1,400.000
|
$500.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
$600.000
|
$850.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
9.000
|
$1,300.000
|
$750.000
|
$2,000.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$1,300.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
1,625.000
|
$5.400
|
$3.520
|
$4.850
|
$4.500
|
$4.000
|
$6.000
|
$5.180
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
1.000
|
$3,000.000
|
$1,204.000
|
$5,400.000
|
$5,000.000
|
$1,501.000
|
$6,000.000
|
$1,700.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
144.000
|
$90.000
|
$93.000
|
$49.000
|
$45.000
|
$116.000
|
$55.000
|
$50.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
600.000
|
$15.000
|
$14.600
|
$24.000
|
$22.000
|
$18.000
|
$27.000
|
$19.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
155.000
|
$30.000
|
$76.600
|
$43.000
|
$40.000
|
$95.000
|
$49.000
|
$26.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
370.000
|
$2.000
|
$2.150
|
$2.150
|
$2.000
|
$3.000
|
$2.500
|
$3.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
80.000
|
$1.000
|
$1.500
|
$6.300
|
$1.500
|
$1.000
|
$1.800
|
$6.800
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
260.000
|
$1.700
|
$1.500
|
$6.350
|
$1.500
|
$1.000
|
$1.800
|
$6.800
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
1,165.000
|
$1.300
|
$2.000
|
$8.450
|
$2.000
|
$2.000
|
$2.500
|
$9.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
15.000
|
$8.000
|
$20.000
|
$30.000
|
$30.000
|
$12.000
|
$36.000
|
$31.000
|
|
|
TMA (STATIONARY)
|
DAY
|
22.000
|
$235.000
|
$500.000
|
$200.000
|
$400.000
|
$250.000
|
$165.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$525.000
|
$150.000
|
$200.000
|
$500.000
|
$250.000
|
$600.000
|
$400.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$4,000.000
|
$2,888.000
|
$2,700.000
|
$2,500.000
|
$3,599.000
|
$3,000.000
|
$2,800.000
|
|
Totals: |
$1,365,814.050
|
$1,598,404.740
|
$1,655,438.410
|
$1,782,331.400
|
$1,808,769.940
|
$1,985,565.170
|
$2,018,933.800
|