HARRIS SH 249 (0720-03-152)

Items: 77

County: HARRIS
Length: 8.8510 MILES
Highway: SH 249
District: HOUSTON
Control Number: 0720-03-152
DBE Goal: 6.0%
Project: F 2B24(464)
Guaranty: $100,000.00
Time: 195 WORKING DAYS
Engineer's Estimate: $9,898,221.06
Date: 09/05/2024 (1 year ago)
Contract Number: 9243013
Type: REHAB OF TRAFFIC MANAGEMENT
Project ID: A00188500
Project Description: ILLUMINATION, OVHS STRUCTURE SUPPORT, PAVEMENT MARKINGS AND GUARD RAIL.
Mail/Deliver Bids To: N/A
PHILLIP GARLIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,898,221.06
$7,878,085.95
Over/Under Est: -20.41% -$2,020,135.11
$7,895,977.60
Over/Under Est: -20.23% -$2,002,243.46
Amt Left: 0.23% $17,891.65
$9,736,461.16
Over/Under Est: -1.63% -$161,759.90
Amt Left: 23.59% $1,858,375.21
Delta: -23.31% -$1,840,483.56
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 7.49% $596,557.07
DECO CONTRACTORS, INC. 7.33% $583,813.53
TRAFFIC SIGNS & LINES, LLC 5.82% $463,546.35
MTAM CORPORATION 1.61% $128,231.89
SOUTH TEXAS PAINTING 1.02% $81,240.08
A&J REBAR LLC 0.17% $13,540.01
SHAW DRILLING, LLC 0.06% $4,778.83
Total: 23.50% $1,871,707.76

Bid Items & Bid Tabulations

77 Total 0 of 77
HARRIS  |  SH 249  |  HOUSTON  |  0720-03-152  |  09/05/2024  |  $9,898,221.06  |  F 2B24(464)  |  REHAB OF TRAF MGT  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
ISI CONTRACTING, INC.
MC2 CIVIL, LLC
REMOV CONC (MOWSTRIP)
SY 3,590.000 $17.550 $13.250 $8.000 $40.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 258.000 $350.000 $457.410 $375.000 $475.000
CONCRETE PAINT FINISH
SF 359,652.000 $3.150 $0.240 $0.250 $0.300
RIPRAP (MOW STRIP)(4 IN)
CY 408.000 $350.000 $606.040 $605.000 $1,200.000
RETROFIT RAIL (TY SSTR)
LF 7,848.000 $195.760 $80.070 $115.000 $150.000
MOBILIZATION
LS 1.000 $700,000.000 $785,400.000 $748,500.000 $970,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $50,000.000 $23,750.000 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 404.000 $200.000 $53.810 $130.000 $75.000
TMA (STATIONARY)
DAY 390.000 $220.000 $170.570 $220.000 $300.000
TMA (MOBILE OPERATION)
HR 96.000 $350.000 $104.110 $95.000 $60.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 10,560.000 $36.980 $12.000 $11.000 $15.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 63,360.000 $7.000 $5.080 $5.500 $8.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 10,560.000 $8.000 $10.070 $10.000 $5.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 45,226.000 $5.000 $8.000 $7.000 $7.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 36,732.000 $75.000 $70.230 $77.000 $100.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 231.000 $340.000 $226.340 $225.000 $450.000
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 1,700.000 $125.000 $113.140 $200.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 7,575.000 $25.000 $22.220 $22.000 $26.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,000.000 $1,670.340 $1,600.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 19.000 $1,500.000 $1,349.620 $1,300.000 $1,250.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 15.000 $960.000 $930.960 $900.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 7,270.000 $3.500 $2.150 $2.100 $2.250
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $270.000 $161.440 $161.000 $200.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 14.000 $200.000 $161.440 $161.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $18.000 $193.730 $193.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $4,100.000 $3,229.830 $3,064.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $200.000 $193.730 $190.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $1,485.000 $2,690.630 $2,600.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,250.000 $1,937.250 $1,900.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $18,000.000 $27,713.440 $26,468.000 $34,500.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 3.000 $18,215.000 $9,740.060 $9,423.000 $9,500.000
REMOVE RD IL ASM (CTB MOUNT)
EA 8.000 $902.100 $968.630 $611.000 $1,000.000
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 8.000 $6,454.000 $8,233.310 $5,706.000 $8,500.000
CONDT (PVC) (SCH 80) (2")
LF 1,759.000 $19.360 $13.940 $9.500 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 270.000 $32.840 $30.140 $16.000 $31.000
ELEC CONDR (NO.8) BARE
LF 2,032.000 $1.930 $2.640 $1.000 $2.750
ELEC CONDR (NO.8) INSULATED
LF 4,064.000 $2.150 $2.850 $1.500 $3.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,600.000 $1,711.240 $1,181.000 $1,750.000
ALUMINUM SIGNS (TY O)
SF 1,211.250 $40.000 $30.140 $26.000 $31.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $85,450.000 $105,472.500 $71,860.000 $108,000.000
INS OH SN SUP(85 FT BRDG)
EA 1.000 $87,450.000 $101,167.500 $71,021.000 $104,000.000
INS OH SN SUP(95 FT BRDG)
EA 1.000 $96,800.000 $113,006.250 $81,820.000 $115,000.000
REMOVE OVERHD SIGN SUP
EA 3.000 $3,928.000 $9,148.130 $5,957.000 $9,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 121.000 $25.000 $13.450 $13.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 448.000 $25.000 $17.220 $17.000 $23.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 137.000 $22.000 $22.600 $22.000 $29.000
RE PM TY III (W)(6")(SLD)
LF 87,240.000 $1.000 $0.730 $0.500 $0.680
RE PM TY III (W)(6")(BRK)
LF 63,990.000 $1.350 $0.730 $0.500 $0.680
RE PM TY III (W)(6")(DOT)
LF 1,098.000 $1.900 $3.230 $2.500 $3.000
RE PM TY III (W)(8")(SLD)
LF 25,612.000 $1.500 $3.230 $2.500 $3.000
RE PM TY III (W)(12")(SLD)
LF 15,881.000 $2.000 $5.870 $4.500 $5.500
RE PM TY III (W)(12")(DOT)
LF 2,776.000 $2.000 $5.870 $4.500 $5.500
RE PM TY III (Y)(6")(SLD)
LF 86,565.000 $1.000 $0.730 $0.550 $0.680
RE PM TY III (BLK)(6")(SHADOW)
LF 63,990.000 $0.750 $0.730 $0.550 $0.680
PAVEMENT SLER 6"
LF 302,883.000 $0.350 $0.010 $0.010 $0.010
PAVEMENT SLER 8"
LF 25,612.000 $0.400 $0.010 $0.020 $0.010
PAVEMENT SLER 12"
LF 18,657.000 $1.000 $0.010 $0.020 $0.010
PAVEMENT SLER (ARROW)
EA 23.000 $15.000 $10.760 $7.760 $10.000
PAVEMENT SLER (WORD)
EA 2.000 $15.000 $10.770 $7.760 $10.000
PAVEMENT SLER (DBL ARROW)
EA 21.000 $15.000 $10.760 $7.760 $10.000
PREFAB PM TY C (W)(ARROW)
EA 23.000 $250.000 $332.040 $239.410 $300.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $350.000 $469.960 $338.860 $440.000
PREFAB PM TY C (W)(WORD)
EA 21.000 $250.000 $405.700 $292.530 $375.000
REFL PAV MRKR TY II-C-R
EA 4,781.000 $5.000 $6.460 $4.660 $6.000
ELIM EXT PM & MRKS (6")
LF 302,883.000 $0.450 $0.330 $0.240 $0.300
ELIM EXT PM & MRKS (8")
LF 25,612.000 $0.850 $0.600 $0.430 $0.550
ELIM EXT PM & MRKS (12")
LF 18,657.000 $1.250 $2.150 $1.550 $2.000
ELIM EXT PM & MRKS (ARROW)
EA 23.000 $50.000 $80.720 $58.200 $75.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 2.000 $65.000 $80.720 $58.200 $75.000
ELIM EXT PM & MRKS (WORD)
EA 21.000 $50.000 $80.720 $58.200 $75.000
PAV SURF PREP FOR MRK (6")
LF 302,883.000 $0.020 $0.030 $0.020 $0.030
PAV SURF PREP FOR MRK (8")
LF 25,612.000 $0.110 $0.040 $0.030 $0.040
PAV SURF PREP FOR MRK (12")
LF 18,657.000 $0.250 $0.060 $0.050 $0.060
PAV SURF PREP FOR MRK (ARROW)
EA 23.000 $15.000 $10.760 $7.760 $10.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $20.000 $10.770 $7.760 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 21.000 $15.000 $10.760 $7.760 $10.000
PAV SURF PREP FOR MRK (RPM)
EA 4,781.000 $0.200 $0.110 $0.080 $0.100
Totals: $9,898,221.060 $7,878,085.955 $7,895,977.600 $9,736,461.160