County: HARRIS Highway: VA Date: 10/01/2020 (4 years ago) Engineer's Estimate: $425,163 Control Number: 0912-00-526
Project: C 912-00-526 District: HOUSTON Time: 120 WORKING DAYS Type: UPGRADE LIGHTING SYSTEMS
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $425,162.55
VACA UNDERGROUND UTILITIES INC   $291,372.00 1
-31.47% | -$133,790.55
TRAF-TEX, INC.   $308,511.92 2
-27.44% | -$116,650.63
5.88% | $17,139.92
THIRD COAST SERVICES LLC   $392,645.00 3
-7.65% | -$32,517.55
34.76% | $101,273.00
27.27% | $84,133.08
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $398,268.94 4
-6.33% | -$26,893.61
36.69% | $106,896.94
1.43% | $5,623.94
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.   $423,929.32 5
-0.29% | -$1,233.23
45.49% | $132,557.32
6.44% | $25,660.38
MICA CORPORATION   $434,672.17 6
2.24% | $9,509.62
49.18% | $143,300.17
2.53% | $10,742.85
Subcontractor Percentage Amount
BATTEN DRILLING, INC. 6.52% $18,997.45
Total: 6.52% $18,997.45

Bid Items

Items: 20, 0 filtered
HARRIS VA  |  HOUSTON  |  0912-00-526  |  10/01/2020  |  $425,163  |  C 912-00-526  |  UPGRADE LIGHTING SYS  |  120 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate VACA UNDERGROUND UTILITIES INC TRAF-TEX, INC. THIRD COAST SERVICES LLC FLORIDA TRAFFIC CONTROL DEVICES, INC. HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. MICA CORPORATION
416 6027 DRILL SHAFT (HIGH MAST POLE) (66 IN) LF 48.000 $540.000 $875.000 $625.000 $750.000 $1,055.750 $561.580 $733.000
432 6009 RIPRAP (CONC) (CL B) (4") CY 2.720 $450.000 $1,600.000 $1,186.000 $1,000.000 $764.850 $474.750 $1,361.000
500 6001 MOBILIZATION LS 1.000 $38,742.050 $31,800.000 $5,320.000 $39,000.000 $38,529.740 $37,363.260 $38,800.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $8,300.000 $1,000.000 $1,850.000 $6,500.000 $10,064.450 $5,360.000 $6,775.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 65.000 $3.000 $10.000 $3.600 $2.500 $12.710 $2.730 $15.850
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 65.000 $0.700 $1.000 $0.500 $1.000 $6.680 $0.530 $8.500
610 6006 REMOVE RD IL ASM (BRIDGE MOUNT) EA 26.000 $305.000 $450.000 $260.000 $400.000 $633.730 $319.500 $414.000
610 6007 REMOVE RD IL ASM (SHOE-BASE) EA 1.000 $700.000 $450.000 $260.000 $325.000 $864.660 $745.500 $416.000
610 6009 REMOVE RD IL ASM (TRANS-BASE) EA 25.000 $430.000 $450.000 $260.000 $475.000 $803.130 $479.250 $830.000
613 6008 HI MST IL POLE (175 FT)(100 MPH) EA 1.000 $35,500.000 $50,000.000 $36,185.000 $48,000.000 $41,701.350 $39,459.550 $35,735.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 55.000 $7.500 $15.000 $10.000 $15.000 $13.680 $29.760 $33.000
620 6007 ELEC CONDR (NO.8) BARE LF 55.000 $1.200 $2.000 $0.900 $1.300 $1.070 $27.070 $2.600
620 6008 ELEC CONDR (NO.8) INSULATED LF 110.000 $1.250 $2.000 $1.000 $1.600 $1.210 $27.070 $2.750
624 6010 GROUND BOX TY D (162922)W/APRON EA 2.000 $1,120.000 $1,000.000 $585.000 $875.000 $840.410 $938.000 $1,510.000
628 6002 REMOVE ELECTRICAL SERVICES EA 1.000 $500.000 $450.000 $900.000 $625.000 $200.500 $798.750 $522.000
628 6052 ELC SRV TY A 240/480 060(SS)SS(E)GC(U) EA 1.000 $6,200.000 $4,500.000 $6,840.000 $4,650.000 $5,694.310 $5,787.000 $8,255.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 10.000 $2,000.000 $600.000 $640.000 $1,000.000 $1,044.990 $852.000 $2,310.000
6156 6011 LED HI MST IL ASM (8 FIXT)(ASM)(TY A) EA 1.000 $27,000.000 $34,000.000 $22,915.000 $27,500.000 $30,040.850 $30,479.150 $28,670.000
6185 6002 TMA (STATIONARY) DAY 120.000 $190.000 $125.000 $154.000 $250.000 $390.870 $196.080 $88.050
6220 6001 MODIFY HIGH MAST ASSEMBLY EA 7.000 $25,000.000 $10,000.000 $21,640.000 $18,500.000 $10,042.770 $26,908.550 $24,385.000
Totals: $425,162.55 $291,372.00 $308,511.92 $392,645.00 $398,268.94 $423,929.32 $434,672.17